AbstractThis paper documents developments in fatigue cracking of a floating platform that required repair and upgrading during 1999- 2000. The Veslefrikk B (VFB) platform was built in 1985 for drilling exploration but was converted to a production platform in 1989. Shortly thereafter extensive fatigue cracking was discovered and several repairs were made. However, extensive fatigue cracking continued and a retrofitting program was implemented, using various types of grinding and peening techniques. In 1999 the platform was temporarily decommissioned and dry-docked for a comprehensive repair and upgrading program, following the International Institute of welding (IIW) guidelines for weld improvement methods (1), this was completed in only four months. However, after a few more years of service fatigue damage again necessitated new repairs. The majority of cracks occurred in the hull skin plates and caused water leakage. It is noteworthy that cracking this time occurred only in areas of the structure that were left untreated in the first retrofitting program due to low levels of stress from FE analyses in these areas. The paper describes the original repair and strengthening program, and the types of subsequent fatigue damage that necessitated new repairs. The recent life extension program has resulted in the safe operation of the platform for an estimated additional period of 20 years.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: Structural Integrity and Reliability Analysis · Fatigue and fracture mechanics · Hydrogen embrittlement and corrosion behaviors in metals
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (11)
Show source-provided references
1. IIW Recommendations for Weld Toe Improvement by Burr Grinding
2. Repair and Strengthening of the Veslefrikk B Floating Production Platform'
3. [3] P.J. Haagensen, et al., Fatigue Damage Repair and Life Extension of a Floating Production Unit —The VFB Platform Revisited, OMAE Paper 2011-50319201110.1115/OMAE2011-50319 ↗
4. DNV · 2008
5. In-service Observations of Cracks in North Sea Jackets. A Study on Initial Crack Depth and POD Values
6. Probabilistic Inspection Planning of Jacket Structures, OTC1999
7. Johannesen · 2000
8. Vårdal · 2000
9. 2005
10. Bell · 1992 · III-B
11. A Probabilistic Fracture Mechanics Evaluation of Fatigue Failure from Weld Defects