An Effective Procedure for Calculating Weibull Production Yield with Mean Shift

Ya-Chen Hsu, W. L. Pearn, Yuan-Yi Li

Journal of Testing and Evaluation· Volume 40· Issue 3
Publisher page

Abstract

Abstract Motorola, Inc. introduced its six sigma production quality initiative to the world in the 1980 s. Six sigma production quality is estimated by assuming a 1.5σ shift to the process mean. Bothe provided a statistical reason for considering such a shift in the normal process mean, and he also provided a much more accurate capability calculation to measure the production yield (Bothe, D. R., “Statistical Reason for the 1.5σ Shift,” Qual. Eng., Vol. 14(3), 2002, pp. 479–487). In this paper, we consider Weibull processes, which cover a wide class of non-normal processes. We calculate the mean shift adjustments under various sample sizes n and Weibull parameters, with the power fixed at 0.5. Then, we implement the derived results to develop an effective procedure to accurately calculate the production yield. Finally, to demonstrate the applicability of the proposed approach, the proposed procedure is applied to a real manufacturing process with mean shift.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Advanced Statistical Process Monitoring · Optimal Experimental Design Methods · Scientific Measurement and Uncertainty Evaluation

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Dept. of Business Administration, Yuanpei Univ. 1 , Hsinchu30015, TW

Dept. of Industrial Engineering and Management, National Chiao Tung Univ. 2 , Hsinchu30015, TW

References (16)

Show source-provided references
1. Process Capability Indices10.1080/00224065.1986.11978984 ↗
2. A New Measure of Process Capabilitypm10.1080/00224065.1988.11979102 ↗
3. Distributional and Inferential Properties of Process Capability Indices10.1080/00224065.1992.11979403 ↗
4. An Overview of Theory and Practice on Process Capability Indices for Quality Assurance10.1016/j.ijpe.2008.11.008 ↗
5. Statistical Reason for the 1.5σ Shift10.1081/QEN-120001884 ↗
6. Evaluation of Non-normal Process Capability Indices using Generalized Lambda Distribution10.1081/QEN-200028709 ↗
7. A Method of Estimating the Process Capability Index from the First Four Moments of Non-normal Data10.1002/qre.610 ↗
8. Kotz · 1998
9. Process Capability Indices and Non-normal Distributions10.1080/08982119608919047 ↗
10. Process Capability Index under Non-normality
11. Process capability analysis using personal computers10.1080/08982119208918923 ↗
12. Estimation of Capability Index Based on Bootstrap Method10.1016/0026-2714(95)00211-1 ↗
13. Lifetimes of Polypropylene Films under Combined High Electric Field and Thermal Stresses10.1109/14.34196 ↗
14. Capability Adjustment for Gamma Processes with Mean Shift Consideration in Implementing Six Sigma Program10.1016/j.ejor.2007.07.023 ↗
15. Lu · 2003
16. An Application of Non-normal Process Capability Indices10.1002/(SICI)1099-1638(199711/12)13:6<355::AID-QRE125>3.0.CO;2-V ↗