Settlement behaviour of hybrid asphalt-ballast railway tracks
Source abstract
Abstract
The use of structural asphalt layers inside ballasted railway tracks is attractive because it can increase track bending stiffness. Therefore, for the first time, this paper investigates the long-term settlement characteristics of asphaltic track in the presence of a subgrade stiffness transition zone. Phased load cyclic compression laboratory tests are performed on a large-scale hybrid asphalt-ballast track, supported by subgrade with varying stiffness. It is found that an asphaltic layer acts as a bridge to shield the subgrade from high stresses. It is also found that the asphalt reduces track settlement, and is particularly effective when subgrade stiffness is low.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: Railway Engineering and Dynamics · Geotechnical Engineering and Underground Structures · Civil and Geotechnical Engineering Research
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (48)
Show source-provided references
1. E. T. Selig, J. M. Waters, Track geotechnology and substructure management. Thomas Telford, 1994.10.1680/tgasm.20139 ↗
2. B. Indraratna, S. Nimbalkar, N. C. Tennakoon, “The Behaviour of Ballasted Track Foundations: Track Drainage and Geosynthetic Reinforcement,” 2010.10.1061/41095(365)241 ↗
3. Geotechnical properties of ballast and the role of geosynthetics in rail track stabilisation10.1680/grim.2006.10.3.91 ↗
4. The Nottingham railway test facility, UK
5. Cyclic loading of railway ballast under triaxial conditions and in a railway test facility10.1007/s10035-009-0144-4 ↗
6. Field assessment of the performance of a ballasted rail track with and without geosynthetics10.1061/(ASCE)GT.1943-5606.0000312 ↗
7. The lateral displacement response of geogrid-reinforced ballast under cyclic loading10.1016/j.geotexmem.2013.07.007 ↗
8. M. S. Dersch, E. Tutumluer, C. T. Peeler, and D. K. Bower, “Polyurethane Coating of Railroad Ballast Aggregate for Improved Performance,” in 2010 Joint Rail Conference, Volume 1, 2010, pp. 337–342.10.1115/JRC2010-36215 ↗
9. Study of railway track stiffness modification by polyurethane reinforcement of the ballast10.1016/j.trgeo.2014.06.005 ↗
10. O. Ajayi, L. Le Pen, A. Zervos, and W. Powrie, “Effects of Random Fibre Reinforcement on the Density of Granular Materials,” in International Symposium on Geomechanics from Micro and Macro, 2014, pp. 1363–1367.10.1201/b17395-246 ↗
11. Scaling relationships for strip fibre – reinforced aggregates10.1139/cgj-2016-0346 ↗
12. Bitumen stabilized ballast: a potential solution for railway track-bed10.1016/j.conbuildmat.2016.07.067 ↗
13. The use of deconstructed tires as elastic elements in railway tracks10.3390/ma7085903 ↗
14. C. L. Ho, H. F. Kashani, D. L. Humphrey, J. P. Hyslip, and W. H. Moorhead, “Modifying the One-Dimensional Response of Ballast Box System Using Resiliently Bound Ballast,” in 2015 Joint Rail Conference, 2015, p. V001T01A005.
15. S. Lakušic, M. Ahac, and I. Haladin, “Experimental investigation of railway track with under sleeper pad,” Proc. 10th Slov. road Transp. Congr., no. October, pp. 386–393, 2010.
16. P. Schneider, R. Bolmsvik, and J. C. O. Nielsen, “In situ performance of a ballasted railway track with under sleeper pads,” Proc. Inst. Mech. Eng. Part F J. Rail Rapid Transit, vol. 225, no. 3, pp. 299–309, May 2011.10.1177/2041301710392479 ↗
17. Viability of using end-of-life tire pads as under sleeper pads in railway10.1016/j.conbuildmat.2014.04.013 ↗
18. Analysis of the influence of under sleeper pads on the railway vehicle/track dynamic interaction in transition zones10.1177/0954409711430174 ↗
19. Railway track stiffness variations–consequences and countermeasures
20. Test of hot-mix asphalt trackbed over soft subgrade under heavy axle loads
21. J. G. Rose, D. Li, and L. Walker, “Test measurements and performance evaluations of in-Service railway asphalt trackbeds,” Proc. AREMA 2002 Annu. Conf., pp. 30, 2002.
22. J. Rose and H. Lees, “Long-term assessment of asphalt trackbed component materials’ properties and performance,” Proc. AREMA 2008 Annu. Conf., no. September, pp. 28, 2008.
23. J. Rose and L. Bryson, “Hot mix asphalt railway trackbeds: trackbed materials, performance evaluations, and significant implications,” Proc. Int. Conf. Perpetual Pavements, 2009.
24. J. G. Rose, P. F. Teixeira, and N. E. Ridgway, “Utilization of Asphalt/Bituminous Layers and Coatings in Railway Trackbeds – A Compendium of International Applications,” in Proceedings of the 2010 Joint Rail Conference, 2010, pp. 1–17.10.1115/JRC2010-36146 ↗
25. International design practices, applications, and performances pf asphalt/bituminous railway trackbeds
26. A. Buonanno and R. Mele, “The use of bituminous mix sub-ballast in the Italian state railways,” 2nd Eurasphalt Eurobitume Congr., pp. 1–11, 2000.
27. An investigation into the use of asphalt layers to control stress and strain levels in railway track foundations10.1177/0954409712468850 ↗
28. J. G. Rose, B. Su, and F. Twehues, “Comparisons of railroad track and substructure computer model predictive stress values and in-situ stress measurements,” in AREMA 2004 Annual Conference, 2004, pp. 16p.
29. A dynamic model of ballasted rail track with bituminous sub-ballast layer10.1016/j.sbspro.2012.09.888 ↗
30. Comparative analysis on dynamic behavior of two HMA railway substructures10.1007/BF03325737 ↗
31. Theoretical analysis on ground vibration attenuation using sub-track asphalt layer in high-speed rails10.1007/s40534-015-0081-3 ↗
32. Deformation characteristics of railway roadbed and subgrade under moving-wheel load10.3208/sandf.45.4_99 ↗
33. Performance-based design method for railway asphalt roadbed10.2208/jsceje.63.608 ↗
34. The use of bituminous subballast on future high-speed lines in Spain: structural design and economical impact
35. M. Sol-Sánchez, L. Pirozzolo, F. Moreno-Navarro, and M. C. Rubio-Gámez, “A Study for the Viability of using Warm Mix Asphalt as Bituminous Sub-Ballast for Railway Tracks,” in Proceedings of the Third International Conference on Railway Technology: Research, Development and Maintenance, 2016, p. Paper 6.
36. Application of mastic asphalt waterproofing layer in high-speed railway track in cold regions10.3390/app8050667 ↗
37. Asphalt mixture for the first asphalt concrete directly fastened track in Korea10.1155/2015/701940 ↗
38. Performance evaluation of directly fastened asphalt track using a full-scale test10.1016/j.conbuildmat.2016.02.221 ↗
39. Field, testing and analysis of high speed rail vibrations10.1016/j.soildyn.2014.08.013 ↗
40. Experimental settlement and dynamic behavior of a portion of ballasted railway track under high speed trains10.1016/j.jsv.2008.02.055 ↗
41. Railway subgrade performance during flooding and the post-flooding (recovery) period10.1016/j.trgeo.2017.02.002 ↗
42. Experimental investigation of the characteristics of a granular ballast bed under cyclic longitudinal loading10.1016/j.conbuildmat.2017.12.037 ↗
43. Full-scale model testing on a ballastless high-speed railway under simulated train moving loads10.1016/j.soildyn.2014.08.003 ↗
44. Full scale laboratory testing of ballast and concrete slab tracks under phased cyclic loading10.1016/j.trgeo.2018.08.003 ↗
45. Sandwich model to evaluate railroad asphalt trackbed performance under moving loads10.3141/2117-08 ↗
46. Experimental study on dynamic load magnification factor for ballastless track-subgrade of high-speed railway10.1016/j.jrmge.2013.04.004 ↗
47. Reducing railway track settlement using three-dimensional polyurethane polymer reinforcement of the ballast10.1016/j.conbuildmat.2013.03.002 ↗
48. Comparison of ballast index tests for railway trackbeds10.1680/geng.2004.157.3.151 ↗