journal article·2011-04

Concrete mix pouring sequence for uniform setting and curing of bridge decks

Mourad Y. Riad, Samir N. Shoukry, Eduardo M. Sosa, Gergis W. William

Publisher page

Abstract

Concrete bridge decks are cast in segments using multiple mix batches in a process that can extend up to an entire working day. Construction codes state that the initial concrete must stay plastic over the entire casting operation, however this requirement is practically impossible to achieve with regular casting and curing procedures. This paper reports the experimental evaluation of the performance of a suggested pouring sequence of class K concrete designed for bridge decks, where retarding and accelerating admixtures were used to achieve homogeneous thermo-mechanical concrete properties based on uniform setting and curing at early age. The proposed pouring sequence was investigated in both laboratory conditions as well as in outdoors environment. In order to optimize the resulting properties, the effects of different curing methods were investigated. Taking into consideration variation in environmental conditions at a regular construction season of late spring and summer in West Virginia, the suggested sequence was able to achieve uniform setting times as well as thermal properties while being placed along an entire working day. (A) Reprinted with permission from Elsevier.
Source: openaire · Quality: candidate unverified · Source record ↗

Research context

OpenAlex topics: Concrete and Cement Materials Research · Concrete Properties and Behavior · Building materials and conservation

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

References (31)

Show source-provided references
1. West Virginia Department of Transportation. Bridge Design Manual WVDOT Division of Highways, Charleston WV; 2004. p. 3-11.
2. Iowa Department of transportation. A study of transverse cracks in the Keokuk bridge deck. Final Report. Ames, Iowa; 1986.
3. Kochanski T, Parry J, Pruess D, Schuchardt L, Ziehr J. Premature cracking of concrete bridge decks study. Final Report, Wisconsin Department of Transportation, Madison, Wisconsin; 1990.
4. Structural design actions to mitigate bridge deck cracking10.1061/(ASCE)1084-0680(1997)2:3(118) ↗
5. Investigation of cracking in concrete bridge decks at early ages10.1061/(ASCE)1084-0702(1999)4:2(116) ↗
6. Transverse cracking of concrete bridge decks: state of the art
7. Krauss PD, Rogalla EA. Transverse cracking in newly constructed bridge decks. NCHRP Report No. 380, Transportation Research Board, National Research Council, Washington, DC; 1996.
8. Transportation Research Board. Control of cracking in concrete, state of the art. Transportation Research Circular E-C107. Transportation Research Board, Washington, DC; 2006.
9. Ramachandran · 1995
10. Influence of temperature on setting of concrete containing admixtures10.1016/0950-0618(88)90006-2 ↗
11. Admixture innovation in concrete construction
12. Producing and evaluating portland cement-based rapid strength concrete
13. Rapid-hardening concrete mixes10.1061/(ASCE)0899-1561(2005)17:2(198) ↗
14. Early age cracking of reinforced concrete bridge decks10.1080/15732480500483828 ↗
15. ACI Committee 224. Control of cracking in concrete structures (ACI 224-90R). Farmington Hills, Mich: American Concrete Institute; 1990.
16. ACI Committee 305. Hot weather concreting (ACI 305R-99). Farmington Hills, Mich: American Concrete Institute; 1999.
17. Initial and final setting time of concrete in hot weather10.1007/BF02480528 ↗
18. The importance of concrete temperature control during concrete construction in hot weather conditions
19. Portland Cement Association. Durability of concrete bridge decks – A cooperative study. Final Report, Ill; 1970.
20. Babaei K, Hawkins N. Evaluation of bridge deck protective strategies. NCHRP Report No. 297, Transportation Research Board, National Research Council, Washington, DC; 1987.
21. Curing compounds
22. Vandenbossche JM. A review of the curing compounds and application techniques used by the Minnesota Department of Transportation for Concrete Pavements. MN-RC-2001-06. Minnesota; 1999.
23. Frosch RJ, Radabaugh RD, Blackman DT. Investigation of transverse deck cracking. In: Proceedings of the structures congress, Reston (Va): ASCE; 2002.
24. Evaluation of pavement curing effectiveness and curing effects on concrete properties10.1061/(ASCE)0899-1561(2006)18:3(377) ↗
25. Effect of material properties on cracking in bridge decks10.1061/(ASCE)1084-0702(1999)4:1(8) ↗
26. Charleston WV. West Virginia Department of Transportation. Standard specifications for roads and bridges. WVDOT, Division of Highways; 2000. p. 245–51.
27. Xi J, Shing B, Xie Z. Development of optimal concrete mix designs for bridge decks, Colorado Department of Transportation, CDOT-DTD-R-2001-11, Colorado; 2001.
28. Holland T. Silica fume user’s manual. FHWA-IF-05-16, Washington (DC): Federal Highways Administration; 2005. p. 64–6.
29. ASTM C403/C403M. Standard test method for time of setting of concrete mixtures by penetration resistance. ASTM book of standards, vol. 04.02, West Conshohocken, PA; 2008.
30. Plastic shrinkage cracking and evaporation formulas
31. Bloem D. Plastic cracking of concrete. Engineering information. National ready mixed concrete association/National sand and gravel association; 1960. p. 2.