Full-Scale Experimental Research on PE Sheathing of Stay-Cable
Source abstract
Abstract
Abstract The polyethylene (PE) sheathing of a stay-cable is easily damaged during the setup process due to the incorrect clamping choices, improper rubber blankets for the clamp, or inappropriate clamping force. In this paper, a full-scale experiment was carried out to study the compressive and tensile performances of the high-density PE sheathing during clamping. The clamping force, the length of the clamp, and the type of the rubber blankets used for clamping were evaluated in full-scale tests on Su-Tong Yangtze River Bridge, which is the cable-stayed bridge of the largest span in the world. During the setup process of the stayed-cables of Su-Tong Yangtze River Bridge, neither the cable clamp sliding nor the PE sheathing crushing occurred.
Source: openalex_inverted_index · Quality: baseline
Research context
OpenAlex topics: Mechanical stress and fatigue analysis · Geotechnical Engineering and Underground Structures · Mechanical Behavior of Composites
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References
Reference metadata was not supplied for this record.