Evaluating feedstock requirements for a 50-megawatt wood-fired electric generating plant.
Source abstract
Abstract
The economic feasibility and feedstock requirements of a 50-MW commercial wood-fired electric-generating plant located in New England are assessed. Wood fuel stocks that would be utilized at such a plant would be solid or chipped roundwood and mill residues. Parameters considered include heat yield per unit wood weight; steam-boiler efficiency; moisture content; overall plant efficiency; and the comparative costs of wood, oil, and gas fuels. Results indicate that a 50-MW power plant would be expected to use about 273,000 tTpy of wood - 75% from whole tree chips and 25% from mill residues. At current energy prices, wood fuels are considered competitive with all other industrial fuels used in New England. The benefit of using wood for power is directly related to upgrading New England's forests by improving cutting practices. 18 references, 1 graph, 6 tables.
Source: openalex_inverted_index · Quality: baseline
Research context
OpenAlex topics: Forest Biomass Utilization and Management · Thermochemical Biomass Conversion Processes · Bioenergy crop production and management
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References
Reference metadata was not supplied for this record.