journal article·2018-05

Life cycle cost assessment of bitumen stabilised ballast: A novel maintenance strategy for railway track-bed

Marinella Giunta, Sara Bressi, Giacomo D'Angelo

Publisher page

Abstract

Abstract In railway sector, the high quality of the track is ensured by adequate construction methods and frequent maintenance. To reduce the maintenance frequency diverse techniques have been recently developed. Among others, bitumen stabilised ballast (BSB) represents an innovative solution designed to increase ballast service life and reduce overall maintenance burdens. This technology, which can be used for new track-beds as well as to reinforce existing ones, consists of the use of bitumen emulsion (BE) poured or sprayed at ambient temperature onto the ballast. The objective of the present work is to assess the economic feasibility, encompassing the estimation of the costs of the environmental impacts, of this innovative technology (BSB), compared to the traditional ballast (TB). This purpose is achieved using a lifecycle approach where economic and environmental impacts are combined to return an integrated model. Results of Life Cycle Cost Assessment carried out for the baseline scenarios (with respect to traffic level and quality level set for the infrastructure) indicated that: the BSB technology, used since the construction stage and during the routine tamping, can provide economical savings. Sensitivity analysis to main parameters affecting results showed that these savings can vary significantly, especially in relation to the traffic and the discount rate.
Source: openaire · Quality: candidate unverified · Source record ↗

Research context

OpenAlex topics: Railway Engineering and Dynamics · Infrastructure Maintenance and Monitoring · Transport and Economic Policies

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

References (69)

Show source-provided references
1. Baumgartner · 2001
2. Stalder · 2002
3. Automated and cost effective maintenance for railway (acem-rail)
4. Europe 2020 – A European strategy for smart, sustainable and inclusive growth” COM(2010) 2020 of 3 March 2010.
5. EC, Eu Reference Scenario, Energy, transport and GHG emissions - Trends to 2050 2016 Publications Office of the European Union Luxembourg 2016.
6. UIC- International Union of railways 2015. Rail Transport and Environment Facts and Figures.
7. The role of high-speed rail in mitigating climate change – The Swedish case Europabanan from a life cycle perspective10.1016/j.trd.2010.12.004 ↗
8. G. Michas, Slab Track Systems for High-Speed Railways. Master Degree Project. Division of Highway and Railway Engineering Department of Transport Science. School of Architecture and the Built Environment, Royal Institute of Technology, SE-100 44 Stockholm, Sweden, 2012.
9. UIC, 2016. http://www.uic.org (accessed 17.08.09).
10. Salim · 2004
11. Railway track settlements - a literature review
12. Research Results Digest 79
13. Modelling railway track geometry degradation
14. Railway track geometry degradation due to differential settlement of ballast/subgrade e Numerical prediction by an iterative procedure10.1016/j.jsv.2017.10.005 ↗
15. Indraratna · 2011
16. E. T.Selig, J.M. Waters, Track Geotechnology and Substructure Management. T. Telford, 1994.10.1680/tgasm.20139 ↗
17. Fair · 2003
18. Integrated maintenance model for heavy haul tracks, Lausanne
19. Review of the design and maintenance technologies used to decelerate the deterioration of ballasted railway tracks10.1016/j.conbuildmat.2017.09.007 ↗
20. Presti, Bitumen stabilized ballast: a potential solution for railway track-bed10.1016/j.conbuildmat.2016.07.067 ↗
21. Use of bitumen stabilised ballast for improving railway track-bed conventional maintenance
22. Presti, Optimisation of bitumen emulsion properties for ballast stabilisation10.3989/mc.2017.04416 ↗
23. Presti, Novel performance-based technique for predicting maintenance strategy of bitumen stabilised ballast10.1016/j.conbuildmat.2017.11.115 ↗
24. Proposal of a Key Performance Indicator (KPI) of railway track based on LCC and RAMS analyses10.1061/(ASCE)CO.1943-7862.0001422 ↗
25. International Standard Organization (ISO), ISO 15686–5 · 2008 · 2008
26. International Standard Organization (ISO), ISO 14040: 2006. International Standard ISO 14040: Environmental Management - Life Cycle Assessment: Principles and Framework, October. Geneva (Switzerland), 2006.
27. International Standard Organization (ISO), ISO 14044:2006. International Standard ISO 14044: Environmental Management - Life Cycle Assessment: Requirements and Guidelines, October. Geneva (Switzerland), 2006.
28. FHWA-NJ-2003-012 submitted by K. Ozbay, N. Parker, D. Jawad, S. Hussain, Guidelines for Life Cycle Cost Analysis. Final report, 2003.
29. Categorising tools for sustainability assessment10.1016/j.ecolecon.2006.07.023 ↗
30. D. Hunkeler, K. Lichtenvort, G. Rebitzer, Environmental life cycle costing. SETAC, Pensacola, FL (US) in collaboration with CRC Press, Boca Raton, FL, USA, eds. 2008.10.1201/9781420054736 ↗
31. The importance of external costs for assessing the potential of trams and trains for urban freight distribution
32. G. Blauwens, P. De Baere, E. Van de Voorde, Transport economics (6th ed.) Antwerp: De Boeck, 2016.
33. Verbruggen · 2008
34. A. Korzhenevych, N. Dehnen, J. Bröcker, M. Holtkamp, H. Meier, G. Gibson, V. Cox, Update of the handbook on external costs of transport (final report for the European Commission: DG Move). DIW, CAU, Ricardo-AEA139, 2014.
35. European Commission, European Transport White Paper, 2011.
36. de Bruyn · 2010
37. An approach for calculating the environmental external costs of the Belgian building sector10.1111/j.1530-9290.2011.00456.x ↗
38. Calculating cost-effectiveness for activities with multiple environmental effects using the maximum abatement cost method10.1162/108819805775248007 ↗
39. Communicating the eco-efficiency of products and services by means of the eco-costs/value model10.1016/S0959-6526(01)00013-0 ↗
40. Discounting and the environment should current impacts be weighted differently than impacts harming future generations?10.1007/BF02978744 ↗
41. Life cycle assessment of bitumen stabilized ballast: a new maintenance strategy for railway ballast
42. M. Giunta, Assessment of the sustainability of traditional and innovative rail track system, in Proceedings of International Conference on Traffic and Transport Engineering, 24-25 November, Belgrade, Serbia, 2016.
43. F.G. Praticò, M. Giunta, Assessing the sustainability of design and maintenance strategies for rail track by means life cycle cost analysis, in Proceedings of COMPRAIL 2016 15th International Conference on Railway Engineering design and operation, July 19-21Madrid, Spain, 2016.
44. F.G. Praticò, M. Giunta, Issues and perspectives in railway management from a sustainability standpoint, in Proceedings of International Conference on Transportation Infrastructure and Materials, July 16-18, Xian, China, 2016.10.12783/dtetr/ictim2016/5529 ↗
45. Cost and delay of railroad timber and concrete crosstie maintenance and replacement10.3141/2476-06 ↗
46. Schafer · 2008
47. Dingler · 2011
48. Train delay and economic impact of in-service failures of railroad rolling stock10.3141/2261-14 ↗
49. Enhanced parametric railway capacity evaluation tool10.3141/2117-05 ↗
50. L.A.Curran, Life cycle assessment: Principles and practise. National Risk Management Research Laboratory – Office of Research and Development. U.S. Environmental Protection Agency. Cincinnati, 2006
51. GaBi ts Software 7.3.3 & Databases 2017 Edition. Manual.
52. Goedkoop · 2013
53. Monetary valuation in Life Cycle Assessment: a review10.1016/j.jclepro.2014.08.007 ↗
54. A hybridised framework combining integrated methods for environmental Life Cycle Assessment and Life Cycle Costing10.1016/j.jclepro.2017.08.187 ↗
55. Bridging the gap between LCA, LCC and CBA as sustainability assessment tools10.1016/j.eiar.2014.05.001 ↗
56. Fundamentals of life-cycle cost analysis10.3141/1812-25 ↗
57. Shimatake · 1997
58. SMARTRAIL Optimized Whole Life Management of Rail Infrastructure Elements Available at: http://smartrail.fehrl.org/?m=1 2014.
59. P. McMichael, A. McNaughton, The Stoneblower-Delivering the Promise: Development, Testing and Operation of a New Track Maintenance System, in Transportation Research Board annual meeting CD-ROM 2003, Washington D.C.
60. E. Moreno-Martinez, Survey, 2016.
61. Calla · 2003
62. Ethical discounting for civil infrastructure decisions extending over multiple generations10.1016/j.strusafe.2015.06.001 ↗
63. http://www.ecocostsvalue.com
64. B. Steen, R. Carlson, F. Lyrstedt, G. Skantze, Sustainability Management of Businesses through Eco-efficiency – An Example. CPM – Center for Environmental Assessment of Product and Material Systems, Goteborg, Sweden, 2009. http://www.cpm.chalmers.se/document/reports/09/2009_3%20SD%20management%20through%20EE.pdf>.
65. Economic valuation of air pollution mortality: a 9-country contingent valuation survey of value of a life year (VOLY)10.1016/j.ecolind.2010.12.006 ↗
66. Hensley · 2000
67. BS EN 13848-5:2008+A1:2010, Railway Applications – Track – Track Geometry Quality – Part 5: Geometric Quality Levels – Plain Line, 2010.
68. Nurmikolu · 2005
69. Sensitivity analysis for importance assessment10.1111/0272-4332.00040 ↗