Show source-provided references
1. AASHTO · 2024
3. Abu-Farsakh · 2014
4. Soft ground improvement below bridge approach foundation using cement deep mixing columns combined with geotextile
10.5937/jaes0-40629 ↗7. Bathe · 1996
9. An experimental investigation of arching in piled embankments
10. An experimental study to determine the location of the critical height in piled embankments
11. BSI · 2010
12. A semi-analytical/FEM model for predicting ground vibrations induced by high-speed train through continuous girder bridge
10.1007/s12206-012-0630-1 ↗19. Development of sustainable alkali activated red mud composite cement: Mechanical properties, hydration mechanisms, and environmental benefits
10.1016/j.conbuildmat.2025.144089 ↗20. Long-term monitoring and analysis of the longitudinal differential settlement of an expressway bridge–subgrade transition section in a loess area
10.1038/s41598-022-23829-y ↗21. Arching in piled embankments: comparison of centrifuge tests and predictive methods-part 1 of 2
23. GGS (German Geotechnical Society) · 2011
25. Unraveling the structural deterioration of isfahan's Sio-Se-Pol historical bridge: a finite element analysis approach
10.1016/j.cscm.2024.e04149 ↗27. Characterizing cyclic and static moduli and strength of compacted pavement subgrade soils considering moisture variation
10.1016/j.sandf.2018.06.003 ↗28. Behaviour of piled bridge abutments on soft ground: a design method proposal based on 2D elasto-plastic-consolidation coupled FEM
10.1016/j.compgeo.2004.02.007 ↗29. Huang · 1993
30. Application of air foam stabilized soil for bridge-embankment transition zone in Thailand
32. JTG D30 · 2015
33. Foam mortar layer in soft subgrade embankment: a review
34. Soft soil consolidation using prefabricated vertical drains: case study of “radès la goulette” bridge project
10.1007/s40515-025-00619-3 ↗40. Evaluation on the dynamic performance of bridge approach backfilled with fibre reinforced lightweight concrete under high-speed train loading
10.1016/j.compgeo.2018.08.003 ↗42. Parametric assessment of structural behavior of integral abutment bridge approach slabs when subjected to live load and thermal effects
10.1061/JBENF2.BEENG-7021 ↗45. u–w formulation for dynamic problems in large deformation regime solved through an implicit meshfree scheme
10.1007/s00466-017-1524-y ↗46. Evaluating the mechanisms and performance of Geosynthetic-Reinforced load transfer platform of pile-supported embankments design methods
10.1016/j.geotexmem.2024.07.009 ↗48. Peiris · 2024 · 225
49. Analysis of temporary preloading for bridge approach embankment to eliminate secondary compression case study: Probolinggo–banyuwangi toll road construction project section 3 STA 40+ 550
10.12962/jifam.v7i0.22482 ↗52. Three-dimensional finite element modelling of a full-scale geosynthetic-reinforced, pile-supported embankment
10.1139/cgj-2014-0506 ↗53. Sakhare · 2024
54. Schneider · 2024 · 2
56. SIMULIA · 2020
57. Piled-supported embankment responses to tunnelling in soft ground: an investigation of settlement and load transfer mechanisms
10.1016/j.tust.2024.106241 ↗59. Thorel · 2025
63. Full-scale model study on variations of soil stress in geosynthetic-reinforced pile-supported track bed with water level change and cyclic loading
10.1139/cgj-2017-0689 ↗67. Reliability analysis for the progressive failure ultimate limit state design in geosynthetic-reinforced rigid pile-supported embankments
10.1016/j.geotexmem.2026.02.001 ↗68. Dynamic response of expressway subgrade under geometric irregularity conditions
70. Serviceability performance of piled embankments considering soil-reinforcement interface interaction
10.1680/jgein.24.00154 ↗71. Calibration of partial factors for tensile strain design in geosynthetic-reinforced and pile-supported embankment
10.1016/j.trgeo.2025.101495 ↗72. Influences of principal stress rotation (PSR) on the cumulative deformation of remoulded loess with different water contents under traffic loading
10.1080/19648189.2019.1626289 ↗73. Semianalytical model of unloading-induced pore-water pressure and consequent consolidation settlement of surcharge preloading railway subgrade
10.1061/(ASCE)GM.1943-5622.0002542 ↗76. Finite-element analysis of a piled embankment with reinforcement compared with BS 8006 predictions
10.1680/geot.14.P.110 ↗77. Three-dimensional behavior of biaxial geogrid in a piled embankment: numerical investigation
10.1139/cgj-2014-0538 ↗78. Finite-element analysis of arching in highway piled embankments subjected to moving vehicle loads
10.1680/jgeot.16.P.266 ↗81. Field test and numerical simulation study of geogrid reinforced gradient pile-supported embankment for controlling the settlement of bridge approach on expressways
10.1016/j.trgeo.2025.101832 ↗