Life-Cycle Cost Analysis of Alternative Reinforcement Materials for Bridge Superstructures Considering Cost and Maintenance Uncertainties
Source abstract
Abstract
A life-cycle cost analysis (LCCA) was conducted on prestressed concrete bridge superstructures using carbon fiber reinforced polymer (CFRP) bars and strands. Traditional reinforcement materials of uncoated steel with cathodic protection and epoxy-coated steel were also considered for comparison. A series of deterministic LCCAs were first conducted to identify a range of expected cost outcomes for different bridge spans and traffic volumes. Then, a probabilistic LCCA was conducted on selected structures that included activity timing and cost random variables. It was found that although more expensive initially, the use of CFRP reinforcement has the potential to achieve significant reductions in life-cycle cost, having a 95% probability to be the least expensive alternative beginning at year 23–77 after initial construction, depending on the bridge case considered. In terms of life-cycle cost, the most effective use of CFRP reinforcement was found to be for an AASHTO beam bridge in a high traffic volume area.
Source: openalex_inverted_index · Quality: baseline
Research context
OpenAlex topics: Concrete Corrosion and Durability · Structural Behavior of Reinforced Concrete · Infrastructure Maintenance and Monitoring
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Associate Professor of Civil and Environmental Engineering, Wayne State Univ., Detroit, MI 48202 (corresponding author).
Associate Dean of Graduate Studies and Research, Lawrence Technological Univ., Southfield, MI 48075.
Dean and Distinguished Professor, College of Engineering, Lawrence Technological Univ., Southfield, MI 48075.
Graduate Student, Civil Engineering, Lawrence Technological Univ., Southfield, MI 48075.
References (55)
Show source-provided references
1. AASHTO · 1998
2. AASHTO · 2007
3. AASHTO. (2009). LRFD bridge design guide specifications for GRFP-reinforced concrete bridge decks and traffic railings Washington D.C.
4. Advanced Composite Cable Club (ACC). (2002). Rep. of Study Group on Application of Life Cycle Cost Tokyo Japan (in Japanese).
5. American Automobile Association. (2008). Your driving costs AAA Association Communication Brochure Heathrow FL.
6. American Concrete Institute (ACI). (2004). “Prestressing concrete structures with FRP tendons.” ACI 440.4 R-04 Farmington Hills MI.
7. American Concrete Institute (ACI). (2006). “Guide for the design and construction of structural concrete reinforced with FRP bars.” ACI 440.1 R-06 Farmington Hills MI.
8. American Concrete Institute (ACI). (2008). “Building code requirements for structural concrete and commentary.”ACI 318-08 Farmington Hills MI.
9. Bhaskaran R. · Life-cycle cost analysis of a concrete road bridge across open sea · 2006 · 45
10. Burati J. L. Weed R. M. Hughes C. S. and Hill H. S. (1995). “Optimal procedures for quality assurance specifications.” Rep. FHWA-RD-02-095 Federal Highway Administration McLean VA
11. Chandler R. F. (2004). “Life-cycle cost model for evaluating the sustainability of bridge decks.” Rep. No. CSS04-06 Center for Sustainable Systems Univ. of Michigan Ann Arbor MI.
12. Daigle L. and Lounis Z. (2006). “Life cycle cost analysis of high performance concrete bridges considering their environmental impacts.” NRCC-48696 Institute for Research in Construction National Research Council Ottawa Canada.
13. Ehlen M. A. · Life-cycle costs of fiber-reinforced-polymer bridge decks · 1999 · 11
14. Ehlen M. A. and Marshall H. E. (1996). The economics of new-technology materials: A case study of FRP bridge decking National Institute of Standards and Technology (NIST) Gaithersburg MD.10.6028/NIST.IR.5864 ↗
15. Fagen M. E. and Phares B. M. (2000). “Life cycle cost analysis of a low volume road bridge alternative.” Transportation Research Record 1696 Transportation Research Board Washington D.C. 8–13 20001.10.3141/1696-37 ↗
16. Fam A. Z. · Behavior of CFRP for prestressing and shear reinforcements of concrete highway bridges · 1997 · 94
17. Federal Highway Administration (FHWA). (2001). “Long term effectiveness of cathodic protection systems on highway structures.” Publication No. FHWA-RD-01-096 McLean VA.
18. Federal Highway Administration (FHWA). (2002). Life-cycle cost analysis primer Office of Asset Management Federal Highway Administration U.S. DOT Washington D.C.
19. Federal Highway Administration (FHWA). (2005). “Crash cost estimates by maximum police-reported injury severity within selected crash geometries.” FHWA-HRT-05-051 U.S. DOT Washington D.C.
20. Frangopol D. M. · Reliability-based life-cycle management of highway bridges · 2001 · 15
21. Furuta H. Koyama K. and Frangopol D. M. (2007). “Life-cycle performance and cost analysis of bridge network considering seismic risk.” Proc. 13th IFIP WG 7.5 Working Conf. on Reliability and Optimization of Structural Systems: Assessment Design and Life-Cycle Performance Taylor & Francis London 15–26.
22. Gervasio H. · Comparative life-cycle analysis of steel-concrete composite bridges · 2008 · 4
23. Hastak M. · A framework for life-cycle cost assessment of composites in construction · 2003 · 22
24. Hegazy T. Elbeltagi E. and El-Behairy H. (2004). “Bridge deck management system with integrated life-cycle cost optimization.” Transportation Research Record 1866 Transportation Research Board Washington D.C. 44–50 20001.10.3141/1866-06 ↗
25. Huang Y. · Analysis of life-cycle maintenance strategies for concrete bridge decks · 2004 · 9
26. Jensen E. Grace N. Eamon C. D. Shi X. and Matsagar V. (2009). “Life cycle cost analysis of CFRP reinforced concrete bridges.” Proc. Transportation Research Board 88th Annual Meeting Washington D.C.
27. Kaito K. · Bridge management strategy for a steel plate girder bridge based on minimum total life cycle cost · 2001 · 4337
28. Kendall A. · Integrated life-cycle assessment and life-cycle cost analysis model for concrete bridge deck applications · 2008 · 14
29. Meiarashi S. · Life-cycle cost of all-composite suspension bridge · 2002 · 6
30. Michigan DOT . (2010). Traffic monitoring information system (TMIS) of MDOT 〈http://apps.michigan. gov/tmis/〉.
31. Michigan DOT. (MDOT). (2001). Michigan design manual bridge design Lansing MI.
32. Michigan DOT. (MDOT). (2003). Michigan design manual bridge design Lansing MI.
33. Michigan DOT. (MDOT). (2006). “Hours and cost estimate.” Metro region FY 2006 bridge project scoping job summary Lansing MI.
34. Michigan DOT. (MDOT). (2008). Bridge repair cost estimate Lansing MI.
35. Mohammadi J. · Incorporating life-cycle costs in highway-bridge planning and design · 1995 · 121
36. Nishizaki Itaru Takeda Nobufumi Ishizuka Yoshio Shimomura Takumi (2006). “A case study of life cycle cost based on a real FRP bridge.” 3rd Int. Conf. on FRP Composites in Civ. Eng. 〈http://www.pwri.go.jp/eng/activity/pdf/reports/nishizaki.061211.pdf〉 (Mar. 8 2012).
37. Nystrom H. E. · Financial viability of fiber-reinforced polymer (FRP) bridges · 2003 · 19
38. Praticò F. Saride S. and Puppala A. (2011). “Comprehensive life-cycle cost analysis for selection of stabilization alternatives for better performance of low-volume roads.” Transportation Research Record 2204 Transportation Research Board Washington D.C. 120–129 20001.10.3141/2204-16 ↗
39. Rafig M. I. Chryssanthopolus M. and Onoufriou T. (2005). “Comparison of Bridge Management Strategies Using Life-Cycle Cost Analysis.” Proc. 5th Int. Conf. on Bridge Manage. Thomas Telford Publishing London 578–586.
40. Saito M. Kumares C. S. and Anderson V. L. (1988). “Bridge replacement cost analysis.” Transportation Research Record 1180 Transportation Research Board Washington D.C. 19–24 20001.
41. Skitmore M. · Analytical and approximate variance of total project cost · 2002
42. Smith Jeffrey L. · Performance of epoxy-coated rebars in bridge decks · 1996 · 60
43. Sobanjo J. O. and Thompson P. D. (2001). Development of agency maintenance repair and rehabilitation (MR&R) cost data for Florida’s bridge management system Univ. of Florida Rep. to FDOT Gainesville FL.
44. Thoft-Christensen P. · Life-cycle cost-benefit (LCCB) analysis of bridges from a user and social point of view · 2009 · 5
45. Transportation Research Board (TRB). (2000). Highway capacity manual 2000 Washington D.C.
46. Transportation Research Board (TRB). (2003). “Bridge life-cycle cost analysis.” NCHRP Rep. 483 Washington D.C.
47. U.S. DOT. (1997). Memorandum: The value of saving travel time: Departmental guidance for conducting economic evaluations Washington D.C.
48. U.S. DOT Analysis Division. (2002). 2000 work zone traffic crash facts Washington D.C.
49. U.S. DOT Federal Highway Administration. (2007). Highway statistics 2007: Annual vehicle distance traveled in miles and related Data—2007 by highway category and vehicle type Washington D.C.
50. Val D. V. · Factors affecting life-cycle cost analysis of RC structures in chloride contaminated environments · 2007 · 13
51. Vu K. A. T. · Predicting the likelihood and extent of reinforced concrete corrosion-induced cracking · 2005 · 131
52. Weed R. M. (2001). “Derivation of equation for cost of premature pavement failure.” Transportation Research Record 1761 Transportation Research Board Washington D.C. 93–96.10.3141/1761-12 ↗
53. Weyers R. and Goodwin F. E. (1999). “Life-cycle cost analysis for zinc and other protective coatings for steel structures.” Transportation Research Record 1680 Transportation Research Board Washington D.C. 63–73 20001.10.3141/1680-10 ↗
54. Won Jong-Pil · Tensile facture and bond properties of ductile hybrid FRP reinforcing bars · 2007 · 15
55. Zayed T. · Life-cycle cost analysis using deterministic and stochastic methods: Conflicting results · 2002 · 16