Integrated Production and Drying-Capacity Planning in Sawmilling: A Multi-Period Mixed Integer Linear Programming Optimization Approach
Source abstract
Abstract
Abstract In lumber production from logs, inventory management is of critical importance due to the natural heterogeneity of raw materials, supply-demand imbalances, and biological degradation risks such as fungal damage. As a multistage and interconnected process involving procurement, sawing, drying, and storage, sawmill operations require coordinated decisions across all stages to maintain efficiency and service reliability. In particular, drying (whether by kiln or natural) often acts as a structural bottleneck, directly influencing lead times, inventory accumulation, and the ability to meet customer demand on time. To address this complexity, this study developed an integrated multiperiod mixed integer linear programming (MILP) model that links raw log procurement, production planning, natural and technical drying allocation, inventory control, and shipment decisions within a unified framework. The model optimizes material flows and capacity utilization while balancing cost efficiency and service performance. A comprehensive sensitivity analysis evaluated the impact of key parameters, including service levels, penalty costs, storage costs, and energy prices. The results indicate that technical (kiln) drying becomes a dominant strategy under high service requirements and elevated shortage penalties, as it enhances system responsiveness and reduces delivery risk. In contrast, natural drying can become competitive under conditions such as lower storage costs or significantly increased energy prices. Overall, the findings provide strategic guidance for sawmill managers and firms considering process upgrades, suggesting that core capacity investments should prioritize technical drying, while natural drying may serve as a complementary flexibility mechanism under appropriate economic conditions.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Forest Biomass Utilization and Management · Forest Management and Policy · Wood Treatment and Properties
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
The authors are Assistant Professors (erkansamikokten@karabuk.edu.tr [corresponding author]; tugrulbayraktar@karabuk.edu.tr), Dept. of Industrial Engineering, Faculty of Engineering and Natural Sci., Karabük Univ., Karabük, Türkiye
References (62)
Show source-provided references
1. Alvarez, P. P. and Vera J. R. 2014. Application of robust optimization to the sawmill planning problem. Ann. Oper. Res. 219(1):457–475. https://doi.org/10.1007/s10479-011-1002-4
2. Beaudoin, D., Lebel L., and Soussi M. A. 2012. Discrete event simulation to improve log yard operations. Infor. Syst. Oper. Res. 50(4):175–185. https://doi.org/10.3138/infor.50.4.175
3. Bowe, S. A., Bumgardner M. S., and Lyon S. 2025. Lumber kiln technology and training needs in the northeastern United States. Forest Prod. J. 75(4):397–403. https://doi.org/10.13073/FPJ-D-25-00041
4. Broz, D., Vanzetti N., Corsano G., and Montagna J. M. 2019. Goal programming application for the decision support in the daily production planning of sawmills. Forest Policy Econ. 102(2018):29–40. https://doi.org/10.1016/j.forpol.2019.02.004
5. Chabanet, S., Bril El-Haouzi H., Morin M., Gaudreault J., and Thomas P. 2023. Toward digital twins for sawmill production planning and control: Benefits, opportunities, and challenges. Int. J. Prod. Res. 61(7):2190–2213. https://doi.org/10.1080/00207543.2022.2068086
6. Dumetz, L., Gaudreault J., El-Haouzi H. B., Thomas A., Lehoux N., and Marier P. 2019. Simulation and evaluation of coordination mechanisms for a decentralized lumber production system with coproduction. Forest Prod. J. 69(4):260–271. https://doi.org/10.13073/FPJ-D-19-00002
7. Dumetz, L., Gaudreault J., Thomas A., Marier P., Lehoux N., and El-Haouzi H. 2015. A simulation framework for the evaluation of production planning and order management strategies in the sawmilling industry. IFAC-PapersOnLine 28(3):622–627. https://doi.org/10.1016/j.ifacol.2015.06.151
8. Dündar, T., Ünsal Ö., and Görgün. H. V. 2017. An overview to modern lumber fabrication. In: Proceedings of the International Conference on Agriculture, Forest, Food Sciences and Technologies, May 15–17, 2017, Cappadocia, Nevsehir, Turkey, 945–952
9. Fries, H. and Mikaelsson S. 2025. Optimizing inventory performance at SCA Rundvik Sawmill: A data-driven simulation approach. Master’s thesis. Department of Mathematics and Mathematical Statistics, Umeå University, Sweden.
10. Hosseini, S. M. and Peer A. 2022. Wood products manufacturing optimization: A survey. IEEE Access 10(October):121653–121683. https://doi.org/10.1109/ACCESS.2022.3223053
11. Huka, M. A. and Gronalt M. 2017. Model development and comparison of different heuristics for production planning in large volume softwood sawmills. Eng. Optim. 49(11):1829–1847. https://doi.org/10.1080/0305215X.2016.1271882
12. Kokten, E. S. and Sel Ç. 2022. A cutting stock problem in the wood products industry: A two-stage solution approach. Int. Trans. Oper. Res. 29:879–907.
13. Lobos, A. and Vera J. R. 2016. Intertemporal stochastic sawmill planning: Modeling and managerial insights. Comput. Ind. Eng. 95(July):53–63. https://doi.org/10.1016/j.cie.2016.02.008
14. Marier, P., Gaudreault J., and Noguer T. 2021. Kiln drying operations scheduling with dynamic composition of loading patterns. Forest Prod. J. 71(2):101–110. https://doi.org/10.13073/FPJ-D-20-00050
15. Maturana, S., Pizani E., and Vera J. 2010. Scheduling production for a sawmill: A comparison of a mathematical model versus a heuristic. Comput. Ind. Eng. 59(4):667–674. https://doi.org/10.1016/j.cie.2010.07.016
16. McDill, M. E., Rebain S. A., and Braze J. 2002. Harvest scheduling with area-based adjacency constraints. Forest Sci. 48(4):631–642.
17. Occena, L. G. and Schmoldt D. L. 1996. GRASP: A prototype interactive graphic sawing program. Forest Prod. J. 46(11/12):40.
18. Rodriguez, S., Broz D. R., Dondo R. G., and Zeballos L. J. 2025. A mathematical model for strategic management of the forest supply chain considering its products and energy generation. Forest Policy Econ. 178(Sep):103535. https://doi.org/10.1016/j.forpol.2025.103535
19. Shahi, S. and Pulkki R. 2013. Supply chain network optimization of the Canadian forest products industry: A critical review. Am. J. Ind. Bus. Manag. 3(7):631–643. https://doi.org/10.4236/ajibm.2013.37073
20. Shahi, S., Pulkki R., Leitch M., and Gaston C. 2017. Optimal production-inventory model for forest products industry supply chain under demand and supply uncertainty: Case study of a pulp mill in Ontario. Cogent Bus. Manag. 4(1):1370765. https://doi.org/10.1080/23311975.2017.1370765
21. Simard, V. 2023. Optimizing the forest supply chain: Data uncertainty through classification, planning and coordination tools. PhD dissertation. Université Laval, Québec, Canada.
22. Singer, M. and Donoso P. 2007. Internal supply chain management in the Chilean sawmill industry. Int. J. Oper. Prod. Manag. 27(5):524–541. https://doi.org/10.1108/01443570710742393
23. Singer, M. and Donoso P. 2008. Upstream or downstream in the value chain? J. Bus. Res. 61(6):669–677. https://doi.org/10.1016/j.jbusres.2007.06.043
24. Stendahl, M. and Eliasson L. 2014. Integrated production of semi-finished components in sawmills, part II: Management of internal operations. Wood Mater. Sci. Eng. 9(1):12–30. https://doi.org/10.1080/17480272.2013.853690
25. Todoroki, C. L. and Rönnqvist E. M. 1999. Combined primary and secondary log breakdown optimisation. J. Oper. Res. Soc. 50(3):219–229.
26. Toyoshima, I., Yamasaki M., and Sasaki Y. 2016. Estimating the moisture content of lumber above the fiber saturation point using stress wave velocity during the natural drying process. Forest Prod. J. 66(7–8):453–460. https://doi.org/10.13073/FPJ-D-16-00001
27. Troncoso, J. J. and Garrido R. A. 2005. Forestry production and logistics planning: An analysis using mixed-integer programming. Forest Policy Econ. 7(4):625–633.
28. Vanzetti, N., Broz D., Corsano G., and Montagna J. M. 2018. An optimization approach for multiperiod production planning in a sawmill. Forest Policy Econ. 97(August):1–8. https://doi.org/10.1016/j.forpol.2018.09.001
29. Weintraub, A., Barahona F., and Epstein R. 1994. A column generation algorithm for solving general forest planning problems with adjacency constraints. Forest Sci. 40(1):142–161.
30. Zanjani, M. K., Ait-Kadi D., and Nourelfath M. 2010a. Robust production planning in a manufacturing environment with random yield: A case in sawmill production planning. Eur. J. Oper. Res. 201(3):882–891. https://doi.org/10.1016/j.ejor.2009.03.041
31. Zanjani, M. K., Nourelfath M., and Ait-Kadi D. 2010b. A multi-stage stochastic programming approach for production planning with uncertainty in the quality of raw materials and demand. Int. J. Prod. Res. 48(16):4701–4723.
32. Alvarez, P. P. and Vera J. R. 2014. Application of robust optimization to the sawmill planning problem. Ann. Oper. Res. 219(1):457–475. https://doi.org/10.1007/s10479-011-1002-4
33. Beaudoin, D., Lebel L., and Soussi M. A. 2012. Discrete event simulation to improve log yard operations. Infor. Syst. Oper. Res. 50(4):175–185. https://doi.org/10.3138/infor.50.4.175
34. Bowe, S. A., Bumgardner M. S., and Lyon S. 2025. Lumber kiln technology and training needs in the northeastern United States. Forest Prod. J. 75(4):397–403. https://doi.org/10.13073/FPJ-D-25-00041
35. Broz, D., Vanzetti N., Corsano G., and Montagna J. M. 2019. Goal programming application for the decision support in the daily production planning of sawmills. Forest Policy Econ. 102(2018):29–40. https://doi.org/10.1016/j.forpol.2019.02.004
36. Chabanet, S., Bril El-Haouzi H., Morin M., Gaudreault J., and Thomas P. 2023. Toward digital twins for sawmill production planning and control: Benefits, opportunities, and challenges. Int. J. Prod. Res. 61(7):2190–2213. https://doi.org/10.1080/00207543.2022.2068086
37. Dumetz, L., Gaudreault J., El-Haouzi H. B., Thomas A., Lehoux N., and Marier P. 2019. Simulation and evaluation of coordination mechanisms for a decentralized lumber production system with coproduction. Forest Prod. J. 69(4):260–271. https://doi.org/10.13073/FPJ-D-19-00002
38. Dumetz, L., Gaudreault J., Thomas A., Marier P., Lehoux N., and El-Haouzi H. 2015. A simulation framework for the evaluation of production planning and order management strategies in the sawmilling industry. IFAC-PapersOnLine 28(3):622–627. https://doi.org/10.1016/j.ifacol.2015.06.151
39. Dündar, T., Ünsal Ö., and Görgün. H. V. 2017. An overview to modern lumber fabrication. In: Proceedings of the International Conference on Agriculture, Forest, Food Sciences and Technologies, May 15–17, 2017, Cappadocia, Nevsehir, Turkey, 945–952
40. Fries, H. and Mikaelsson S. 2025. Optimizing inventory performance at SCA Rundvik Sawmill: A data-driven simulation approach. Master’s thesis. Department of Mathematics and Mathematical Statistics, Umeå University, Sweden.
41. Hosseini, S. M. and Peer A. 2022. Wood products manufacturing optimization: A survey. IEEE Access 10(October):121653–121683. https://doi.org/10.1109/ACCESS.2022.3223053
42. Huka, M. A. and Gronalt M. 2017. Model development and comparison of different heuristics for production planning in large volume softwood sawmills. Eng. Optim. 49(11):1829–1847. https://doi.org/10.1080/0305215X.2016.1271882
43. Kokten, E. S. and Sel Ç. 2022. A cutting stock problem in the wood products industry: A two-stage solution approach. Int. Trans. Oper. Res. 29:879–907.
44. Lobos, A. and Vera J. R. 2016. Intertemporal stochastic sawmill planning: Modeling and managerial insights. Comput. Ind. Eng. 95(July):53–63. https://doi.org/10.1016/j.cie.2016.02.008
45. Marier, P., Gaudreault J., and Noguer T. 2021. Kiln drying operations scheduling with dynamic composition of loading patterns. Forest Prod. J. 71(2):101–110. https://doi.org/10.13073/FPJ-D-20-00050
46. Maturana, S., Pizani E., and Vera J. 2010. Scheduling production for a sawmill: A comparison of a mathematical model versus a heuristic. Comput. Ind. Eng. 59(4):667–674. https://doi.org/10.1016/j.cie.2010.07.016
47. McDill, M. E., Rebain S. A., and Braze J. 2002. Harvest scheduling with area-based adjacency constraints. Forest Sci. 48(4):631–642.
48. Occena, L. G. and Schmoldt D. L. 1996. GRASP: A prototype interactive graphic sawing program. Forest Prod. J. 46(11/12):40.
49. Rodriguez, S., Broz D. R., Dondo R. G., and Zeballos L. J. 2025. A mathematical model for strategic management of the forest supply chain considering its products and energy generation. Forest Policy Econ. 178(Sep):103535. https://doi.org/10.1016/j.forpol.2025.103535
50. Shahi, S. and Pulkki R. 2013. Supply chain network optimization of the Canadian forest products industry: A critical review. Am. J. Ind. Bus. Manag. 3(7):631–643. https://doi.org/10.4236/ajibm.2013.37073
51. Shahi, S., Pulkki R., Leitch M., and Gaston C. 2017. Optimal production-inventory model for forest products industry supply chain under demand and supply uncertainty: Case study of a pulp mill in Ontario. Cogent Bus. Manag. 4(1):1370765. https://doi.org/10.1080/23311975.2017.1370765
52. Simard, V. 2023. Optimizing the forest supply chain: Data uncertainty through classification, planning and coordination tools. PhD dissertation. Université Laval, Québec, Canada.
53. Singer, M. and Donoso P. 2007. Internal supply chain management in the Chilean sawmill industry. Int. J. Oper. Prod. Manag. 27(5):524–541. https://doi.org/10.1108/01443570710742393
54. Singer, M. and Donoso P. 2008. Upstream or downstream in the value chain? J. Bus. Res. 61(6):669–677. https://doi.org/10.1016/j.jbusres.2007.06.043
55. Stendahl, M. and Eliasson L. 2014. Integrated production of semi-finished components in sawmills, part II: Management of internal operations. Wood Mater. Sci. Eng. 9(1):12–30. https://doi.org/10.1080/17480272.2013.853690
56. Todoroki, C. L. and Rönnqvist E. M. 1999. Combined primary and secondary log breakdown optimisation. J. Oper. Res. Soc. 50(3):219–229.
57. Toyoshima, I., Yamasaki M., and Sasaki Y. 2016. Estimating the moisture content of lumber above the fiber saturation point using stress wave velocity during the natural drying process. Forest Prod. J. 66(7–8):453–460. https://doi.org/10.13073/FPJ-D-16-00001
58. Troncoso, J. J. and Garrido R. A. 2005. Forestry production and logistics planning: An analysis using mixed-integer programming. Forest Policy Econ. 7(4):625–633.
59. Vanzetti, N., Broz D., Corsano G., and Montagna J. M. 2018. An optimization approach for multiperiod production planning in a sawmill. Forest Policy Econ. 97(August):1–8. https://doi.org/10.1016/j.forpol.2018.09.001
60. Weintraub, A., Barahona F., and Epstein R. 1994. A column generation algorithm for solving general forest planning problems with adjacency constraints. Forest Sci. 40(1):142–161.
61. Zanjani, M. K., Ait-Kadi D., and Nourelfath M. 2010a. Robust production planning in a manufacturing environment with random yield: A case in sawmill production planning. Eur. J. Oper. Res. 201(3):882–891. https://doi.org/10.1016/j.ejor.2009.03.041
62. Zanjani, M. K., Nourelfath M., and Ait-Kadi D. 2010b. A multi-stage stochastic programming approach for production planning with uncertainty in the quality of raw materials and demand. Int. J. Prod. Res. 48(16):4701–4723.