Throughput time analysis in apparel manufacturing
Source abstract
Abstract
Throughput time is investigated for men’s shirt assembly line in garment manufacturing company. The comparison is made between theoretically calculated and actual throughput time. The theoretical throughput time is calculated via starting lag times, lag times and bundle times between succeeding pairs of operations of the product flow process grid critical path. The influence of bundle size on throughput time and work in process is evaluated. The comparison of predicted and actual throughput time shows that predicted time was 10% lesser than experimental one. The evaluation of bundle size effect on throughout time and work in process shows that the bundle size can have great influence on company flexibility and competiveness.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Scheduling and Optimization Algorithms · Product Development and Customization · Operations Management Techniques
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Faculty of Technology and Metallurgy, Department of Textile Engineering Str. Rudjer Boskovic no.16, 1000 Skopje, Macedonia
References
Reference metadata was not supplied for this record.