Thirty-three Years of Regulating Fire Protection at Commercial U.S. Nuclear Power Plants: Dousing the Flames of Controversy**
Source abstract
Abstract
This article focuses on what have been, and may continue to be, the more controversial aspects of fires at commercial nuclear power plants regulated by the U.S. Nuclear Regulatory Commission. Examining what has transpired in fire protection regulation since the 1975 fire at Browns Ferry Unit 1, which first focused attention on the potential hazard of fire at commercial nuclear power plants, we offer a personal perspective as to whether or not the “the flames of controversy” have been “doused.” We show that significant progress has been made while speculating whether these “flames” may ever truly be extinguished, or only kept under control. No core damage accident has ever occurred at a commercial nuclear power plant due to fire.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: Fire dynamics and safety research · Fire effects on ecosystems · Combustion and Detonation Processes
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (100+)
Show source-provided references
1. Gallucci R (2006) Predicting fire-induced core damage frequencies—a simple ‘sanity check’. Trans Am Nucl Soc (ANS) 94; Reno, 4–8 June 2006
2. Nowlen S, Kazarians M, Wyant F (2001) Risk methods insights gained from fire incidents. NUREG/CR-6738, USNRC, August 2001
3. U.S. Nuclear Regulatory Commission (USNRC) (2002) Recent fires at commercial nuclear power plants in the U.S. Information Notice 2002–27, 20 September 2002
4. 10 CFR 50, Appendix A: Energy: domestic licensing of production and utilization facilities—general design criteria for nuclear power plants
5. USNRC (1976) Recommendations related to Browns Ferry fire. NUREG-0050, February 1976
6. USNRC (1976) Guidelines for fire protection for nuclear power plants. BTP APCSB 9.5-1, 1976
7. 10 CFR §50.48 (1980) Fire protection, Appendix R, fire protection program for nuclear power plants operating prior to January 1, 1979. Federal register, vol 45, no. 105, 29 May 1980
8. Fire protection program for operating nuclear power plants. Federal register, vol 45, no. 225, 19 November 1980
9. USNRC (1981) Standard review plan. Section 9.5.1, fire protection plan. NUREG-0800, July 1981
10. USNRC (1981) Fire protection rule. GL 81-12, 20 February 1981
11. USNRC (1986) Implementation of fire protection requirements. GL 86-10, 24 April 1986
12. USNRC (1984) Recommended fire protection policy and program actions. Memorandum from Fire Protection Policy Steering Committee to William J, Dircks, Executive Director For Operations, USNRC, 26 October 1984
13. 10 CFR §50.12. Specific exemptions
14. USNRC (2001) Fire protection for operating nuclear power plants. RG 1.189, April 2001
15. USNRC (2002) An approach for using probabilistic risk assessment in risk-informed decisions on plant-specific changes to the licensing basis. RG 1.174, Revision 1, November 2002
16. National Fire Protection Association (NFPA) (2005) Standard methods of fire tests of building construction and materials. NFPA 251, 18 August 2005
17. USNRC (1981) Failure of Thermo-Lag® fire barrier material to pass fire endurance test. IN 91-47, 6 August 1981
18. USNRC (1992) Failure of Thermo-Lag 330® fire barrier system to maintain cabling in wide cable trays and small conduits free from fire damage. Bulletin 92-01, 24 June 1992
19. USNRC (1992) Thermo-Lag 330-1® fire barriers. GL 92-08, 17 December 1992
20. USNRC (1993) One hour fire endurance test results for Thermal Ceramics Kaowool®, 3M Company FS-195® and 3M Company Interam E-50® fire barrier systems. IN 93-41, 28 May 1993
21. USNRC (1994) Fire endurance test acceptance criteria for fire barrier systems used to separate redundant safe shutdown trains within the same fire area. Supplement 1 to GL 86-10, 25 March 1994
22. USNRC (2004) Letter from Nils J. Diaz, Chairman, USNRC, to The Honorable Edward J. Markey, U.S. House of Representatives, 16 May 2004
23. USNRC (2005) Fire PRA methodology for nuclear power facilities. NUREG/CR-6850 (EPRI TR-1011989), September 2005
24. USNRC (1992) Potential for loss of remote shutdown capability during a control room fire. IN 92-18, 28 February 1992
25. USNRC (1977) Thermal overload protection for electric motors on motor-operated valves. RG 1.106, March 1977
26. USNRC (1996) Fire protection functional inspection program. SECY-96-297, 24 December 1996
27. USNRC (1975) Reactor safety study: an assessment of accident risks in U.S. commercial nuclear power plants. WASH-1400 (NUREG-75/014), October 1975
28. Kazarians M, Apostolakis G (1977) Some aspects of the fire hazard in nuclear power plants. UCLA-ENG-7748, University of California at Los Angeles, July 1977
29. Fleming K, Houghton W, Scaletta F (1979) A methodology for risk assessment of major fires and its application to a high temperature gas-cooled reactor plant. GA-A15402, General Atomic Co., July 1979
30. Gallucci R, Hockenbury R (1981) Fire-induced loss of nuclear power plant safety functions. Nucl Eng Design 64:135–14710.1016/0029-5493(81)90039-X ↗
31. Commonwealth Edison Co. (1981) Indian Point probabilistic safety study. Chicago
32. Commonwealth Edison Co. (1981) Zion probabilistic safety study. Chicago
33. Siu N (1983) COMPBRN—a computer code for modeling compartment fires. NUREG/CR-3239 (UCLA-ENG-8257)10.2172/6363617 ↗
34. Use of probabilistic risk assessment (PRA) methods in nuclear activities: final policy statement. Federal register, 60 FR 42622, 16 August 1995
35. USNRC (1999) Recommendations for reactor oversight process (ROP) improvements. SECY-99-007, 8 January 1999
36. USNRC (1999) Recommendations for ROP improvements (follow-up to SECY-99-007). SECY-99-007A, 22 March 1999
37. USNRC (2006) Fire protection (triennial). Inspection procedure attachment 71111.05T, 21 April 2006
38. 10 CFR §50.73. Licensee event report system
39. USNRC (1999) Problems associated with post-fire safe-shutdown circuit analyses. IN 99-17, 3 June 1999
40. Nuclear Energy Institute (NEI) (2005). Guidance for post-fire safe shutdown circuit analysis. NEI 00-01, Revision 1, January 2005
41. USNRC (2000) Rationale for temporarily halting certain associated circuits inspection lines of inquiry during fire protection baseline triennial inspections. Letter from John N. Hannon, Chief, Plant Systems Branch, NRR, to Gary M. Holohan, Director, Division of Systems Safety and Analysis, NRR, 29 November 2000
42. USNRC (2000) Enforcement guidance memorandum (EGM)—disposition of violations of Appendix R, Sections III.G and III.L, regarding circuit failures. EGM 98-002, Revision 2, 2 February 2000
43. Electric Power Research Institute (EPRI) (2002) Characterization of fire-induced circuit faults: results of cable fire testing. EPRI TR-1003326, December 2002
44. EPRI (2002) Spurious actuation of electrical circuits due to cable fires: results of an expert elicitation. EPRI TR-1006961, May 2002
45. USNRC (2003) Summary of February 19, 2003, public workshop on risk-informing post-fire safe-shutdown circuit analysis inspection. Memorandum from Joseph L. Birmingham, Project Manager, to Christopher I. Grimes, Director, Policy and Rulemaking Program, NRR, 26 February 2003
46. USNRC (2004) Risk-informed approach for post-fire safe-shutdown circuit inspections. RIS 2004-03, Revision 1, 29 December 2004
47. NEI (2002) Use of manual actions to achieve safe shutdown for fire events. Letter from Alex Marion, Director, Engineering Department, Nuclear Generation Division, NEI, to John Hannon, Chief, Plant Systems Branch, USNRC/NRR, 11 January 2002
48. USNRC (2003) Rulemaking plan on post-fire operator manual actions. SECY-03-0100, 17 June 2003
49. USNRC (2005) Technical basis for fire protection significance determination process (IMC 0609, Appendix F) at power operations. USNRC inspection manual chapter 0308, Attachment 3, Appendix F, 28 February 2005
50. USNRC (2005) Fire protection significance determination process. USNRC inspection manual chapter 0609, Appendix F, 28 February 2005
51. USNRC (1996) Options for pursuing regulatory improvement in fire protection regulations for nuclear power plants. SECY-96-134, 21 June 1996
52. USNRC (1992) Staff plans for elimination of requirements marginal to safety. SECY-92-263, 24 July 1992
53. USNRC (1997) Development of a risk-informed, performance-based regulation for fire protection at nuclear power plants. SECY-97-12, 19 June 1997
54. USNRC (1998) Development of a risk-informed, performance-based regulation for fire protection at nuclear power plants. SECY-98-058, 26 March 1998
55. USNRC (2000) Rulemaking plan, reactor fire protection risk-informed, performance-based rulemaking. SECY-00-0009, 13 January 2000
56. NFPA (2001) Performance-based standard for fire protection for light water reactor electric generating plants. NFPA Standard 805, 9 February 2001
57. Voluntary fire protection requirements for light water reactors: adoption of NFPA 805 as a risk-informed, performance-based alternative. Federal register, 69 FR 33536, 16 June 2004
58. 10 CFR §50.48. Fire protection
59. USNRC (2006) NRC enforcement policy: extension of discretion period of interim enforcement policy. Federal register, 71 FR 19905, 18 April 2006
60. NRC enforcement policy. Federal register, 69 FR 33684, 16 June 2004
61. NEI (2007) License amendment request preparation and review proposal for plants transitioning to 10 CFR §50.48[c]. Letter from Alex Marion, Executive Director, Nuclear Operations and Engineering, Nuclear Generation Division, NEI, to Cornelius Holden, Director, Division of Risk Assessment, USNRC/NRR, 2 February 2007
62. USNRC (2006) Risk-informed, performance-based fire protection for existing light-water nuclear power plants. RG 1.205, May 2006
63. NEI (2005) Guidance for implementing a risk-informed, performance-based fire protection program under 10 CFR §50.48[c]. NEI 04-02, Revision 1, September 2005
64. USNRC (2007) Process for communicating clarifications of staff positions provided in Regulatory Guide 1.205 concerning issues identified during the pilot application of National Fire Protection Association standard 805. RIS 2007-19, August 2007
65. USNRC (2005) Compensatory measures to satisfy the fire protection program requirements. RIS 2005-07, April 2005
66. USNRC (2005) Clarification of post-fire safe-shutdown circuit regulatory requirements. RIS 2005-30, December 2005
67. USNRC (2006) Regulatory expectations with Appendix R, Paragraph III.G.2 operator manual actions. RIS 2006-10, June 2006
68. USNRC (2006) Post-fire safe-shutdown circuit analysis spurious actuations. GL 2006-XX, September 2006
69. USNRC (2004) Regulatory analysis guidelines of the U.S. Nuclear Regulatory Commission. NUREG/BR-0058, Revision 4, September 2004
70. NEI (2006) NRC regulatory analysis of proposed Generic Letter 2006-XX: post-fire safe shutdown circuit analysis, July 11, 2006. Letter from Alex Marion, Executive Director for Nuclear Operations and Engineering, Nuclear Generation Division, NEI, to Gary M. Holohan, Associate Director for Risk Assessment and New Projects, USNRC/NRR, 28 September 2006
71. 10 CFR §50.109. Backfitting
72. USNRC (2006) Staff requirements—SECY-06-0196—issuance of Generic Letter 2006-XX, ‘post-fire safe-shutdown circuits analysis spurious actuations'. 15 December 2006
73. Henneke D (2006) Risk-informed multiple spurious operations in support of NFPA 805. General Electric, presented at the ANS Utility Working Conference, Amelia Island, 7 August 2006
74. NEI (2007) Industry methodology for evaluating multiple spurious operations. Letter from Alex Marion, Executive Director for Nuclear Operations and Engineering, Nuclear Generation Division, NEI, to John Grobe, Associate Director for Engineering and Safety Systems, USNRC/NRR, 21 December 2007
75. USNRC (2007) NRC slides from fire protection steering committee public meeting: circuits resolution. Kansas City, 5 December 2007
76. USNRC (2003) Fire protection: inspection criteria for fire protection manual actions. USNRC Inspection Procedure 71111.05, Enclosure 2, March 2003
77. Draft criteria for determining feasibility of manual actions to achieve post-fire safe shutdown. Federal register, 68 FR 66501, 26 November 2003
78. USNRC (2003) Post-fire operator manual action rulemaking plan. Presented at the NEI Fire Protection Information Forum, Baltimore, 16 September 2003
79. Withdrawal of proposed rule: fire protection program—post-fire operator manual actions. Federal register, 71 FR 11169, 6 March 2006
80. NUREG-1852 (2006) Demonstrating the feasibility and reliability of operator manual actions in response to fire, draft report for comment. Federal register, 71 FR 60200, 12 October 2006
81. USNRC (2007) Demonstrating the feasibility and reliability of operator manual actions in response to fire. NUREG-1852, October 2007
82. USNRC (2005) Results of Hemyc® electrical raceway fire barrier system full scale fire testing. IN 2005-07, 1 April 2005
83. USNRC (2005) Final test reports for MT® 3-hour rated electrical raceway fire barrier systems. Memorandum from John N. Hannon, Chief, Plant Systems Branch, NRR, to David C. Lew, Chief, Probabilistic Risk Analysis Branch, RES, 24 May 2005
84. Gallucci R (2005) Risk significance of Hemyc® electrical raceway fire barrier system failures. Trans Am Nucl Soc (ANS) 93; Washington, 13–17 November 2005
85. USNRC (2006) Potentially nonconforming Hemyc® and MT® fire barrier configurations. GL 2006-03, 10 April 2006
86. NEI (2007) Comments on CAROLFIRE test results. Letter from James Riley, Director of Engineering, Nuclear Generating Division, to Chief of the Rules and Directives Branch, Office of Administration, USNRC, 30 July 2007
87. USNRC (2008) CAROLFIRE test report, volume 1: general test descriptions and the analysis of circuit response data; volume 2: cable fire response data for fire model improvement; volume 3: thermally-induced electrical failure (THIEF) model. NUREG/CR-6931, March–April 2007, January 2008
88. USNRC (2007) Verification and validation (V&V) of selected fire models for nuclear power plant applications. NUREG-1824 (EPRI TR-1011999), May 2007
89. USNRC (2004) Fire dynamics tools. NUREG-1805, December 2004
90. EPRI (2002) Fire modeling guide for nuclear power plant applications. EPRI TR-1002981, Revision 1, August 2002
91. National Institute of Standards and Technology (NIST) (2004) Consolidated model of fire growth and smoke transport (CFAST). NIST Special Publication (SP) 1030, 2004
92. Electricité de France (2004) MAGIC Software Version 4.1.1. HI82/04/024/P, December 2004
93. NIST (2004) Fire dynamics simulator (Version 4) technical reference guide. NIST SP 1018, 2004
94. American Society for Testing and Materials (ASTM) (2004). Evaluating the predictive capability of deterministic fire models. ASTM Standard E1355, 2004
95. USNRC (2004) Plan for the implementation of the Commission’s phased approach to PRA quality. SECY-04-0118, 13 July 2004
96. American Nuclear Society (ANS) (2007). American national standard: fire PRA methodology. ANSI/ANS-58.23-2007, November 2007
97. USNRC (2004) An approach for determining the technical adequacy of PRA results for risk-informed activities. RG 1.200, February 2004
98. American Society of Mechanical Engineers (ASME)/ANS (2007). Standard for level 1/large early release frequency probabilistic risk assessment for nuclear power plant applications. ASME/ANS-Ra-S-2007, December 2007 (draft)
99. Gallucci R (2005) Quantification of judgment: defense-in-depth and safety margin for fire protection. International Topical Meeting on Probabilistic Safety Analysis, PSA’05, San Francisco, 11–15 September 2005
100. USNRC (2007) Results and observations from Duke armored control cable fire-induced spurious operation testing. April 2007