journal article·2020-12Open access

Nesting and scheduling problems for additive manufacturing: A taxonomy and review

Yosep Oh, Paul Witherell, Yan Lu, Timothy Sprock

Abstract

With the trends of Industry 4.0 spanning physical and virtual worlds, Additive Manufacturing (AM) has been the mainstream for realizing complex geometries designed in computers. Meanwhile, a considerable number of AM studies have focused on effectively building these elaborate designs. However, as the AM technologies have matured, production-driven studies have recently been spotlighted to achieve mass customization. This means that the research scope has been extended to incorporate production management concerns focused on efficiently producing high volumes of heterogeneous parts. Particularly, since AM allows batch processing of multiple parts within the same build volume, nesting methods have been studied to properly place objects in the limited space to improve yield. Since the middle of 2010, the nesting topic has been considered with a scheduling matter for assigning objects to AM machines to minimize production time and cost. The main contribution of this investigation is to show the current status of nesting and scheduling studies applied to AM. This reveals critical issues for future research directions. Since traditional manufacturing usually addresses nesting and scheduling problems separately, each problem is specified with its specialized taxonomies. This causes the existing taxonomies to be limited in comprehensively covering both nesting and scheduling topics. To provide a holistic view covering both topics, this paper proposes an alternative taxonomy based on three dimensions: Part, Build, and AM Machine. Considering combinations of the three dimensions, six classes are defined to identify and cluster problem characteristics and types. Moreover, eight supplementary criteria are added to further refine the organization of the research papers within those classes. In this survey, 53 technical papers are classified and critical issues are discussed.
Source: europepmc · Quality: candidate unverified · Source record ↗

Research context

OpenAlex topics: Additive Manufacturing and 3D Printing Technologies · Manufacturing Process and Optimization · Advanced Manufacturing and Logistics Optimization

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

References (100+)

Show source-provided references
1. “Additive manufacturing technologies: state of the art and trends,”10.1080/00207543.2015.1115909 ↗
2. “Design for additive manufacturing: trends, opportunities, considerations, and constraints,”10.1016/j.cirp.2016.05.004 ↗
3. “Economies of collaboration in build-to-model operations,”10.1002/joom.1014 ↗
4. “The FaaS system using additive manufacturing for personalized production,”10.1108/RPJ-11-2016-0195 ↗
5. “Network-based pricing for 3D printing services in two-sided manufacturing-as-a-service marketplace,”
6. “A centralized framework for system-level control and management of additive manufacturing fleets,”
7. “Ubiquitous manufacturing: current practices, challenges, and opportunities,”10.1016/j.rcim.2016.01.001 ↗
8. “Cloud manufacturing: a computing and service- oriented manufacturing model,”10.1177/0954405411405575 ↗
9. “Additive manufacturing management: a review and future research agenda,”10.1080/00207543.2016.1229064 ↗
10. “The additive manufacturing operations management maturity: a closed or an open issue?,”10.1016/j.promfg.2019.07.034 ↗
11. “Making sense of 3-D printing: creating a map of additive manufacturing products and services,”
12. Oh · 2019
13. “Methodology for integrative production planning in highly dynamic environments,”10.1007/s11740-019-00889-0 ↗
14. “Single batch processing machine scheduling with two-dimensional bin packing constraints,”10.1016/j.ijpe.2017.11.015 ↗
15. “Production scheduling and nesting in additive manufacturing,”10.1016/j.cie.2018.09.048 ↗
16. Oh
17. “MILP models to minimise makespan in additive manufacturing machine scheduling problems,”10.1016/j.cor.2019.01.006 ↗
18. “An experimental analysis of deepest bottom-left-fill packing methods for additive manufacturing,”
19. “A new method for single-layer-part nesting in additive manufacturing,”10.1108/RPJ-01-2017-0008 ↗
20. “Bounds for parallel machine scheduling with predefined parts of jobs and setup time,”10.1007/s10479-017-2615-z ↗
21. “Planning and Scheduling in Additive Manufacturing,”10.4114/intartif.vol21iss62pp40-52 ↗
22. “Improved evolutionary algorithm for parallel batch processing machine scheduling in additive manufacturing,”
23. “A 3D printing task packing algorithm based on rectangle packing in Cloud manufacturing,”
24. ISO/ASTM52900-15 · 2015
25. “Analysis of irregular three-dimensional packing problems in additive manufacturing: a new taxonomy and dataset,”
26. ISO/ASTM52921-13 · 2019
27. “Scheduling and process planning for multiple material stereolithography,”10.1108/13552541011049243 ↗
28. “Scheduling in cloud manufacturing: state-of-the-art and research challenges,”
29. “Part decomposition and 2D batch placement in single-machine additive manufacturing systems,”
30. “Evolutionary computing and genetic algorithms: paradigm applications in 3D printing process optimization,”
31. “Investigating the effect of scale and scheduling strategies on the productivity of 3D managed print services,”10.1177/0954405417708217 ↗
32. Model layout optimization for solid ground curing rapid prototyping processes,”10.1016/S0736-5845(01)00022-9 ↗
33. “Intelligent layout planning for rapid prototyping,”10.1080/00207540701277002 ↗
34. “Two-dimensional placement optimization for multi-parts production in additive manufacturing,”10.1016/j.rcim.2015.11.003 ↗
35. “Multi-objective optimization analysis for part-to-Printer assignment in a network of 3D fused deposition modeling,”10.1016/j.jmsy.2017.02.012 ↗
36. “Fuzzy approach for production planning by using a three-dimensional printing-based ubiquitous manufacturing system,”
37. “Production planning for cloud-based additive manufacturing—A computer vision-based approach,”10.1016/j.rcim.2019.03.003 ↗
38. “Automating the production planning of a 3D printing factory,”10.1109/WSC.2015.7408327 ↗
39. “A dynamic order acceptance and scheduling approach for additive manufacturing on-demand production,”
40. Cyclic robot scheduling for 3D printer-based flexible assembly systems,”
41. “Integration of process planning and scheduling: a state-of-the-art review,”10.1080/0951192X.2011.562543 ↗
42. “Customized production based on distributed 3D printing services in cloud manufacturing,”10.1007/s00170-015-7871-y ↗
43. A cloud-based platform for automated order processing in additive manufacturing10.1016/j.procir.2017.03.087 ↗
44. “A typology of cutting and packing problems,”10.1016/0377-2217(90)90350-K ↗
45. “An improved typology of cutting and packing problems,”10.1016/j.ejor.2005.12.047 ↗
46. Araujo · 2015
47. “A Review of Production Scheduling,”10.1287/opre.29.4.646 ↗
48. “Scheduling with inserted idle time: problem taxonomy and literature review,”10.1287/opre.48.1.99.12447 ↗
49. A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problems,”10.1016/j.ejor.2013.09.017 ↗
50. “Scheduling with batching: a review,”10.1016/S0377-2217(99)00153-8 ↗
51. “Order acceptance and scheduling: a taxonomy and review,”10.1016/j.ejor.2010.09.042 ↗
52. Fera · 2013
53. “A survey of scheduling rules,”10.1287/opre.25.1.45 ↗
54. “A taxonomy of flexible flow line scheduling procedures,”10.1016/j.ejor.2006.01.042 ↗
55. “Scheduling 3D printers with multiple printing alternatives,”10.1109/COASE.2017.8256151 ↗
56. Multi-task scheduling of distributed 3D printing services in cloud manufacturing,”10.1007/s00170-017-1543-z ↗
57. “Two-dimensional packing problems: a survey,”10.1016/S0377-2217(02)00123-6 ↗
58. Exact algorithms for the two-dimensional strip packing problem with and without rotations,”10.1016/j.ejor.2008.08.020 ↗
59. “Heuristic approaches for the two- and three-dimensional knapsack packing problem,”10.1016/j.cor.2007.12.004 ↗
60. “A modified genetic algorithm for time and cost optimization of an additive manufacturing single-machine scheduling,”
61. Production planning in additive manufacturing and 3D printing,”10.1016/j.cor.2017.01.013 ↗
62. Pinedo · 2012
63. “Robot task sequencing for a flexible assembly system with 3D printers,”
64. “Optimisation of multi-part production in additive manufacturing for reducing support waste,”10.1080/17452759.2019.1585555 ↗
65. “Shapes in a box: disassembling 3D objects for efficient packing and fabrication,”10.1111/cgf.12608 ↗
66. “Dapper: decompose-and-pack for 3D printing,”10.1145/2816795.2818087 ↗
67. “Level-set-based partitioning and packing optimization of a printable model,”10.1145/2816795.2818064 ↗
68. “Build orientation optimization for multi-part production in additive manufacturing,”
69. “PackMerger: a 3D Print volume optimizer,”10.1111/cgf.12353 ↗
70. “Multi-objective optimization of 3D packing problem in additive manufacturing,”
71. “Efficient parts nesting schemes for improving stereolithography utilization,”10.1016/j.cad.2012.12.002 ↗
72. “A genetic algorithm for automatic packing in Rapid prototyping processes,”
73. Pre-processing methodology for optimizing stereolithography apparatus build performance,”10.1016/j.compind.2006.02.004 ↗
74. “Packing subsets of 3D Parts for Layered manufacturing,”10.1080/10255810213478 ↗
75. “Determination of fabricating orientation and packing in SLS process,”10.1016/S0924-0136(01)00581-7 ↗
76. “Serial packing of arbitrary 3D objects for optimizing layered manufacturing,”
77. “A genetic algorithm for packing three-dimensional non-convex objects having cavities and holes,”
78. “A genetic algorithm for optimizing multiple part placement to reduce build time,”
79. “Cost-driven build orientation and bin packing of parts in Selective Laser Melting (SLM),”
80. The impact of build orientation policies on the completion time in two-dimensional irregular packing for additive manufacturing
81. “Predicting production times through machine learning for scheduling additive manufacturing orders in a PPC system,”
82. “Impact of scheduling policies on the performance of an additive manufacturing production system,”10.1016/j.promfg.2020.01.388 ↗
83. “Order acceptance and scheduling in direct digital manufacturing with additive manufacturing,”
84. A modified tabu search algorithm for the single-machine scheduling problem using additive manufacturing technology,”
85. Job sizing and sequencing in additive manufacturing to control process deterioration10.1080/24725854.2018.1460518 ↗
86. “Examining additive manufacturing in supply chain context through an optimization model,”10.1016/j.cie.2020.106335 ↗
87. “Scheduling of multiple additive manufacturing and 3D printing machines to minimise maximum lateness,”
88. Kucukkoc · 2016 · 3 · 195
89. “A three-dimensional-printing-based agile and ubiquitous additive manufacturing system,”10.1016/j.rcim.2018.07.008 ↗
90. “Matching and selection of distributed 3D printing services in cloud manufacturing,”10.1109/IECON.2017.8216815 ↗
91. “One-machine batching and sequencing of multiple-type items,”10.1016/0305-0548(94)90001-9 ↗
92. Supply chain reconfiguration opportunities arising from additive manufacturing technologies in the digital era,”10.1080/09537287.2018.1540052 ↗
93. Supply chain implications of additive manufacturing: a holistic synopsis through a collection of case studies,”10.1007/s00170-019-03430-w ↗
94. “Additive manufacturing scenarios for distributed production of spare parts,”10.1007/s00170-017-0555-z ↗
95. In search for classification and selection of spare parts suitable for additive manufacturing: a literature review,”
96. “Modeling and analysis of the on-demand spare parts supply using additive manufacturing,”10.1108/RPJ-01-2018-0027 ↗
97. “Automated process planning for hybrid manufacturing,”10.1016/j.cad.2018.04.022 ↗
98. “Value chain and production cost optimization by integrating additive manufacturing in injection molding process chain,”10.1007/s00170-018-2762-7 ↗
99. “Integration of hybrid additive/subtractive manufacturing planning and scheduling by metaheuristics,”10.1016/j.cie.2020.106428 ↗
100. “To kit or not to kit: analysing the value of model-based kitting for additive manufacturing,”10.1016/j.compind.2018.01.022 ↗