Status of J-PARC project
Source abstract
Abstract
The Japan Proton Accelerator Research Complex (J-PARC) has progressed extensively in the last few years. Successful commissioning of the first stage accelerator linac started on November of 2006, in October of 2007; the 3 GeV synchrotron also successfully accelerated protons up to 3 GeV with 5 kW beam power by a single shot. Following these successes, the first neutron beam was observed from the spallation neutron source at Material and Life Science Facility on May of 2008.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: Nuclear Physics and Applications · Particle accelerators and beam dynamics · Particle Accelerators and Free-Electron Lasers
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (5)
Show source-provided references
1. JAERI and KEK Joint Project Team, .
2. The Joint Project Team, JAERI-Tech 2000-003/KEK Report 99-5 (2000); see also JAERI-Tech 056/KEK Report 99-4, 1999 (in Japanese).
3. High-Intensity Proton Accelerator Project Team, J-PARC, JAERI-Tech 2003-044/KEK Report 2002-13, 2003.
4. High-Intensity Proton Accelerator Project Team, JAERI-Tech 2004-001, 2003 (in Japanese).
5. Oyama · Nucl. Instrum. Methods · 2006 · A562 · 54810.1016/j.nima.2006.02.139 ↗