Achievements and problems in the first commissioning of superKEKB vacuum system
Source abstract
Abstract
The first (phase-1) commissioning of SuperKEKB, an asymmetric-energy electron–positron collider at High Energy Accelerator Research Organization, known as KEK, Japan, began in February 2016 and successfully ended in June 2016. Three major tasks of the phase-1 commissioning were as follows: (1) vacuum scrubbing of the new beam pipes in anticipation of a sufficiently long beam lifetime in the next commissioning, (2) checking the stabilities of various new vacuum components at high beam currents of approximately 1 A, and (3) beam tuning to study stability and achieve low emittance. The coefficient of photon stimulated desorption rate, η (molecules photon−1), decreased steadily with increasing photon dose, as expected. The temperature increases of the bellows chambers, connection flanges, etc., were less than 5 °C at 1 A. The effectiveness of an antechamber, a TiN coating, and a clearing electrode to suppress the electron cloud effect (ECE) was confirmed. However, the ECE in the Al-alloy bellows chambers without TiN coating was observed. The use of permanent magnets to create an axial magnetic field successfully suppressed this effect. However, the ECE was still exhibited at higher linear current densities (=bunch current/bunch spacing). Furthermore, the attachment of permanent magnets or solenoids even to the beam pipes with antechambers and TiN coating at drift spaces is under consideration before the next (phase-2) commissioning.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Particle Accelerators and Free-Electron Lasers · Particle accelerators and beam dynamics · Superconducting Materials and Applications
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
High Energy Accelerator Research Organization (KEK) , Tsukuba, Ibaraki 305-0801, Japan and , Tsukuba, Ibaraki 305-0801, Japan
The Graduate University for Advanced Studies (SOKENDAI) , Tsukuba, Ibaraki 305-0801, Japan and , Tsukuba, Ibaraki 305-0801, Japan
The Graduate University for Advanced Studies (SOKENDAI) , Tsukuba, Ibaraki 305-0801, Japan
High Energy Accelerator Research Organization (KEK) , Tsukuba, Ibaraki 305-0801, Japan
References (67)
Show source-provided references
1. Beam commissioning of SuperKEKB
2. Commissioning of the phase-1 SuperKEKB B-factory and update on the overall status
3. Prog. Theor. Exp. Phys. · 2013 · 03A00110.1093/ptep/pts102 ↗
4. Prog. Theor. Exp. Phys. · 2013 · 03A01110.1093/ptep/pts083 ↗
5. J. Vac. Sci. Technol., A · 2016 · 34 · 02160510.1116/1.4942455 ↗
6. Vacuum · 2015 · 121 · 23810.1016/j.vacuum.2014.12.010 ↗
7. Prog. Theor. Exp. Phys. · 2013 · 03A00510.1093/ptep/pts068 ↗
8. Impedance calculation and simulation of microwave instability for the main rings of SuperKEKB
9. Vacuum · 2009 · 84 · 69410.1016/j.vacuum.2009.06.027 ↗
10. Synchrotron radiation analysis of the SuperKEKB positron ring
11. Design of the PEP-II low energy ring vacuum system
12. Phys. Rev. Lett. · 2000 · 85 · 382110.1103/PhysRevLett.85.3821 ↗
13. Phys. Rev. Lett. · 1995 · 75 · 152610.1103/PhysRevLett.75.1526 ↗
14. F. Zimmermann, CERN Report No. CERN-SL-Note-2000-004 AP, 2000.
15. Nucl. Instrum. Methods Phys. Res. A · 2004 · 531 · 36710.1016/j.nima.2004.04.237 ↗
16. Rev. Sci. Instrum. · 2007 · 78 · 04330210.1063/1.2723747 ↗
17. J. Vac. Sci. Technol. A · 2005 · 23 · 172110.1116/1.2101808 ↗
18. Application of stain-less steel, copper alloy and aluminum alloy MO (Matsumoto–Ohtsuka)-type flanges to accelerator beam pipes
19. Nucl. Instrum. Methods Phys. Res. A · 2008 · 597 · 15310.1016/j.nima.2008.09.023 ↗
20. J. Vac. Sci. Technol. A · 2012 · 30 · 3160210.1116/1.3696683 ↗
21. Phys. Rev. Spec. Top.-Accel. Beams · 2004 · 7 · 12480110.1103/PhysRevSTAB.7.124801 ↗
22. Study of electron cloud effects in SuperKEKB
23. Update on electron cloud mitigation studies at Cesr-TA
24. Development of TiN coating system for beam ducts of KEK B-factory
25. Nucl. Instrum. Methods Phys. Res. A · 2006 · 556 · 39910.1016/j.nima.2005.10.113 ↗
26. Experimental studies on grooved surfaces to suppress secondary electron emission
27. Phys. Rev. Spec. Top.-Accel. Beams · 2004 · 7 · 03440110.1103/PhysRevSTAB.7.034401 ↗
28. Nucl. Instrum. Methods Phys. Res. A · 2009 · 604 · 44910.1016/j.nima.2009.03.011 ↗
29. Nucl. Instrum. Methods Phys. Res. A · 2015 · 770 · 14110.1016/j.nima.2014.09.069 ↗
30. Design and test of the clearing electrodes for e– cloud mitigation in the e+ DAΦNE ring
31. Experimental measurements of e-cloud mitigation using clearing electrodes in the DAΦNE collider
32. Nucl. Instrum. Methods Phys. Res. A · 2009 · 598 · 37210.1016/j.nima.2008.08.154 ↗
33. Beam tests of a clearing electrode for electron cloud mitigation at KEKB positron ring
34. Buildup of electron cloud with different bunch pattern in the presence of solenoid field
35. The effect of the solenoid field in quadrupole magnets on the electron cloud instability in the KEKB LER
36. Recent progress at KEKB
37. Simulation study of the electron cloud instability in SuperKEKB
38. Progress of SuperKEKB
39. Construction status of SuperKEKB
40. First commissioning of the SuperKEKB vacuum system
41. 1999 · 119
42. J. Vac. Sci. Technol., A · 1987 · 5 · 235510.1116/1.574451 ↗
43. Vacuum · 1983 · 33 · 39710.1016/0042-207X(83)90659-0 ↗
44. J. Vac. Sci. Technol. A · 2001 · 19 · 165210.1116/1.1340661 ↗
45. Gas desorption from TiN-coated copper beam duct
46. S. DeBarger, S. Metcalfe, C. Ng, T. G. Porter, J. Seeman, M. Sullivan, and U. Wienands, SLAC Report No. SLAC-PUB-11752, 2001.
47. Impedance measurements and simulations on the TCT and TDI LHC collimators
48. Nucl. Instrum. Methods Phys. Res. A · 2003 · 513 · 46510.1016/j.nima.2003.06.003 ↗
49. Design of collimator for SuperKEKB positron ring
50. J. Vac. Sci. Technol. A · 2003 · 21 · 143610.1116/1.1577129 ↗
51. Single-shot resolution of X-ray monitor using coded aperture imaging
52. Low energy coded aperture performance at the CESR-TA X-ray beam size monitor
53. Appl. Surf. Sci. · 2001 · 172 · 9510.1016/S0169-4332(00)00838-2 ↗
54. Low secondary electron yield carbon coatings for electron cloud mitigation in modern particle accelerators
55. Experimental electron cloud studies in the CERN Proton Synchrotron
56. The conversion and operation of the cornel electron storage ring as a test accelerator (CESRTA) for damping rings research and development
57. Electron cloud at low emittance in CESRTA
58. TiN coating of the PEP-II Low-Energy Ring aluminum arc vacuum chambers
59. Nucl. Instrum. Methods Phys. Res. A · 2001 · 469 · 110.1016/S0168-9002(01)00704-5 ↗
60. Nucl. Instrum. Methods Phys. Res. A · 2005 · 551 · 18710.1016/j.nima.2005.05.048 ↗
61. Recommendation for the feasibility of a 3 km Damping Ring
62. Measurement of the electron cloud density around the beam
63. Perfect electrode to suppress secondary electrons inside the magnets
64. Observation of vertical beam blow-up in KEKB low energy ring
65. Phys. Rev. Spec. Top.-Accel. Beams · 2006 · 9 · 01280110.1103/PhysRevSTAB.9.012801 ↗
66. Electron cloud instability in SuperKEKB low energy ring
67. Mechanical and vacuum stability design criteria for the LHC experimental vacuum chambers