Optimal Designs of EWMA Charts for Monitoring the Coefficient of Variation Based on Median Run Length and Expected Median Run Length
Source abstract
Abstract
Abstract The shape of run-length distribution changes with process shifts. This leads to complexity in interpreting the average run length performance. In this article, we show that the percentiles of the run-length distribution, especially the median run length (MRL), are more intuitive. The 5th and 95th percentiles of the run-length distribution are also provided in order to investigate the variation and spread of the run length. We develop two new optimal-design procedures for the exponentially weighted moving average (EWMA) charts, for monitoring the coefficient-of-variation (CV) squared (EWMA-γ2). These include minimization of the out-of-control MRL and the out-of-control expected MRL for deterministic and unknown shift sizes, respectively. Both the zero and steady states are discussed in this article. The optimal EWMA-γ2 chart is illustrated with real industrial data obtained from a metal sintering process. A comparative study reveals the superiority of the EWMA-γ2 charts for certain ranges of shifts in the CV.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Advanced Statistical Process Monitoring · Optimal Experimental Design Methods · Scientific Measurement and Uncertainty Evaluation
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
School of Mathematical and Computer Sciences, Heriot-Watt University Malaysia 1 , Putrajaya 62200 ,
Department of Physical and Mathematical Science 2 , Universiti Tunku Abdul Rahman, Kampar, Perak 31900 ,
School of Mathematical Sciences, Universiti Sains Malaysia 3 , Penang 11800 ,
Department of Operations and Management Information Systems, Universiti Malaya 4 , Kuala Lumpur 50603 ,
References (34)
Show source-provided references
1. 1931 · 516
2. Monitoring Process Mean and Variability with One Non-central Chi-square Chart10.1080/0266476042000285503 ↗
3. Group Runs Double Sampling np Control Chart for Attributes10.1520/JTE20160226 ↗
4. Exponentially Weighted Moving Average Control Schemes: Properties and Enhancements10.1080/00401706.1990.10484583 ↗
5. Joint Economic Design of x and R Charts under Weibull Shock Models10.1080/00207540050117341 ↗
6. Variable Limits and Control Charts Based on the Half Normal Distribution10.1520/JTE20140429 ↗
7. Significance Tests and Confidence Intervals for Coefficients of Variation10.1016/0167-9473(96)83707-8 ↗
8. Inferences on the Common Coefficient of Variation10.1002/sim.2088 ↗
9. The Coefficient of Variation Asymptotic Distribution in the Case of Non-iid Random Variables10.1080/02664760802382491 ↗
10. Monitoring the Coefficient of Variation Using EWMA Charts10.1080/00224065.2011.11917861 ↗
11. On Symmetrizing Transformation of the Sample Coefficient of Variation from a Normal Population10.1080/03610918.2012.687065 ↗
12. A Control Chart for the Coefficient of Variation10.1080/00224065.2007.11917682 ↗
13. Development of CV Control Chart Using EWMA Technique
14. A Synthetic Control Chart for the Coefficient of Variation10.1080/00949655.2011.639772 ↗
15. Monitoring the Coefficient of Variation Using a Variable Sample Size Control Chart10.1007/s00170-015-6985-6 ↗
16. Monitoring the Coefficient of Variation Using Control Charts with Run Rules10.1080/16843703.2013.11673309 ↗
17. Monitoring the Coefficient of Variation Using a Variable Sampling Interval Control Chart10.1002/qre.1465 ↗
18. Run-Sum Control Charts for Monitoring the Coefficient of Variation10.1016/j.ejor.2016.08.067 ↗
19. The Exact Run Length Distribution and Design of the Shewhart X¯ Chart with Estimated Parameters Based on Median Run Length10.1080/03610918.2014.889158 ↗
20. Some Current Directions in the Theory and Application of Statistical Process Monitoring10.1080/00224065.2014.11917955 ↗
21. Likelihood-Based EWMA Charts for Monitoring Poisson Count Data with Time-Varying Sample Sizes10.1080/01621459.2012.682811 ↗
22. An Optimal Design of EWMA Control Charts Based on Median Run Length10.1080/00949659308811479 ↗
23. The Rate of False Signals in Ū Control Charts with Estimated Limits10.1080/00224065.2007.11917673 ↗
24. Is Average Run Length to False Alarm Always an Informative Criterion?10.1080/07474940802445790 ↗
25. Practical Design of Generalized Likelihood Ratio Control Charts for Autocorrelated Data10.1198/004017008000000280 ↗
26. An Examination of the Robustness to Non-normality of the EWMA Control Charts for the Dispersion10.1080/03610910500308719 ↗
27. A Median Run Length-Based Double-Sampling X¯ Chart with Estimated Parameters for Minimizing the Average Sample Size10.1007/s00170-015-6949-x ↗
28. Run Length Distribution and Percentiles: The Shewhart X¯ Chart with Unknown Parameters10.1080/08982110701276653 ↗
29. Adaptive Sampling Enhancements for Shewhart Control Charts10.1080/07408179308964289 ↗
30. An Almost Unbiased Estimator of the Coefficient of Variation10.1016/S0165-1765(00)00351-7 ↗
31. On Quasi-Stationary Distribution in Absorbing Discrete Time Finite Markov Chains10.2307/3211876 ↗
32. A Comparison Study of Effectiveness and Robustness of Control Charts for Monitoring Process Mean10.1016/j.ijpe.2011.08.026 ↗
33. Optimization Design of Control Charts Based on Taguchi’s Loss Function and Random Process Shift10.1081/00207540310001614169 ↗
34. Optimization Designs of the Combined Shewhart-CUSUM Control Charts10.1016/j.csda.2008.08.032 ↗