Temperature control of hot-poured sealants during the sealing of pavement cracks
Source abstract
Abstract
Abstract Bituminous sealants are applied to asphalt concrete roadways to prevent the ingress of water, brine and debris in the road structure. This delays degradation and extends the pavement service life. Sealants are applied hot, yet little is known about temperature control and temperature variations during typical sealant installations and its affect on sealant properties and performance. To address this issue, sealant temperatures were measured at various points in three common kettles melters during sealant installations. Kettle temperature gauge readings were compared to true sealant temperatures and to recommended application temperatures. The results indicate a mismatch between the suggested and the true installation temperatures due to the lack of kettle gauge calibration, the contractors’ attention to and control of the sealant temperature, and the characteristics of the stirring system. To improve temperature control, it is suggested that installation specifications require a certificate of temperature calibration, that kettles with variable speeds be operated at the fastest and safest practical speed, and that the next generation of kettle be equipped with automated temperature controls.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: Asphalt Pavement Performance Evaluation · Infrastructure Maintenance and Monitoring · Smart Materials for Construction
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (11)
Show source-provided references
1. Hicks RG, Seeds SB, Peshkin DG. Selecting a preventive maintenance treatment for flexible pavements. Foundation for Pavement Preservation, Report FHWA-IF-00-027, Washington, DC, 2000
2. Rout and seal cracks in flexible pavements: a cost effective preventive maintenance procedure
3. Masson JF, Boudreau S, Girard C. Guidelines for sealing and filling cracks in asphalt concrete pavement: A best practice. National Guide to Sustainable Municipal Infrastructure, National Research Council Canada, 2003. Available from: http://www.infraguide.gc.ca/bestmunicipal.html
4. Smith KL, Romine AR. Materials and procedure for sealing and filling cracks in asphalt-surfaced pavements: Manual of practice. Publication No. FHWA-RD-99-147, Federal Highway Administration, Washington DC, 1999
5. Crack sealing in flexible pavements: A life-cycle cost analysis10.1177/0361198196152900111 ↗
6. Crack sealant performance in cold urban conditions10.1139/l99-003 ↗
7. Field evaluation of crack sealing in cold climate
8. Sealant degradation during crack sealing of pavements10.1061/(ASCE)0899-1561(1998)10:4(250) ↗
9. Masson JF, Lacasse MA. A review of adhesion mechanisms at the crack sealant/asphalt concrete interface. In: Wolf AT, editor. Durability of building and construction sealants, RILEM PRO 10. Cachan (Fr): RILEM Publications SARL, 2000. p. 259–74
10. Development of testing pavement crack sealing techniques
11. Havlicek · 1988