The Material Dispatching Method for Conveyor System in 450 mm Wafer Fabrication
Source abstract
Abstract
Abstract The transition to 450 mm wafer manufacturing has already become a development trend for the semiconductor industry. To handle the larger wafer size, the conveyor-based automated material handling system (AMHS) is considered as the next-generation transportation. However, there is not any effective method for handling prioritized lots for 450 mm conveyor-based AMHS. This study developed an effective dispatching method named the “conveyor preemptive dispatching” (CPD) method for conveyor-based AMHS to minimize the average variable time of hot lots with the minimum impact to the transport of normal lots. Experiment results revealed that the CPD demonstrates better performance than the existing method. The CPD method reduced the average variable time by 59 % (from 14.572 to 5.904 s) for hot lots and 31 % (from 3962.394 to 2741.889 s) for normal lots. It expedites the movement of lots and significantly reduces lot average variable time and will effectively enhance the throughput of lots transportation.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Advanced Manufacturing and Logistics Optimization · Belt Conveyor Systems Engineering · Assembly Line Balancing Optimization
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
National Kaohsiung Univ. of Applied Sciences 1 , 415 Chien-Kung Rd. Kaohsiung80778, TW 807
National Kaohsiung Univ. of Applied Sciences 2 , 415 Chien-Kung Rd., Kaohsiung80778, TW 807
Chihlee Univ. of Technology 3 , 313, Sec. 1, Wunhua Rd. , Banciao District, New Taipei City22050, TW
Foxconn Electronics Inc. 4 , 5 Quoc Tu Giam, Hanoi115601, Vietnam
National Chengchi Univ. 5 , 64, Sec. 2, Zhinan Rd. , Wenshan District, Taipei City11605, TW
References (25)
Show source-provided references
1. Fifty Years of Moore’s Law10.1109/TSM.2010.2096437 ↗
2. ITRS, 2016, “ITRS Introduction,” www.itrs.net (Last accessed 15 Oct 2014)
3. SEMATECH, 2016, “SEMATECH Introduction,” public.sematech.org (Last accessed 15 Oct 2014)
4. SEMI, 2016, “SEMI Introduction,” www.semi.org (Last accessed 16 Nov 2014)
5. ITRS, 2014, “2013 Executive Summary,” http://www.itrs.net/ITRS%201999-2014%20Mtgs,%20Presentations%20&%20Links/2013ITRS/2013Chapters/2013ExecutiveSummary.pdf (Last accessed 16 Nov 2014)
6. Technology Decisions to Minimize 450 mm Wafer Size Transition Risk10.1109/TSM.2005.858471 ↗
7. The Future of Semiconductor Manufacturing10.1109/MRA.2006.250560 ↗
8. Trade-Offs in Cycle Time Management: Hot Lots10.1109/66.136270 ↗
9. Application of TRIZ to Improve the Material Handling and Productivity in a Screw-Packaging Factory10.1520/JTE20130078 ↗
10. Factory Throughput Improvements Through Intelligent Integrated Delivery in Semiconductor Fabrication Facilities10.1109/TSM.2004.840530 ↗
11. Two-Step Simulation Method for Automatic Material Handling System of Semiconductor Fab10.1016/j.rcim.2006.05.004 ↗
12. Simulation Based Comparison of Semiconductor AMHS Alternatives: Continuous Flow vs. Overhead Monorail
13. Survey of Research in Modeling Conveyor-Based Automated Material Handling Systems in Wafer Fabs
14. Scheduling and Routing of Automated Guided Vehicles: A Hybrid Approach10.1016/j.cor.2005.07.004 ↗
15. Simulation Analysis of the Connecting Transport AMHS in a Fafer Fab10.1109/TSM.2003.815211 ↗
16. Improving Distribution Operations: Implementation of Material Handling Systems10.1016/j.ijpe.2008.12.026 ↗
17. Neural-Network-Based Delivery Time Estimates for Prioritized 300 mm Automatic Material Handling Operations10.1109/TSM.2004.831533 ↗
18. Differentiated Preemptive Dispatching for Automatic Materials Handling Services in 300 mm Semiconductor Foundry10.1007/s00170-005-2610-4 ↗
19. The Heuristic Dispatching Method of Automatic Material Handling System in 300 mm Semiconductor Fabrication
20. The Heuristic Preemptive Dispatching Method of Material Transportation System in 300 mm Semiconductor Fabrication10.1007/s10845-011-0531-7 ↗
21. Flexsim Sofware, 2014, “Simulation Software for Manufacturing, Material Handling, Healthcare, etc.,” http://www.flexsim.com/ (Last accessed 16 Oct 2014)
22. International SEMATECH, 2014, “450 mm Transition Update,” http://www.sematech.org/meetings/archives/450mm/ 11042010/ISMI2010Symposium450mmUpdate.pdf (Last accessed 16 Oct 2014)
23. Quinn, T. and Bass, E., “300 mm Factory Layout and Material Handling Modeling,” Phase I Report, International SEMATECH, Albany, NY, 1999.
24. Campbell, E. and Ammenheuser, J., “300 mm Factory Layout and Material Handling Modeling,” Phase 2 Report, International SEMATECH, Albany, NY, 2000.
25. Beaverstock · 2011