journal article·2023-03Open access

Cross-project prediction for rock mass using shuffled TBM big dataset and knowledge-based machine learning methods

YunPei Zhang, ZuYu Chen, Feng Jin, LiuJie Jing, Hai Xing, PengYu Li

Abstract

Extensive research has confirmed the successful prediction of rock mass quality in tunnel boring machine (TBM) construction using machine learning methods based on big data collected during the boring process. However, the developed model cannot be applied to a new project owing to the different mechanical and environmental features involved in different projects. This study tries to combine the datasets of three TBM projects whose cutterhead diameters are 5.2, 7.9 and 9.8 m, respectively. In this study, machine learning focused on predictions of a binary rock mass quality system was implemented using this unified dataset by adding the diameter and disc cutter number as new attributes into the input. The process consists of: (1) individual learning for the three respective datasets, (2) shuffled learning for the unified dataset containing randomly distributed information from the three projects, and (3) crossed learning aimed at validating that the algorithm developed on the unified dataset can produce predictions with equally acceptable accuracies as those obtained in the individual learning. It is anticipated that with more datasets joining this cross-project learning, we will be able to develop a machine learning algorithm that is suitable for new projects with a wide range of cutterhead diameters and disc cutter numbers at the beginning of the tunnel excavation.
Source: expertdata · Quality: candidate unverified · Source record ↗

Research context

OpenAlex topics: Tunneling and Rock Mechanics · Drilling and Well Engineering · Rock Mechanics and Modeling

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

References (64)

Show source-provided references
1. Kim C Y, Bae G J, Hong S W, et al. Neural network based prediction of ground surface settlements due to tunnelling. Comput Geotechnics, 2001, 28: 517–54710.1016/S0266-352X(01)00011-8 ↗
2. Shahin M A, Maier H R, Jaksa M B. Investigation into the robustness of artificial neural networks for a case study in civil engineering. In: International Congress on Modelling and Simulation. Melbourne, 2005
3. Suwansawat S, Einstein H H. Artificial neural networks for predicting the maximum surface settlement caused by EPB shield tunneling. Tunnell Undergr Sp Technol, 2006, 21: 133–15010.1016/j.tust.2005.06.007 ↗
4. Chen R P, Zhang P, Kang X, et al. Prediction of maximum surface settlement caused by earth pressure balance (EPB) shield tunneling with ANN methods. Soils Found, 2019, 59: 284–29510.1016/j.sandf.2018.11.005 ↗
5. Mahdevari S, Torabi S R. Prediction of tunnel convergence using artificial neural networks. Tunnell Undergr Sp Technol, 2012, 28: 218–22810.1016/j.tust.2011.11.002 ↗
6. Kohestani V R, Bazargan-Lari M R, Asgari-Marnani J. Prediction of maximum surface settlement caused by earth pressure balance shield tunneling using random forest. JAIDM, 2017, 5: 127–135
7. Mahdevari S, Torabi S R, Monjezi M. Application of artificial intelligence algorithms in predicting tunnel convergence to avoid TBM jamming phenomenon. Int J Rock Mech Min Sci, 2012, 55: 33–4410.1016/j.ijrmms.2012.06.005 ↗
8. Salimi A, Rostami J, Moormann C. Evaluating the suitability of existing rock mass classification systems for TBM performance prediction by using a regression tree. Procedia Eng, 2017, 191: 299–30910.1016/j.proeng.2017.05.185 ↗
9. Zhang Q, Liu Z, Tan J. Prediction of geological conditions for a tunnel boring machine using big operational data. Automat Constr, 2019, 100: 73–8310.1016/j.autcon.2018.12.022 ↗
10. Zhao J, Shi M, Hu G, et al. A data-driven framework for tunnel geological-type prediction based on TBM operating data. IEEE Access, 2019, 7: 66703–6671310.1109/ACCESS.2019.2917756 ↗
11. Hou S, Liu Y, Yang Q. Real-time prediction of rock mass classification based on TBM operation big data and stacking technique of ensemble learning. J Rock Mech Geotech Eng, 2021, 14: 123–14310.1016/j.jrmge.2021.05.004 ↗
12. Liu Q, Wang X, Huang X, et al. Prediction model of rock mass class using classification and regression tree integrated AdaBoost algorithm based on TBM driving data. Tunnell Undergr Sp Technol, 2020, 106: 10359510.1016/j.tust.2020.103595 ↗
13. Rostami J. Design optimization, performance prediction, and the economic analysis of TBM application for the construction of proposed Yucca Mountain nuclear waste repository. Dissertation of Doctoral Degree. Golden: Colorado School of Mines, 1991
14. Huo J, Sun W, Chen J, et al. Optimal disc cutters plane layout design of the full-face rock tunnel boring machine (TBM) based on a multi-objective genetic algorithm. J Mech Sci Technol, 2010, 24: 521–52810.1007/s12206-009-1220-8 ↗
15. Xu G, Chen J, Zhou H. A tool breakage monitoring method for end milling based on the indirect electric data of CNC system. Int J Adv Manuf Technol, 2019, 101: 419–43410.1007/s00170-018-2735-x ↗
16. Gao B, Wang R R, Lin C, et al. TBM penetration rate prediction based on the long short-term memory neural network. Underground Space, 2020, 6: 718–73110.1016/j.undsp.2020.01.003 ↗
17. The National Standards Compilation Group of People’s Republic of China. Code for Engineering Geological Investigation of Water Resources and Hydropower (in Chinese). GB50487–2008. Beijing: China Planning Press, 2009. 262
18. Zhu M, Zhu H, Wang X, et al. Study on CART-based ensemble learning algorithms for predicting TBM tunneling parameters and classing surrounding rockmasses (in Chinese). Chin J Rock Mech Eng, 2020, 39: 1860–1871
19. Hou S K, Liu Y R, Li C Y, et al. Dynamic prediction of rock mass classification in the tunnel construction process based on random forest algorithm and TBM in situ operation parameters. IOP Conf Ser-Earth Environ Sci, 2020, 570: 05205610.1088/1755-1315/570/5/052056 ↗
20. Guo D, Li J, Jiang S H, et al. Intelligent assistant driving method for tunnel boring machine based on big data. Acta Geotech, 2022, 17: 1019–103010.1007/s11440-021-01327-1 ↗
21. Tan C, Sun F, Kong T, et al. A survey on deep transfer learning. In: Kůrková V, Manolopoulos Y, Hammer B, et al. (eds). Artificial Neural Networks and Machine Learning — ICANN 2018. ICANN 2018. Lecture Notes in Computer Science, Vol. 11141. Cham: Springer, 2018
22. Lu J, Behbood V, Hao P, et al. Transfer learning using computational intelligence: A survey. Knowledge-Based Syst, 2015, 80: 14–2310.1016/j.knosys.2015.01.010 ↗
23. Lin Q, Ci T, Wang L, et al. Transfer learning for improving seismic building damage assessment. Remote Sens, 2022, 14: 20110.3390/rs14010201 ↗
24. Wang H, Wang L, Zhang L. Transfer learning improves landslide susceptibility assessment. Gondwana Res, 2022, doi: https://doi.org/10.1016/j.gr.2022.07.00810.1016/j.gr.2022.07.008 ↗
25. Chen Z, Zhang Y, Li J, et al. Diagnosing tunnel collapse sections based on TBM tunneling big data and deep learning: A case study on the Yinsong Project, China. Tunnell Undergr Sp Technol, 2021, 108: 10370010.1016/j.tust.2020.103700 ↗
26. Zhu M, Gutierrez M, Zhu H, et al. Performance Evaluation Indicator (PEI): A new paradigm to evaluate the competence of machine learning classifiers in predicting rockmass conditions. Adv Eng Inf, 2021, 47: 10123210.1016/j.aei.2020.101232 ↗
27. Wang S, Wang Y, Li X, et al. Big data-based boring indexes and their application during TBM tunneling. Adv Civil Eng, 2021, 4: 262193110.1155/2021/2621931 ↗
28. Guo D, Li J, Li X, et al. Advance prediction of collapse for TBM tunneling using deep learning method. Eng Geol, 2022, 299: 10655610.1016/j.enggeo.2022.106556 ↗
29. Wang X, Zhu H, Zhu M, et al. An integrated parameter prediction framework for intelligent TBM excavation in hard rock. Tunnell Undergr Sp Technol, 2021, 118: 10419610.1016/j.tust.2021.104196 ↗
30. Liu Z, Li L, Fang X, et al. Hard-rock tunnel lithology prediction with TBM construction big data using a global-attention-mechanism-based LSTM network. Automat Constr, 2021, 125: 10364710.1016/j.autcon.2021.103647 ↗
31. Li J, Li P, Guo D, et al. Advanced prediction of tunnel boring machine performance based on big data. Geosci Front, 2021, 12: 331–33810.1016/j.gsf.2020.02.011 ↗
32. Xiao H H, Yang W K, Hu J, et al. Significance and methodology: Preprocessing the big data for machine learning on TBM performance. Underground Space, 2022, 7: 680–70110.1016/j.undsp.2021.12.003 ↗
33. Jing L, Li J, Yang C, et al. A case study of TBM performance prediction using field tunnelling tests in limestone strata. Tunnell Undergr Sp Technol, 2019, 83: 364–37210.1016/j.tust.2018.10.001 ↗
34. Feng S, Chen Z, Luo H, et al. Tunnel boring machines (TBM) performance prediction: A case study using big data and deep learning. Tunnell Undergr Sp Technol, 2021, 110: 10363610.1016/j.tust.2020.103636 ↗
35. Zhang L, Zhang Q, Zhou S, et al. Modeling of tunneling total loads based on symbolic regression algorithm. Appl Sci, 2021, 11: 567110.3390/app11125671 ↗
36. Mao Y, Gong G, Zhou X, et al. Identification of TBM surrounding rock based on Markov process and deep neural network (in Chinese). J Zhejiang Univer (Eng Sci), 2021, 55: 448–454, 547
37. Wang C. Research of the relationship of rock type and machine parameters of TBM and its optimal decision method (in Chinese). Dissertation of Master’s Degree. Hangzhou: Zhejiang University, 2018
38. Barton N, Lien R, Lunde J. Engineering classification of rock masses for the design of tunnel support. Rock Mech, 1974, 6: 189–23610.1007/BF01239496 ↗
39. Bieniawski Z T. Engineering classification of jointed rock masses. Trans S African Inst Civil Engrs, 1973, 15: 335–342
40. Hoek E, Kasier P K, Bawden W F. Support of Underground Excavations in Hard Rock. Boca Raton: CRC Press, 200010.1201/b16978 ↗
41. Liu Q, Liu J, Pan Y, et al. A case study of TBM performance prediction using a Chinese rock mass classification system: Hydropower classification (HC) method. Tunnell Undergr Sp Technol, 2017, 65: 140–15410.1016/j.tust.2017.03.002 ↗
42. Klein S, Schmoll M, Avery T. TBM performance at four hard rock tunnels in California. In: Proceedings of the Rapid Excavation and Tunnelling Conference. San Francisco, 1995. 61–75
43. Barton N. TBM Tunnellingin Jointed and Faulted Rock. Rotterdam: Balkema, 2000
44. Hassanpour J, Rostami J, Khamehchiyan M, et al. TBM performance analysis in pyroclastic rocks: A case history of Karaj water conveyance tunnel. Rock Mech Rock Eng, 2010, 43: 427–44510.1007/s00603-009-0060-2 ↗
45. Hassanpour J, Rostami J, Zhao J. A new hard rock TBM performance prediction model for project planning. Tunnell Undergr Sp Technol, 2011, 26: 595–60310.1016/j.tust.2011.04.004 ↗
46. Rostami J. Dveleopment of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measure zone pressure. Golden: Colorado School of Mines, 1997
47. Gong Q M, Zhao J, Jiang Y S. In situ TBM penetration tests and rock mass boreability analysis in hard rock tunnels. Tunnell Undergr Sp Technol, 2007, 22: 303–31610.1016/j.tust.2006.07.003 ↗
48. Salimi A, Rostami J, Moormann C, et al. Examining feasibility of developing a rock mass classification for hard rock TBM application using non-linear regression, regression tree and generic programming. Geotech Geol Eng, 2018, 36: 1145–1159
49. Chen Z, Du J, Yan J, et al. Point estimation method: Validation, efficiency improvement, and application to embankment slope stability reliability analysis. Eng Geol, 2019, 263: 10523210.1016/j.enggeo.2019.105232 ↗
50. Breiman L. Random forests. Machine Learn, 2001, 45: 5–3210.1023/A:1010933404324 ↗
51. Baumann F, Li F, Ehlers A, et al. Thresholding a random forest classifier. In: Bebis G, ed. Advances in Visual Computing. ISVC 2014. Lecture Notes in Computer Science, Vol 8888. Cham: Springer, 2014. 95–10610.1007/978-3-319-14364-4_10 ↗
52. Ko B, Kim H, Nam J. Classification of potential water bodies using landsat 8 OLI and a combination of two boosted random forest classifiers. Sensors, 2015, 15: 13763–1377710.3390/s150613763 ↗
53. Cortes C, Vapnik V. Support-vector networks. Mach Learn, 1995, 20: 273–29710.1007/BF00994018 ↗
54. Chen Q, Wei W, Di M, et al. Class-imbalance credit scoring using Ext-GBDT ensemble (in Chinese). Appl Res Comput, 2018, 35: 421–427
55. Liu J, Ding Y, Tao L. Classification of flight delay based-on GBDT (in Chinese). Mathemat Pract Theor, 2018, 48: 1–7
56. Gasca E, Sánchez J S, Alonso R. Eliminating redundancy and irrelevance using a new MLP-based feature selection method. Pattern Recogn, 2006, 39: 313–31510.1016/j.patcog.2005.09.002 ↗
57. Rodriguez J D, Perez A, Lozano J A. Sensitivity analysis of k-fold cross validation in prediction error estimation. IEEE Trans Pattern Anal Mach Intell, 2010, 32: 569–57510.1109/TPAMI.2009.187 ↗
58. Liu B, Wang R, Zhao G, et al. Prediction of rock mass parameters in the TBM tunnel based on BP neural network integrated simulated annealing algorithm. Tunnell Undergr Sp Technol, 2020, 95: 10310310.1016/j.tust.2019.103103 ↗
59. Goutte C, Gaussier E. A probabilistic interpretation of precision, recall and F-score, with implication for evaluation. In: Losada D E, Fernández-Luna J M, eds. Advances in Information Retrieval. ECIR 2005. Lecture Notes in Computer Science. Vol 3408. Berlin, Heidelberg: Springer, 2005
60. Fawcett T. An introduction to ROC analysis. Pattern Recogn Lett, 2006, 27: 861–87410.1016/j.patrec.2005.10.010 ↗
61. Wang Z, Chang Y C I. Marker selection via maximizing the partial area under the ROC curve of linear risk scores. Biostatistics, 2011, 12: 369–38510.1093/biostatistics/kxq052 ↗
62. Agarwal S. Surrogate regret bounds for the area under the ROC curve via strongly proper losses. J Mach Learn Res, 30: 338–353
63. Hastie T, Rosset S, Zhu J, et al. Multi-class adaboost. Stat Its Interface, 2009, 2: 349–36010.4310/SII.2009.v2.n3.a8 ↗
64. Zhang X, Li X, Feng Y, et al. The use of ROC and AUC in the validation of objective image fusion evaluation metrics. Signal Process, 2015, 115: 38–4810.1016/j.sigpro.2015.03.007 ↗