journal article·2015-09

Refurbishment of ballasted track systems; the technical challenges of quality and decision support tools

Brian Counter, Abid Abu-Tair, Andy Franklin, David Tann

Publisher page

Abstract

Abstract The life of ballast is dependent upon a number of factors mainly traffic loading, drainage, contamination and is clearly related to intervention levels and installation quality standards. The use of mechanised ballast replacement techniques has developed over the last 30 years ranging from intrusive and non-intrusive processes. UK national policies have now recognised refurbishment of ballasted systems as an economic alternative to complete renewal especially in locations of switches and crossing (S&C) layouts. There are ever increasing technical challenges associated with the formation and ballast layer interface which relate to localised track quality and the route based longitudinal integrity of these refurbished discrete locations. This paper identifies current best practice in terms of machinery and the recent specialist applications. Also discussed are the complexities of vehicle and product acceptance and introduction including the development of complementary decision support tools.
Source: openaire · Quality: candidate unverified · Source record ↗

Research context

OpenAlex topics: Railway Engineering and Dynamics · Reliability and Maintenance Optimization · Infrastructure Maintenance and Monitoring

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

References (30)

Show source-provided references
1. Aursudkiy B. Railway Ballast Behaviour under Traffic Loading and Tamping maintenance. PhD Thesis University of Nottingham; 2007.
2. Balfour Beatty. Balfour Beatty Rail. BB Rail Technologies Zitrack Derby; 2013
3. Bonnet · 1996
4. Brown R. The management of the RT1A contract for the Erewash valley line. Atkins WS report no. AM 3644.004-R2 epsom. Surrey (UK); 1997.
5. A measurement system for quick rail inspection and effective track maintenance strategy10.1016/j.ymssp.2006.02.007 ↗
6. Cornish A, Kassa E, Smith R. Investigation of Failure Statistics for Switches and Crossings in the UK. In: 11th Conference Railway Engineering University of Westminster London June 2011; 2011.
7. Counter B. Knowledge management in the UK Rail Infrastructure Industry. University of Derby MBA Dissertation; 2003.
8. De Bold R, Connelly D, Patience S, Forde M. NDT to determine stiffness and fouling of ballast & trackbed on high speed alignments. In: 11th conference railway engineering University of Westminster London June 2011; 2011.
9. Changing the rail industry’s definition of track quality and its regulatory target
10. Squeezing the most out of the West Coast Main Line
11. Geographical information system-based railway maintenance and renewal system
12. Decision support system for railway track maintenance and renewal management10.1061/(ASCE)CP.1943-5487.0000221 ↗
13. Hallisey G. Composite railroad ties with optional integral conduit. US Patent office Grant US 6659362 B1; 2003.
14. IMPROVERAIL. Improved tools for railway capacity and access management. In: Competitive and sustainable growth programme. Lisbon (Portugal): TIS.PT; 2003.
15. Indraratna · 2011
16. Joksimovic P, Vanderwark G. By how much amount of track maintenance works could be decreased 11th railway engineering conference. University of Westminster London June 2011; 2011.
17. McDowell G, Lim W, Collop A. Measuring strength of railway ballast. University of Nottingham; 2003.
18. Middleton S, Brough M, Armitage R. Maintenance liability sites: earthworks & subgrade failure case studies. In: Proceedings of the 2005 railway engineering conference London; 2005.
19. Murthy · 1987
20. Nash C, Coulthard S, Matthews B. Rail track charges in Great Britain – the issue of charging for capacity. In: 8th International conference on competition and ownership in passenger transport. Rio de Janeiro (Brazil); 2003.
21. Network Rail. Network rail product acceptance standard revised; 2011a
22. Network Rail standard NR/L2/EBM/029. .
23. Network Rail. Track asset policy – formal policy document. In: Network rail procedures manual; 2011b.
24. Office of Rail Regulation. Relative infrastructure managers’ efficiency evaluation of gap analysis factors summary report reference BBRT-2312-RP-0003.2011; 2011: Issue 3 .
25. Imperfect maintenance10.1016/S0377-2217(96)00099-9 ↗
26. Profillidis · 2006
27. Railcare/Sersa-UK. Railvac. The ultimate rail maintenance machine; 2009.
28. Ratledge D, Thompson R. Estimated requirements for renewal InterCity civil engineer Derby 1993–2013. British Railways InterCity Internal Document; 1992.
29. Sersa second life product catalogue; 2010: M8003354 .
30. Scully · 2006 · vol. 38(14) · 00172626