Towards an optimization design of seepage control: A case study in dam engineering

Xing Li, YiFeng Chen, Ran Hu, ZhiBing Yang

Publisher page

Abstract

High dams generally suffer from higher seepage risks in their foundations, and seepage control is an important technology for limiting the amount of leakage and improving the stability of the foundations. In this study, a procedure was proposed for optimization design of seepage control system in large-scale hydropower projects, which relies on sufficient characterization of site conditions and proper quantification of the performance of the seepage control system. The proposed procedure was applied to the design of seepage control system in the Mengdigou Hydropower Station consisting of a double-curvature arch dam 201 m in height. An optimized layout of the seepage control system, including the extended length of grout curtain, the rows of grouting holes and the spacing of drainage holes, was suggested. The proposed procedure provides a guide with lower risk and higher confidence for performance assessment and optimization design of seepage control systems in high dam engineering.
Source: openaire · Quality: candidate unverified · Source record ↗

Research context

OpenAlex topics: Dam Engineering and Safety · Groundwater flow and contamination studies · Geotechnical Engineering and Analysis

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

References (30)

Show source-provided references
1. Feng J, Wei H, Pan J, et al. Comparative study procedure for the safety evaluation of high arch dams. Comp Geotechnics, 2011, 38: 306–31710.1016/j.compgeo.2010.10.008 ↗
2. Lin P, Zhou W, Liu H. Experimental study on cracking, reinforcement, and overall stability of the Xiaowan Super-High Arch Dam. Rock Mech Rock Eng, 2015, 48: 819–84110.1007/s00603-014-0593-x ↗
3. Wang W M, Ding J X, Wang G J, et al. Stability analysis of the temperature cracks in Xiaowan arch dam. Sci China Technol Sci, 2011, 54: 547–55510.1007/s11431-010-4280-1 ↗
4. Liu Y R, Guan F H, Yang Q, et al. Geomechanical model test for stability analysis of high arch dam based on small blocks masonry technique. Int J Rock Mech Min Sci, 2013, 61: 231–24310.1016/j.ijrmms.2013.03.003 ↗
5. Fan Q, Zhou S, Yang N. Optimization design of foundation excavation for Xiluodu super-high arch dam in China. J Rock Mech Geotech Eng, 2015, 7: 120–13510.1016/j.jrmge.2015.03.001 ↗
6. Chen Y F, Zheng H K, Wang M, et al. Excavation-induced relaxation effects and hydraulic conductivity variations in the surrounding rocks of a large-scale underground powerhouse cavern system. Tunnel Underground Space Tech, 2015, 49: 253–26710.1016/j.tust.2015.05.007 ↗
7. Chen Y F, Hong J M, Zheng H K, et al. Evaluation of groundwater leakage into a drainage tunnel in Jinping-I Arch Dam Foundation in Southwestern China: A case study. Rock Mech Rock Eng, 2016, 49: 961–97910.1007/s00603-015-0786-y ↗
8. Jiang Q, Feng X, Hatzor Y H, et al. Mechanical anisotropy of columnar jointed basalts: An example from the Baihetan hydropower station, China. Eng Geol, 2014, 175: 35–4510.1016/j.enggeo.2014.03.019 ↗
9. Song Z, Liu Y, Yang Q. Experimental and numerical investigation on the stability of a high arch dam with typical problems of nonsymmetry: Baihetan Dam, China. Bull Eng Geol Environ, 2016, 75: 1555–157010.1007/s10064-015-0819-5 ↗
10. Zhou C B, Liu W, Chen Y F, et al. Inverse modeling of leakage through a rockfill dam foundation during its construction stage using transient flow model, neural network and genetic algorithm. Eng Geol, 2015, 187: 183–19510.1016/j.enggeo.2015.01.008 ↗
11. Jiang Q, Feng X T, Xiang T B, et al. Rockburst characteristics and numerical simulation based on a new energy index: A case study of a tunnel at 2500 m depth. Bull Eng Geol Environ, 2010, 69: 381–38810.1007/s10064-010-0275-1 ↗
12. Ma T H, Tang C A, Tang L X, et al. Rockburst characteristics and microseismic monitoring of deep-buried tunnels for Jinping II Hydropower Station. Tunnelling Underground Space Tech, 2015, 49: 345–36810.1016/j.tust.2015.04.016 ↗
13. Chai J R, Xu W S. Coupling analysis of unsteady seepage and stress fields in discrete fractures network of rock mass in dam foundation. Sci China Technol Sci, 2011, 54: 133–13910.1007/s11431-011-4630-7 ↗
14. Wang M, Chen Y F, Hu R, et al. Coupled hydro-mechanical analysis of a dam foundation with thick fluvial deposits: A case study of the Danba Hydropower Project, Southwestern China. Eur J Environ Civil Eng, 2016, 20: 19–4410.1080/19648189.2015.1013639 ↗
15. Chen Y, Hu R, Zhou C B, et al. A new classification of seepage control mechanisms in geotechnical engineering. J Rock Mech Geotech Eng, 2010, 2: 209–22210.3724/SP.J.1235.2010.00209 ↗
16. Li L Z, Xiao M. Study on implicit composite element method for seepage analysis in underground engineering. Sci China Technol Sci, 2015, 58: 1617–162610.1007/s11431-015-5888-y ↗
17. Li Y, Chen Y F, Zhang G J, et al. A numerical procedure for modeling the seepage field of water-sealed underground oil and gas storage caverns. Tunnel Underground Space Tech, 2017, 66: 56–6310.1016/j.tust.2017.04.002 ↗
18. Unal B, Eren M, Yalcin M G. Investigation of leakage at Ataturk dam and hydroelectric power plant by means of hydrometric measurements. Eng Geol, 2007, 93: 45–6310.1016/j.enggeo.2007.02.006 ↗
19. Chen Y F, Hong J M, Tang S L, et al. Characterization of transient groundwater flow through a high arch dam foundation during reservoir impounding. J Rock Mech Geotechnical Eng, 2016, 8: 462–47110.1016/j.jrmge.2016.03.004 ↗
20. Ren J, Shen Z Z, Wang Y, et al. Optimization of seepage control scheme for the right bank of Hadashan water project (in Chinese). Water Power, 2010, 36: 28–30, 89
21. Shen Z Z, Zhang X, Lu X, et al. Seepage control optimization of left bank of Laohuzui hydropower station (in Chinese). J Hydraul Eng, 2006, 37: 1230–1234
22. Peng H, Chen S F, Chen S H. Analysis on unsaturated seepage and optimization of seepage control for Dayantang landslide in Shuibuya project (in Chinese). Chin J Rock Mech Eng, 2002, 21: 1027–1033
23. Li Y, Chen Y F, Jiang Q H, et al. Performance assessment and optimization of seepage control system: A numerical case study for Kala underground powerhouse. Comp Geotech, 2014, 55: 306–31510.1016/j.compgeo.2013.09.013 ↗
24. Chen Y F, Zhou C B, Zheng H. A numerical solution to seepage problems with complex drainage systems. Comp Geotechnics, 2008, 35: 383–39310.1016/j.compgeo.2007.08.005 ↗
25. Chen Y F, Hu R, Zhou C B, et al. A new parabolic variational inequality formulation of Signorini’s condition for non-steady seepage problems with complex seepage control systems. Int J Numer Anal Meth Geomech, 2011, 35: 1034–105810.1002/nag.944 ↗
26. Wang L, Liu Z, Zhang Y T. Analysis of seepage field near a drainageholes curtain (in Chinese). J Hydraul Eng, 1992, 4: 15–20
27. Zhu Y M, Zhang L J. Solution to seepage field problem with the technique of improved drainage substructure (in Chinese). Chin J Geotech Eng, 1997, 19: 69–76
28. Li P, Lu W X, Long Y Q, et al. Seepage analysis in a fractured rock mass: The upper reservoir of Pushihe pumped-storage power station in China. Eng Geol, 2008, 97: 53–6210.1016/j.enggeo.2007.12.005 ↗
29. Rong G, Zhou C B, Wang E Z. Preliminary study on permeability tensor calculation of fractured rock mass and its representative elementary volume (in Chinese). Chin J Rock Mech Eng, 2007, 26: 740–746
30. Zheng H, Liu D F, Lee C F, et al. A new formulation of Signorini’s type for seepage problems with free surfaces. Int J Numer Meth Engng, 2005, 64: 1–1610.1002/nme.1345 ↗