Full Scale Firefighting Tests in the Tistbrottet Mine
Source abstract
Abstract
The paper describes full-scale fire-fighting tests performed in an underground mine. A total of six different methods to fight a full scale fire in a mine tunnel were tested. The methods involved different fire-fighting equipment but were comparable regarding fundamental conditions such as length of response-route, fire-fighting set-up, and smoke and fire size. The aim was to compare different equipment and methods to reach and eventually extinguish the fire. Fire fighters using breathing apparatus (BA) were monitored regarding air consumption, movement speed and local actions and decisions. The results are presented and analyzed in respect to fire-fighting efficiency, front BA operations including moving speed and performed actions, as well as the time to successfully put out the fire. Measurements of heat release rates, temperatures and moving speeds are given in order to quantify the efficiency of the operation. Results indicate that a timespan of 15–30 min is needed for the firefighters to reach the fire source and achieve the extinguishing criteria in five of the tests. The standard equipment and nozzles shows good performance in the tests. A limiting factor on the firefighter’s endurance is the amount of air that is available. As a result from these findings the endurance of BA-teams could improve if focus is put on team organization, lightweight equipment and air supply.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: Fire dynamics and safety research · Fire effects on concrete materials · Engineering and Material Science Research
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (17)
Show source-provided references
1. Bergqvist A, Frantzich H, Hasselrot K, Ingason H, (2001) “Räddningsinsatser vid tunnelbränder—Probleminventering och miljöbeskrivning vid brand i spårtunnel”, Räddningsverket, SRV rapport P21-391/01, Karlstad
2. Ingason H, Bergqvist A, Lönnermark A, Frantzich H, Hasselrot K, (2005) “Räddningsinsatser i vägtunnlar”, Räddningsverket, P21-459/05 (in Swedish)
3. Ingason H, Lönnermark A, Frantzcih H, Kumm M, (2010) “Fire incidents during construction work of tunnels”, SP Technical Research Institute of Sweden, SP Report 2010:83, Borås, Sweden
4. Ingason H, Kumm M, Nilsson D, Lönnermark A, Claesson A, Li Y, Fridolf K, Åkerstedt R, Nyman H, Dittmer T, Forsén R, Janzon B, Meyer G, Bryntse A, Carlberg T, Newlove-Eriksson L, Palm A, (2012) “The METRO project—Final Report 2010:08”, Mälardalen University, Västerås
5. Ingason H, (2003) “Fire Development in Catastrophic Tunnel Fires (CTF)”, International Symposium on Catastrophic Tunnel Fires (CTF), Borås, Sweden, pp 31–47
6. Beard, A. N., and Carvel, R. O., Handbook of tunnel fire safety - Second Edition, ICE Publishing, 2012.
7. Kim HK, Lönnermark A, Ingason H (201)0 “Effective Firefighting Operations in Road Tunnels”, SP Technical Research Institute of Sweden, SP Report 2010:10, Borås, Sweden
8. Bergqvist A (2003) “What can the fire brigade do about catastrophic tunnel fires?”, International Symposium on Catastrophic Tunnel Fires (CTF), Borås, Sweden, pp 161–175
9. Bergqvist A (2006) “What can the fire brigade do about tunnel fires?”, 2nd International Symposium on Tunnel safety & Security (ISTSS), Madrid, Spain, pp 277–288
10. Ingason H, Bergqvist A, Frantzich H, Hasselrot K, Lundström S (2006) “Planning for manual fire fighting and rescue in tunnels”, Fourth International Conference on Safety in Road and Rail Tunnels, Madrid, Spain, pp 595–604
11. Kumm M, Bergqvist A (2008) “Mobile Ventilation as a Tactic Resource at Tunnel Fires”, International Symposium of Tunnel Safety and Security—ISTSS, 12th–14th of March, Stockholm, Sweden
12. Kumm M, Bergqvist A (2010) “Rescue operations during construction of tunnels”, International Symposium of Tunnel Safety and Security—ISTSS, Frankfurt, Germany
13. Kumm M, Bergqvist A (2010) “Contingency planning for rescue services and tunnel constructors during construction of tunnels”, In Tunnel Design and Construction¨, 25th–27th October, Zürich, Switzerland
14. Bergqvist A, Frantzich H, Hasselrot K, Ingason H (2005) “Fire and rescue operations in tunnel fires: a discussion of some practical issues”. In The Handbook of Tunnel Fire Safety (A. Beard and R. Carvel, Eds.), Thomas Telford Publishing, London, pp 481–50410.1680/hotfs.31685.0023 ↗
15. Huggett, C., “Estimation of Rate of Heat Release by Means of Oxygen Consumption Measurements”, Fire and Materials, 4, 2, 61-65, 1980.10.1002/fam.810040202 ↗
16. Ingason, H., “Correlation between temperatures and oxygen measurements in a tunnel flow”, Fire Safety Journal, 42, 75-80, 2007.10.1016/j.firesaf.2006.08.003 ↗
17. Ingason H (2012) “Fire Dynamics in Tunnels”. In The handbook of tunnel fire safety, 2nd Edtion (A. N. Beard and R. O. Carvel, Eds.), ICE Publishing, London, pp 273–304