Construction design and construction scheme of prefabricated box girder
Source abstract
Abstract
Construction organization design applicable to China Railway 12 Bureau Group Co., Ltd. Mimeng Railway Kaiyuan beam yard (scope of supply DK54 ∼DK83 000 866) Prefabrication of 270-hole box girders (32 m 237 holes, 24 m (33 holes), Including Kai Dian 1 double-line bridge, Kai Dian 2 double-line super bridge, Kai Dian 3 double-line bridge, Kai Dian 4 double-line bridge, Kai Dian 5 double-line bridge, Nanpanjiang double-line bridge, Lujiang double-line super bridge, Tujia black double-line bridge, Yu San 1 double-line bridge, Yu San 2 double-line bridge, Ya Le double-line bridge, Gan Tangzi super bridge, Longxi dam Lengshuigou double-line super bridge, Yulin Mountain double-line middle bridge, Nandong 1 double-line super bridge, Nandong 2 double-line bridge, Nandong 3 double-line bridge and Nandong 4 double-line bridge.
Source: openalex_inverted_index · Quality: baseline
Research context
OpenAlex topics: Evaluation Methods in Various Fields · Railway Engineering and Dynamics · Structural Engineering and Vibration Analysis
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Shaanxi Key Laboratory of Safety and Durability of Concrete Structures, Xijing University, Xi'an, Shaanxi, PR China
School of Management, Wuhan Donghu University, Wuhan, Hubei, PR China
References (16)
Show source-provided references
1. 10.1109/MIS.2019.294283610.1109/MIS.2019.2942836 ↗
2. Guo T. · Urban Architect. · 2014 · 1673
3. Zhang E. · Theoret. Res. Urban Constr. (Electronic Edition) · 2015 · 2095
4. Screening. Construction technology of concrete for pier columns of bridge in winter construction and budget, 56 (2016).
5. Yin L. · Sustain. Comput.: Inf. Syst. · 2017 · 13 · 15
6. 10.1109/ACCESS.2019.292451510.1109/ACCESS.2019.2924515 ↗
7. 10.1177/107754631878844610.1177/1077546318788446 ↗
8. 10.1109/ACCESS.2017.266926310.1109/ACCESS.2017.2669263 ↗
9. Gao N. · Int. J. Mod. Phys. B. · 2016 · 30 · 165011110.1142/S0217979216501113 ↗
10. Song Q. · J. Anal. Appl. Pyrolysis · 2020 · 145 · 10471610.1016/j.jaap.2019.104716 ↗
11. Chen H. · Sci. Adv. Mater. · 2020 · 12 · 66510.1166/sam.2020.3689 ↗
12. Abdel-Basset M. · Mech. Syst. Sig. Process. · 2020 · 145 · 10694110.1016/j.ymssp.2020.106941 ↗
13. Tang T. · Constr. Eng. Technol. Design · 2015 · 1022
14. Z. Yang, Construction of concrete for bridge pier columns in high cold area, Shanxi Architect. 75(1), 12–23 (2011)
15. Yang C. · Build. Mater. Decor. · 2017 · 3 · 59
16. Zhang R.