Monitoring of corrosion processes in chloride contaminated mortar by electrochemical measurements and X‐ray tomography
Source abstract
Abstract
Abstract Corrosion of steel reinforcement in concrete exposed to chloride containing environments is a serious problem in civil engineering practice. Electrochemical methods, e.g., potential mapping, provide information whether the steel reinforcement is still passive or depassivation has been initiated. By applying such techniques no information on the type of corrosion, its extent and distribution of corrosion products is available. Particular the corrosion progress is a significant problem. Especially in the case of macrocell corrosion in reinforced concrete structures, the development at the anode cannot be separated into corrosion damage resulting from macrocell corrosion or self‐corrosion. Until now also in laboratory tests it is impossible to collect such information without destroying specimens after electrochemical testing was performed. To overcome this problem it was tried to study the steel surface within the mortar specimens by X‐ray tomography (CT). Within the scope of these investigations it could be shown, that X‐ray tomography is suitable to make corrosion pits and their development visible which are embedded in a mortar with a cover thickness of about 35 mm. In this publication the time‐dependent corrosion damage of reinforced steel is documented by X‐ray tomography.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Concrete Corrosion and Durability · Non-Destructive Testing Techniques · Corrosion Behavior and Inhibition
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (11)
Show source-provided references
1. Interessengemeinschaft Potentialmessung Stahlbeton (IG Pot) Durchführung und Interpretation der Potentialmessung an Stahlbetonbauten Schweizerischer Ingenieur‐ und Architekten‐Verein SIA2006.
2. 1990
3. 10.1002/maco.20060401610.1002/maco.200604016 ↗
4. Isecke B. · 1999 · 396
5. 10.1002/maco.20060401810.1002/maco.200604018 ↗
6. F.Weise Y.Onel F.Dehn International Conference on Concrete Repair Rehabilitation and Retrofitting Cape Town South Africa 2005 pp.170–171.
7. Badde A. · SPIE Opt. Methods Arts Archaeol. · 2005 · 58570U‐1
8. F.Weise U.Müller J.Goebbels Weathering and Conservation (HWC‐2006) Conference Madrid2006.
9. 10.1016/S0169-1317(01)00095-310.1016/S0169-1317(01)00095-3 ↗
10. M.Siitari‐Kauppi N.Marcos P.Klobes J.Goebbels J.Timonen K.‐H.Hellmuth The Palmottu Natural Analogue Project – Physical rock matrix characterisation Report YST‐118 Geological Survey of Finland GTK 2003.
11. DIN‐EN 196‐1 Prüfverfahren für Zement DIN Deutsches Institut für Normung Berlin2005.