Commissioning of vacuum system for SuperKEKB positron damping ring

Kyo Shibata, Y. Suetsugu, Takuya Ishibashi, M. Shirai, Shinji Terui, K. Kanazawa, H. Hisamatsu

Publisher page

Abstract

The first stage commissioning of the new positron damping ring, which was constructed in the upgraded injector system of the SuperKEKB, was carried out from February to July 2018. Vacuum scrubbing in the arc sections, which occupy most of the ring, progressed smoothly, and a beam lifetime of 1000 s was obtained with a stored beam current of 10 mA and a beam dose of 0.7 A h. However, the beam lifetime did not increase with subsequent vacuum scrubbing because the beam lifetime was primarily determined by the Touschek effect. The residual gas composition during beam operation was typical of what would be expected for a vacuum system pumped by nonevaporable getter pumps. Rough Molflow+-based estimates of the photon-stimulated desorption yields of the beam pipe at the arc sections revealed that they decreased to 1.4 × 10−4 molec. photon−1 for H2 and to 2.3 × 10−5 molec. photon−1 for CO at a beam dose of 2 A h, which corresponds to a photon dose of 1 × 1023 photons m−1.
Source: openalex_inverted_index · Quality: baseline

Research context

OpenAlex topics: Particle accelerators and beam dynamics · Particle Detector Development and Performance · Particle Accelerators and Free-Electron Lasers

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

References

Reference metadata was not supplied for this record.