Human resource allocation for multiple scientific research projects via improved pigeon-inspired optimization algorithm
Source abstract
Abstract
Aiming at the complex and restrictive characteristics of human resource allocation in multiple scientific university research projects, an improved pigeon-inspired optimization (IPIO) algorithm is proposed wherein loss minimization and the shortest project delay time are considered as optimization goals. Firstly, mathematical modelling of the problem is carried out, and the multi-objective optimization problem is transformed into a single-objective optimization problem by means of a weighted solution. In the second step, the traditional pigeon-inspired optimization (PIO) algorithm is discretized, and an adaptive parameter strategy is adopted to improve the shortcomings of the algorithm itself. Finally, by comparing the simulation results with the original algorithm and the genetic algorithm in the optimization of human resource allocation in multiple projects, the feasibility and superiority of the proposed algorithm in the optimization of human resource allocation in multi-scientific research projects is verified.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: Resource-Constrained Project Scheduling · Scheduling and Timetabling Solutions · Construction Project Management and Performance
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (33)
Show source-provided references
1. Shi Q, Zhou Y, Xiao C, et al. Delivery risk analysis within the context of program management using fuzzy logic and DEA: A China case study. Int J Project Manage, 2014, 32: 341–34910.1016/j.ijproman.2013.05.002 ↗
2. Elonen S, Artto K A. Problems in managing internal development projects in multi-project environments. Int J Project Manage, 2003, 21: 395–40210.1016/S0263-7863(02)00097-2 ↗
3. Beşikci U, Bilge Ü, Ulusoy G. Resource dedication problem in a multi-project environment. Flex Serv Manuf J, 2013, 25: 206–22910.1007/s10696-012-9140-9 ↗
4. Buuren A, Buijs J M, Teisman G. Program management and the creative art of coopetition: Dealing with potential tensions and synergies between spatial development projects. Int J Project Manage, 2010, 28: 672–68210.1016/j.ijproman.2009.12.002 ↗
5. Jack-Ide I O, Uys L R, Middleton L E. Mental health care policy environment in Rivers State: Experiences of mental health nurses providing mental health care services in neuro-psychiatric hospital, Port Harcourt, Nigeria. Int J Ment Health Syst, 2013, 7: 1–910.1186/1752-4458-7-1 ↗
6. Lewis C C, George J F. Cross-cultural deception in social networking sites and face-to-face communication. Comput Human Behav, 2008, 24: 2945–296410.1016/j.chb.2008.05.002 ↗
7. Bovaird T, Löffler E. Moving from excellence models of local service delivery to benchmarking ‘good local governance’. Int Rev Admin Sci, 2002, 68: 9–2410.1177/0020852302681001 ↗
8. Howell-Moroney M. The Tiebout hypothesis 50 years later: Lessons and lingering challenges for metropolitan governance in the 21st century. Public Admin Rev, 2008, 68: 97–10910.1111/j.1540-6210.2007.00840.x ↗
9. Osiche M. Applying rapid results approach to local service delivery: Issues, lessons and challenges from Nairobi City Council. Public Admin Dev, 2008, 28: 311–32510.1002/pad.507 ↗
10. Engwall M, Jerbrant A. The resource allocation syndrome: The prime challenge of multi-project management? Int J Project Manage, 2003, 21: 403–40910.1016/S0263-7863(02)00113-8 ↗
11. Steyn H. Project management applications of the theory of constraints beyond critical chain scheduling. Int J Project Manage, 2002, 20: 75–8010.1016/S0263-7863(00)00054-5 ↗
12. Hendriks M, Voeten B, Kroep L. Human resource allocation in a multi-project R&D environment. Int J Project Manage, 1999, 17: 181–18810.1016/S0263-7863(98)00026-X ↗
13. Grundy T. Strategic project management and strategic behaviour. Int J Project Manage, 2000, 18: 93–10310.1016/S0263-7863(98)00076-3 ↗
14. Chen J, Yun C, Wang Z. Multi-dimensional model method for the human resource allocation in multi-project. In: 2009 International Conference on Information Management, Innovation Management and Industrial Engineering. Xi’an, 2009. 364–36610.1109/ICIII.2009.547 ↗
15. Weng, W., Su, J., Chen, G., et al. An approach for allocation optimization of multi-project human resource based on DEA. In: 2010 International Conference on Management and Service Science. Wuhan, 2010. 1–410.1109/ICMSS.2010.5578143 ↗
16. Chien T H, Lin Y I, Tien K W. Agent-based negotiation mechanism for multi-project human resource allocation. J Ind Prod Eng, 2013, 30: 518–527
17. Chen J J, Wang S T, Chen C. Method research for dynamic multiproject human resource allocation based on multidimensional model. In: 2011 International Conference on Information Management, Innovation Management and Industrial Engineering. Shenzhen, 2011. 78–81
18. Xu Z, Gao Y. Characteristic analysis and prevention on premature convergence in genetic algorithms. Sci China Ser E-Tech Sci, 1997, 40: 113–12510.1007/BF02916943 ↗
19. Venter G, Sobieszczanski-Sobieski J. Particle swarm optimization. AIAA J, 2003, 41: 1583–158910.2514/2.2111 ↗
20. Yang Q, Chen W N, Yu Z, et al. Adaptive multimodal continuous ant colony optimization. IEEE Trans Evol Computat, 2016, 21: 191–20510.1109/TEVC.2016.2591064 ↗
21. Debels D, Vanhoucke M. A decomposition-based genetic algorithm for the resource-constrained project-scheduling problem. Operat Res, 2007, 55: 457–46910.1287/opre.1060.0358 ↗
22. Tchomté S K, Gourgand M. Particle swarm optimization: A study of particle displacement for solving continuous and combinatorial optimization problems. Int J Prod Econ, 2009, 121: 57–6710.1016/j.ijpe.2008.03.015 ↗
23. Deng L, Lin V, Chen M. Hybrid ant colony optimization for the resource-constrained project scheduling problem. J Syst Eng Electron, 2010, 21: 67–7110.3969/j.issn.1004-4132.2010.01.012 ↗
24. Duan H, Qiao P. Pigeon-inspired optimization: A new swarm intelligence optimizer for air robot path planning. Int J Intel Comp Cyber, 2014, 7: 24–3710.1108/IJICC-02-2014-0005 ↗
25. Duan H B, Qiu H X, Fan Y M. Unmanned aerial vehicle close formation cooperative control based on predatory escaping pigeon-inspired optimization (in Chinese). Sci Sin Tech, 2015, 45: 559–57210.1360/N092015-00125 ↗
26. Zhang S, Duan H. Gaussian pigeon-inspired optimization approach to orbital spacecraft formation reconfiguration. Chin J Aeronaut, 2015, 28: 200–20510.1016/j.cja.2014.12.008 ↗
27. Li C, Duan H. Target detection approach for UAVs via improved pigeon-inspired optimization and edge potential function. Aerosp Sci Tech, 2014, 39: 352–36010.1016/j.ast.2014.10.007 ↗
28. Brucker P, Drexl A, Möhring R, et al. Resource-constrained project scheduling: Notation, classification, models, and methods. Eur J Operat Res, 1999, 112: 3–4110.1016/S0377-2217(98)00204-5 ↗
29. Chang C K, Christensen M J, Zhang T. Genetic algorithms for project management. Ann Software Eng, 2001, 11: 107–13910.1023/A:1012543203763 ↗
30. Qiu H X, Duan H B. Multi-objective pigeon-inspired optimization for brushless direct current motor parameter design. Sci China Tech Sci, 2015, 58: 1915–192310.1007/s11431-015-5860-x ↗
31. Bu H J, Zhang J, Luo Y Z, et al. Multi-objective optimization of space station short-term mission planning. Sci China Tech Sci, 2015, 58: 2169–218510.1007/s11431-015-5851-y ↗
32. Chen Z, Zhou L Y, Sun Y, et al. Multi-objective parameter optimization for a single-shaft series-parallel plug-in hybrid electric bus using genetic algorithm. Sci China Tech Sci, 2016, 59: 1176–118510.1007/s11431-016-6094-2 ↗
33. Zhang T, Hu T, Zheng Y, et al. An improved particle swarm optimization for solving bilevel multiobjective programming problem. J Appl Math, 2012, 2012: 1–13