Repair of a chemical industry jetty in Aquaba-Jordan
Source abstract
Abstract
The paper presents the results of a two-year work on the inspection, testing and repair of a jetty in the port of Aqaba in Jordan. The jetty was found in a moderately to severely deteriorated state seventeen years after construction. Chloride attack in the splash zone and chemical attack in the deck were diagnosed. Petrographic analysis of concrete in the deck revealed signs of sulfate attack. This was correlated with the chemicals handed on the berth. A comprehensive repair plan was devised and executed with the use of PC blended with GGBS together with pore blockers in the splash zone. The stage was set to monitor the repair works including a location where a variation on the pore blocker in the form of calcium nitrite was introduced.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: BIM and Construction Integration · Innovative concrete reinforcement materials · Concrete and Cement Materials Research
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References
Reference metadata was not supplied for this record.