journal article·2024-09-01Open access

Numerical analysis of pantograph–catenary coupling vibration for high-speed railways

Like Pan, Peihuo Peng, Liming Chen, Fan He

AIP Advances· Volume 14· Issue 9

Abstract

There is a pronounced coupling vibration between the catenary and pantograph during operation for high-speed railways. In this paper, a pantograph–catenary coupling vibration model is constructed to investigate the vibration characteristics under various working conditions. Two different types of catenaries (simple and elastic chain types) are simulated and compared using the finite element method. The pantograph is simplified into a mass–spring–damping combination member, the contact and messenger wires are set to linear beam cells, and the dropper and stitch wire are set to truss cells. The results suggest that the vibration characteristics of the two types of catenaries and pantograph exhibit different trends. The maximum stresses of the messenger wire, dropper, and contact wire do not follow a monotonically increasing trend with the train speed. The maximum stress of the messenger wire under the simple chain type of catenary is higher when the initial contact force increases from 80 to 120 N. However, the maximum stress under the elastic chain type of catenary is higher when the initial contact force is 60 or 140 N. Except for the initial contact force of 140 N, the maximum stresses of the dropper and contact wire under the simple chain type of catenary are lower than those under the elastic chain type. This work provides a valuable reference for optimizing the design of pantograph–catenary systems.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Electrical Contact Performance and Analysis · Railway Systems and Energy Efficiency · Railway Engineering and Dynamics

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Standards & Metrology Research Institute, China Academy of Railway Sciences Corporation Limited 1 , Beijing 100015, China

School of Science, Beijing University of Civil Engineering and Architecture 2 , Beijing 100044, China

Funding

Research Project of China State Railway Group Co., Ltd. · Research Project of China Academy of Railway Sciences Co., Ltd.

References (26)

Show source-provided references
1. Study on the dynamic performance of high-speed railway catenary system with small encumbrance10.1109/tim.2022.3191723 ↗
2. Sensitivity analysis and optimisation of key parameters for railway rigid overhead system and pantograph10.3390/su15086803 ↗
3. A flexible multibody pantograph model for the analysis of the catenary–pantograph contact
4. Full flexible model updating of single-strip pantograph based on modal test10.6052/0459-1879-23-063 ↗
5. Program for catenary–pantograph analysis, PrOSA statement of methods and validation according EN 5031810.1080/00423114.2014.958501 ↗
6. A study on the mechanism of vehicle body vibration affecting the dynamic interaction in the pantograph-catenary system10.1080/00423114.2020.1752922 ↗
7. Dynamic performance simulation and stable current collection analysis of a pantograph catenary system for trolley wire overhead electrically actuated LHD10.3390/en13051015 ↗
8. A computational procedure for the dynamic analysis of the catenary-pantograph interaction in high-speed trains
9. Effect of locomotive-track coupling vibrations on pantograph-catenary system dynamics
10. Research of active vibration control for the pantograph-catenary system
11. Research on vibration control method of train pantograph
12. Experimental modeling of pantograph and coupled vibration analysis of pantograph
13. Research on dynamic characteristics of cantilever locational systems under the interaction between pantograph and catenary
14. Simulation of dynamic behavior of high-speed pantograph-catenary system
15. Effect of overhead contact line pre-sag on the interaction performance with a pantograph in electrified railways10.3390/en15196875 ↗
16. Influence of contact wire pre-sag on the dynamics of pantograph-railway catenary10.1016/j.ijmecsci.2010.04.002 ↗
17. A comparative study on pantograph-catenary models and effect of parameters on pantograph-catenary dynamics under crosswind10.1016/j.jweia.2021.104587 ↗
18. Evaluation of the influence of the speed, preload and span length on the contact forces in the interaction between the pantograph and the overhead conductor rail10.1016/j.engstruct.2021.112678 ↗
19. Test of pantograph and contact system in stiff contact environment
20. Experimental study on natural vibration characteristics of high-speed pantograph
21. Condition monitoring of rail transport systems: A bibliometric performance analysis and systematic literature review10.3390/s21144710 ↗
22. Resilience in railway transport systems: A literature review and research agenda10.1080/01441647.2020.1728419 ↗
23. Study on dynamic interaction of railway pantograph-catenary including reattachment momentum impact10.3390/vibration3010003 ↗
24. Railway pantograph-catenary interaction performance in an overlap section: Modelling, validation and analysis10.1016/j.jsv.2022.117506 ↗
25. Evaluation of the coupled dynamical response of a pantograph-catenary system: Contact force and stresses10.1080/00423110600744656 ↗
26. A spatial coupling model to study dynamic performance of pantograph-catenary with vehicle-track excitation10.1016/j.ymssp.2020.107336 ↗