Simulation and Evaluation of Coordination Mechanisms for a Decentralized Lumber Production System with Coproduction
Source abstract
Abstract
Abstract Sawmilling activities in softwood mills (i.e., wood-sawing, drying, and finishing) cannot be efficiently planned at the operational level in a centralized manner because of the complexity of the production process. Sawmills plan their activities in a decentralized manner (although they try to coordinate them). Thus, specific mathematical models have been developed over the years to support planning for each activity. In the literature, these planning models are usually evaluated and tested independently, or connected using heuristics and evaluated for a fixed demand–planning horizon, assuming a known demand for the entire planning period. In this study, we simulate the use of planning models for decentralized sawmill production, but in a context where new orders arrive randomly and replanning is carried out periodically using a rolling horizon. We also simulated and evaluated different coordination mechanisms at the operational level, highlighting that previously published coordination mechanisms for decentralized planning of sawmilling operations may lead to a low order-fill rate when used in such a dynamic environment. We then propose a more advanced push–pull coordination mechanism based on the concept of decoupling point, revealing that this new mechanism may be more appropriate regarding the market characteristics considered in the study, while leading to a sales increase and reduced inventory. Actual numbers vary depending on specific market conditions.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Forest Biomass Utilization and Management · Forest Management and Policy · Sustainable Supply Chain Management
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
The authors are, respectively, Research Professional and Professor, FORAC Research Consortium, Univ. Laval, Québec, Canada (Ludwig.dumetz.1@ulaval.ca, jonathan.gaudreault@ift.ulaval.ca); Professor and Professor Emeritus, CRAN, Centre de Recherche en Automatique de Nancy, Vandoeuvre, France (elhaouzi5@univ-lorraine.fr, andre.thomas@univ-lorraine.fr); and Professor and Research Professional, FORAC Research Consortium, Univ. Laval, Québec, Canada (Nadia.Lehoux@gmc.ulaval.ca...
References (48)
Show source-provided references
1. Aggarwal, A. K., R. R. Vemuganti, and W. Fetner. 1992. A model-based decision support system for scheduling lumber drying operations. Prod. Oper. Manag. 1(3):320–328.
2. Ahumada, O. and J. R. Villalobos. 2009. Application of planning models in the agri-food supply chain: A review. Eur. J. Oper. Res. 196(1):1–20.
3. Ajayi, A. P. 2016. Analytical study of supply chain collaboration guiding forestry products in a developing economy. Int. J. Bus. Perform. Supply Chain Model8(4):277–298.
4. Alam, M. B., C. Shahi, and R. Pulkki. 2014. Economic impact of enhanced forest inventory information and merchandizing yards in the forest product industry supply chain. Socio-Econ. Plann. Sci. 48:189–197.
5. Alayet, C., N. Lehoux, L. Lebel, and M. Bouchard. 2016. Centralized supply chain planning model for multiple forest companies. INFOR: Inform. Syst. Oper. Res. 54(3):171–191.
6. Alvarez, P. P. and J. R. Vera. 2014. Application of robust optimization to the sawmill planning problem. Ann. Oper. Res. 219(1):457–475.
7. Arnold, J. R. T., S. Chapman, and L. Clive. 2008. Introduction to Materials Management. 6th ed. Pearson Prentice Hall, Upper Saddle River, New Jersey.
8. Arshinder, K., A. Kanda, and S. G. Deshmukh. 2008. Supply chain coordination: Perspectives, empirical studies and research directions. Int. J. Prod. Econ. 115(2):316–335.
9. Arshinder, K., A. Kanda, and S. G. Deshmukh. 2011. A review on supply chain coordination: Coordination mechanisms, managing uncertainty and research directions. In: Supply Chain Coordination Under Uncertainty. T.-M. Choi and T. C.EdwinCheng (Eds.). Springer Berlin Heidelberg, Germany. pp. 39–82.
10. Audy, J. F., N. Lehoux, S. D'Amours, and M. Rönnqvist. 2012. A framework for an efficient implementation of logistics collaborations. Int. Trans. Oper. Res. 19(5):633–657.
11. Ben Ali, M., J. Gaudreault, S. D'Amours, and M.-A. Carle. 2014. A multi-level framework for demand fulfillment in a make-to-stock environment—A case study in Canadian softwood lumber industry. Presented at MOSIM 2014, 10ème Conférence Francophone de Modélisation, Optimisation et Simulation, November 5–7, 2014, Nancy, France.
12. Blackstone, J. H. 2008. APICS Dictionary. 12th ed. American Production & Inventory Control Society, Incorporated, Chicago. 148pp.
13. Cachon, G. P. 2003. Supply chain coordination with contracts. Handbooks in Oper. Res. Manag. Sci.: Supply Chain Manag. 11:227–339.
14. Cid Yáñez, F., J.-M. Frayret, F. Léger, and A. Rousseau. 2009. Agent-based simulation and analysis of demand-driven production strategies in the timber industry. Int. J. Prod. Res. 47(22):6295–6319.
15. Dumetz, L., J. Gaudreault, A. Thomas, N. Lehoux, P. Marier, and H. El-Haouzi. 2016. Evaluating order acceptance policies for divergent production systems with coproduction. Int. J. Prod. Res. 55(13):3631–3643.
16. Elleuch, M. 2013. Collaboration entre les acteurs pour accroître le profit du réseau de création de valeur. Master's thesis. Université Laval, Québec, Canada. (In French.)
17. Gascon, A., P. Lefrançois, and L. Cloutier. 1998. Computer-assisted multi-item, multi-machine and multi-site scheduling in a hardwood flooring factory. Comput. Ind. 36:231–244.
18. Gaudreault, J., P. Forget, J.-M. Frayret, A. Rousseau, S. Lemieux, and S. D'Amours. 2010. Distributed operations planning in the lumber supply chain: Models and coordination. Int. J. Ind. Eng.: Theory Appl. Pract. 17(3):168–189.
19. Gaudreault, J., J.-M. Frayret, and G. Pesant. 2009. Distributed search for supply chain coordination. Comput. Ind. 60(6):441–451.
20. Goldratt, E. M. and J. Cox. 1992. The Goal: A Process of Ongoing Improvement. North River Press, New York.
21. Guajardo, M. and M. Rönnqvist. 2015. Operations research models for coalition structure in collaborative logistics. Eur. J. Oper. Res. 240(1):147–159.
22. Larsson, M., M. Stendahl, and A. Roos. 2016. Supply chain management in the Swedish wood products industry—A need analysis. Scand. J. Forest Res. 31(8):777–787.
23. Lehoux, N., J.-F. Audy, S. D'Amours, and M. Rönnqvist. 2009. Issues and experiences in logistics collaboration.In: Leveraging Knowledge for Innovation in Collaborative Networks. Proceedings, 10th IFIP WG 5.5 Working Conference on Virtual Enterprises.L. M. Camarinha-Matos, I. Paraskakis, and H. Afsarmanesh (Eds.). Springer, Berlin, Heidelberg, Germany. pp. 69–76.
24. Li, X. and Q. Wang. 2007. Coordination mechanisms of supply chain systems. Eur. J. Oper. Res. 179:1–16.
25. Malone, T. W. and K. Crowston. 1994. The interdisciplinary study of coordination. ACM Comput. Surv. (CSUR)26(1):87–119.
26. Marier, P., J. Gaudreault, and T. Noguer. 2016. Kiln drying operations scheduling with dynamic composition of loading patterns. In:Proceedings of ILS, Information System, Logistics and Supply Chain Conference, C. Temponiand N. J. Vandaele (Eds.), June 1–4, 2016, Bordeaux, France; Springer International, New York.
27. Marier, P., J. Gaudreault, and B. Robichaud. 2014. Implementing a MIP model to plane and schedule wood finishing operation in a sawmill: Lessons learned. Presented at MOSIM 2014, 10ème Conférence Francophone de Modélisation, Optimisation et Simulation, November 5–7, 2014, Nancy, France.
28. Maturana, S., E. Pizani, and J. Vera. 2010. Scheduling production for a sawmill: A comparison of a mathematical model versus a heuristic. Comput. Ind. Eng. 59(4):667–674.
29. McLaren, T., M. Head, and Y. Yuan. 2002. Supply chain collaboration alternatives: Understanding the expected costs and benefits. Internet Res. 12(4):348–364.
30. Mendoza, G. A., R. J. Meimban, P. A. Araman, and W. G. Luppold. 1991. Combined log inventory and process simulation models for the planning and control of sawmill operations. Presented at the 23rd CIRP International Seminar on Manufacturing Systems, June 6-7, 1991, Nancy, France.
31. Moyaux, T., B. Chaib-Draa, and S. D'Amours. 2003. Multi-agent coordination based on tokens: Reduction of the bullwhip effect in a forest supply chain. In:Proceedings of the 2nd International Joint Conference on Autonomous Agents and Multiagent Systems, July 14–18, 2003, Melbourne, Victoria, Australia; ACM, New York. pp. 670–677.
32. Muhl, E., P. Charpentier, and F. Chaxel. 2003. Optimization of physical flows in an automotive manufacturing plant: Some experiments and issues. Eng. Appl. Artif. Intell. 16(4):293–305.
33. Occeña, L. G. and D. L. Schmoldt. 1996. Grasp—A prototype interactive graphic sawing program. Forest Prod. J. 46(11):40–42.
34. Öner, S. and T. Bilgic. 2008. Economic lot scheduling with uncontrolled coproduction. Eur. J. Oper. Res. 188(3):793–810.
35. Pinto, J. M., M. Joly, and L. F. L. Moro. 2000. Planning and scheduling models for refinery operations. Comput. Chem. Eng. 24(9):2259–2276.
36. Ramdas, K., and R. E. Spekman. 2000. Chain or shackles: Understanding what drives supply-chain performance. Interfaces30(4):3–21.
37. Rönnqvist, M., S. D'Amours, A. Weintraub, A. Jofre, E. Gunn, R. G. Haight, and C. Romero. 2015. Operations research challenges in forestry: 33 open problems. Ann. Oper. Res. 232(1):11–40.
38. Sargent, R. G. 2013. Verification and validation of simulation models. J. Simul. 7(1):12–24.
39. Simard, V., B. Benhassine, N. Lehoux, J. Gaudreault, and P. Marier. 2016. Réingénierie du processus de planification opérationnelle d'un système de production multi-usines. Presented at MOSIM 2016, 11ème Conférence Francophone de Modélisation, Optimisation et Simulation, August 21–24, 2016, Montréal, Canada.(In French.)
40. Taşkın, Z. C. and A. T. Ünal. 2009. Tactical level planning in float glass manufacturing with co-production, random yields and substitutable products. Eur. J. Oper. Res. 199(1):252–261.
41. Todoroki, C. L. and M. Rönnqvist. 1999. Combined primary and secondary log breakdown optimization. J. Oper. Res. Soc. 50(11):219–229.
42. Todoroki, C. L. and M. Rönnqvist. 2002. Dynamic control of timber production at a sawmill with log sawing optimization. Scand. J. Forest Res. 17:79–89.
43. Turban, E., R. Sharda, and D. Delen. 2011. Decision Support and Business Intelligence Systems. 9th ed. Prentice Hall, Boston.
44. Wery, J., J. Gaudreault, A. Thomas, and P. Marier. 2014. Decision-making framework for tactical planning taking into account market opportunities (new products and new suppliers) in a coproduction context. Presented at MOSIM 2014, 10ème Conférence Francophone de Modélisation, Optimisation et Simulation, November 5–7, 2014, Nancy, France.
45. Winn, M. F., R. H. Wynne, and P. A. Araman. 2004. Alog: A spreadsheet-based program for generating artificial logs. Forest Prod. J. 54(1):62–66.
46. Yaghubian, A. R., T. J. Hodgson, and J. A. Joines. 2001. Dry-or-buy decision support for dry kiln scheduling in furniture production. IIE Trans. 33(2):131–136.
47. Yesilbas, L. G. and M. Lombard. 2004. Towards a knowledge repository for collaborative design process: Focus on conflict management. Com. Ind. 55(3):335 –350.
48. Yu, Z., H. Yan, and T. E. Cheng. 2001. Benefits of information sharing with supply chain partnerships. Ind. Manag. Data Syst. 101(3):114–121.