journal article·2020-06

A novel test method for tendon re-anchorage in bonded post tensioned concrete using ESPI full field measurement

A. O. Abdelatif, J. S. Owen, M. F. M. Hussein

Materials and Structures· Volume 53· Issue 3
Publisher page

Abstract

In this paper, a novel test method is proposed to measure the re-anchorage of a ruptured tendon in bonded post-tensioned concrete. Full-field measurements on post-tensioned concrete prisms (500 × 100 × 100 mm) allow a large number of parameters to be considered. The full-field displacement on the concrete surface after the rupture was recorded using 3D Electronic Speckle Pattern Interferometry (ESPI), which is an optical contactless technique. The results in the paper also demonstrate the power of the ESPI measurements, which allow many more measurements to be made (in this study 256 × 51 point measurements of displacement in concrete prisms) in comparison to conventional techniques such as DEMEC and electrical resistance strain gauges. The comparison of the proposed test method results to the 3D non-linear finite element model predictions shows the strength of the proposed test method for studying the re-anchorage phenomenon of ruptured tendons.
Source: openaire · Quality: candidate unverified · Source record ↗

Research context

OpenAlex topics: Structural Health Monitoring Techniques · Concrete Corrosion and Durability · Advanced Fiber Optic Sensors

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

References (28)

Show source-provided references
1. Concrete Society (2002) Durable bonded post-tensioned concrete bridges, 2nd ed
2. Highways Agency (1999) autoroutes France Service d’études techniques des routes et, Transport Research Laboratory, Laboratoire central des ponts et chaussées, Post-tensioned concrete bridges: Anglo-French liaison report, Thomas Telford, London
3. NCHRP (1998) Durability of precast segmental bridges: final report
4. fib, I.F.F.O.R.S. CONCRETE (2001) Durability of post-tensioning tendons, International Federation for Structural Concrete, Gent - Belgium
5. Highways Agency (1995) The assessment of Concrete Structures affected by Steel Corrosion, BA51/95 Des. Man. Roads Bridg. DMRB, vol 3, sect 4, Part 13
6. Buchner SH, Lindsell P (1987) Testing of prestressed concrete structures during demolition. Struct Assess Use Full Large Scale Test 46–54
7. Geddes JD, Soroka I (1964) Effect of grout properties on transmission length in grout-bonded post-tensioned concrete beams. Mag Concr Res 16:93–9810.1680/macr.1964.16.47.93 ↗
8. Schupack M, Johnston DW (1974) Bond development length tests of a grouted 54 strand post-tensioning tendon. J Am Concr Inst 71:522–525
9. Buchner SH, Lindsell P (1988) Controlled demolition of prestressed concrete structures. In: Kasai Y (ed) Demolition reuse concr. mason. second int. RILEM symp., pp 358–366
10. Coronelli D, Castel A, Vu NA, Franois R (2009) Corroded post-tensioned beams with bonded tendons and wire failure. Eng Struct 31:1687–1697. https://doi.org/10.1016/j.engstruct.2009.02.04310.1016/j.engstruct.2009.02.043 ↗
11. Tanaka Y, Kawano H, Watanabe H, Kimura T (2001) Chloride-induced deterioration and its influence on load carrying capacity of post-tensioned concrete bridges. In: Third int. conf. concr. under sev. cond.—environ. load., pp 495–502
12. Watanabe K, Tadokoro T, Tanimura Y (2011) Evaluation for flexural-load capacity of prestressed concrete girders with broken tendons. Q Rep RTRI 52:224–22910.2219/rtriqr.52.224 ↗
13. Hariharan P (2007) Basics of interferometry, 2nd edn. Academic Press, Boston
14. Jones RA, Wykes C (1989) Holographic and speckle interferometry, 2nd edn. Cambridge University Press, Cambridge10.1017/CBO9780511622465 ↗
15. Jeyasehar CA, Sumangala K (2006) Damage assessment of prestressed concrete beams using artificial neural network (ANN) approach. Comput Struct 84:1709–171810.1016/j.compstruc.2006.03.005 ↗
16. Avril S, Bonnet M, Bretelle A-S, Grédiac M, Hild F, Ienny P, Latourte F, Lemosse D, Pagano S, Pagnacco E (2008) Overview of identification methods of mechanical parameters based on full-field measurements. Exp Mech 48:381–40210.1007/s11340-008-9148-y ↗
17. Dantec Dynamics GmbH (2009) Measurement principles of electronic speckle pattern interferometry (ESPI). Res Educ Meas Princ
18. EN 447 (2007) Grout for prestressing tendons—basic requirements. Br. Stand. Inst
19. Dantec Dynamics GmbH (2008) ISTRA v3.4 software manual Q 300 system V1.5
20. Cavell DG, Waldron P (2001) A residual strength model for deteriorating post-tensioned concrete bridges. Comput Struct 79:361–37310.1016/S0045-7949(00)00150-4 ↗
21. Abdelatif AO, Owen JS, Hussein MFM (2012) Modeling the re-anchoring of a ruptured tendon in bonded post-tensioned concrete, Bond Concr. 2012—Gen Asp Bond J (2012) 233–240. 10.4028/www.scientific.net/KEM.569-570.302
22. Abdelatif AO, Owen JS, Hussein MFM (2013) Re-Anchorage of a Ruptured Tendon in Bonded Post-Tensioned Concrete Beams: model Validation. Key Eng Mater 569–570:302–309. https://doi.org/10.4028/www.scientific.net/KEM.569-570.30210.4028/www.scientific.net/KEM.569-570.302 ↗
23. Abdelatif AO, Owen JS, Hussein MFM (2016) Rapid assessment of bonded post-tensioned concrete beams with ruptured tendons. Sudan Eng Soc J 62:14–17
24. Abdelatif AO, Owen JS, Hussein MFM (2017) Modelling and parametric study of the re-anchorage of ruptured tendons in bonded post-tensioned concrete. J Struct Eng10.1061/(ASCE)ST.1943-541X.0001898 ↗
25. Gebhardt S, Schellberg J, Lock R, Kühbauch W (2006) Identification of broad-leaved dock (Rumex obtusifolius L.) on grassland by means of digital image processing. Precis Agric 7:165–17810.1007/s11119-006-9006-9 ↗
26. Sakuldee R, Udomhunsakul S (2007) Objective performance of compressed image quality assessments. Int J Comput Sci 2:258–267
27. Abdelatif AO (2013) Assessment of bonded post-tensioned concrete with ruptured tendons. University of Nottingham, Nottingham
28. Devore JL, Farnum NR (2005) Applied statistics for engineers and scientists, 2nd edn. Thomson Brooks/Cole, Belmont