Abstract

Fracture of unreinforced welded moment frame connections subjected to simulated seismic loads was caused by the initiation of fatigue cracks and their propagation to critical size. The fatigue cracks initiated at the web-to-flange intersection at the weld access hole, the valleys on the flame-cut weld access hole surface, the weld toe, and weld imperfections. Final fracture occurred when the fatigue crack extended unstably either in the base metal or in the weld metal. Final fracture is determined by the size of a crack, the stresses and strains acting on the crack, and the fracture toughness of the material. This paper presents the methodology used to establish the necessary and sufficient fracture toughness requirement for weld metal used in seismic applications. The methodology was based on fracture mechanics principals and on empirical correlations. The proposed Charpy V-notch (CVN) toughness is 40 ft-lb at 70°F and 20 ft-lb at 0°F for components subjected to +50°F and higher. This CVN requirement should preclude weld metal toughness from being a contributing factor to the fracture of unreinforced moment frame connections. Further improvements in the fracture performance of the connections must be accomplished by changes in design, detailing, fabrication, and inspection.
Source: openalex_inverted_index · Quality: baseline

Research context

OpenAlex topics: Fatigue and fracture mechanics · Fire effects on concrete materials · Structural Load-Bearing Analysis

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

President, Barsom Consulting, Ltd., 1316 Murray Ave., Ste. 300, Pittsburgh, PA 15217.

References (6)

Show source-provided references
1. Barsom J. M. and Rolfe S. T. (1999). Fracture and fatigue control in structues—applications of fracture mechanics 3rd Ed. ASTM West Conshohocken Pa.10.1520/MNL41-3RD-EB ↗
2. Barsom J. M. and Pellegrino J. V. (2000). “Failure analysis of welded beam-to-column connections.” SAC Steel Project–Task 7.1.3 SAC Joint Venture Richmond Calif.
3. Fry G. T. et al. (2000). “Supplemental analysis and testing of reduced beam section components.” SAC Steel Project—Task 7.06 SAC Joint Venture Richmond Calif.
4. Goel S. C. et al. (1999). “Parametric tests on unreinforced connections.” SAC Steel Project—Task 7.023 SAC Joint Venture Richmond Calif.
5. Johnson M. Q. (2000). “State of the art report—joining and inspection.” SAC Steel Project Rep. No. SAC-2006-a SAC Joint Venture Richmond Calif.
6. Ricles J. M. et al. (2000). “Supplemental testing of unreinforced connections with integration of T-stub weld tests and analysis.” SAC Steel Project—Task 7.05 SAC Joint Venture Richmond Calif.