Design moment variations in bridges constructed using a balanced cantilever method
Source abstract
Abstract
Abstract This paper introduces simple, but effective, equations to calculate the dead load and cantilever tendon moments in reinforced concrete (RC) bridges constructed using the balanced cantilever method (FCM). Through time-dependent analyses of RC bridges considering the construction sequence and creep deformation of concrete, structural responses related to the member forces are reviewed. On the basis of the compatibility condition and equilibrium equation at every construction stage, basic equations which can describe the moment variation with time in balanced cantilever construction are derived. These are then extended to take into account the moment variation according to changes in the construction steps. By using the introduced relations, the design moment and its variation over time can easily be obtained with only the elastic analysis results, and without additional time-dependent analyses considering the construction sequences. In addition, the design moments determined by the introduced equations are compared with the results from a rigorous numerical analysis with the objective of establishing the relative efficiencies of the introduced equations.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: Structural Health Monitoring Techniques · Seismic Performance and Analysis · Structural Behavior of Reinforced Concrete
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (22)
Show source-provided references
1. AASHTO. Standard specifications for highway bridges. 15th ed. Washington, DC: 1992
2. ACI Committee 209. Prediction of creep, shrinkage and temperature effects in concrete structures. ACI 209R-92, American Concrete Institute Detroit; 1997
3. Analysis of cast-in-place concrete segmental cantilever bridges10.1061/(ASCE)0733-9445(1990)116:5(1247) ↗
4. Barker · 1978
5. Prediction of creep effects using age-adjusted effective modulus method
6. British Standards Institution. Part 4. Code of practice for design of concrete bridges. (BS 5400:Part 4:1984). United Kingdom: Milton Keynes; 1984
7. Long-term deflection control in cantilever prestressed concrete bridges I: control method10.1061/(ASCE)0733-9399(1996)122:6(489) ↗
8. Nonlinear time-dependent analysis of segmentally constructed structures10.1061/(ASCE)0733-9445(1998)124:3(278) ↗
9. Gilbert · 1988
10. Heinz P. RM-spaceframe static analysis of SPACEFRAME. TDA-technische Datenverarbeitung Ges.m.b.H., 1997
11. Kabir AF. Nonlinear analysis of reinforced concrete panels, slabs and shells for time dependent effects. Report No. UC-SEEM 766, Berkeley: University of California; 1976
12. Ketchum MA. Redistribution of stresses in segmentally erected prestressed concrete bridges. UCB/SESM – 86/07, Berkeley: Dept. of Civil Engrg., University of California; 1986
13. Numerical analysis of time-dependent behavior of pre-cast pre-stressed concrete girder bridges10.1016/S0950-0618(01)00027-7 ↗
14. Shrinkage cracking at interior supports of continuous pre-cast pre-stressed concrete girder bridges10.1016/S0950-0618(01)00028-9 ↗
15. Effects of the slab casting sequences and the drying shrinkage of concrete slabs on the short-term and long-term behavior of composite steel box girder bridges. Part I10.1016/S0141-0296(99)00095-4 ↗
16. Effects of the slab casting sequences and the drying shrinkage of concrete slabs on the short-term and long-term behavior of composite steel box girder bridges. Part II10.1016/S0141-0296(99)00096-6 ↗
17. Long-term behavior of composite girder bridges10.1016/S0045-7949(99)00064-4 ↗
18. A study of stress relaxation in prestressing reinforcement10.15554/pcij.04011964.13.57 ↗
19. Neville · 1983
20. Rüsch H, Jungwirth K, Hilsdorf H. Kritische sichtung der verfahren zur berücksichtigung der einflüsse von kriechen und schwinden des betons auf das verhalten der tragwerke. Beton-und Stahlbetonbau; 1973
21. Šmerda · 1988
22. Trost H, Wolff HJ. Zur wirklichkeitsnahen ermittlung der beanspruchungen in abschnittswiese hergestellten spannbeton-ragwerken. Bauingenieur 5, 1970