journal article·2006-06

Analysis of well casing connection pullout

Lu Shuanlu, Han Yong, Terry Changyi Qin, Yuan Pengbin

Engineering Failure Analysis· Volume 13· Issue 4
Publisher page

Abstract

Abstract This paper presents an investigation of a 273.1 × 8.89-mm J55 CSG connection pullout. Material tests of the casing, and make up, break out and tension tests of casing connections were conducted. It is found that the cause of casing pullout is inadequate make up torque and excessive impact load during running down.
Source: openaire · Quality: candidate unverified · Source record ↗

Research context

OpenAlex topics: Drilling and Well Engineering · Offshore Engineering and Technologies · Tunneling and Rock Mechanics

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

References (5)

Show source-provided references
1. API spec 5CT. Specification for casing and tubing. 6th ed. Washington (DC): API; October 1998.
2. API spec 5B. Specification for threading, gauging, and thread inspection of casing, tubing, and line pipe threads. 14th ed. Washington (DC): API; August 1996.
3. API recommended practice 5C5. Recommended practice for evaluation procedures for casing and tubing connection. Washington (DC): API.
4. API recommended practice 5C1. Recommended practice for care and use of casing and tubing. Washington (DC): API.
5. API bulletin 5C2. Bulletin on performance properties of casing, tubing, and drill pipe. Washington (DC): API.