EXPERIMENTAL DETERMINATION OF THE STRESS EVOLUTION IN A PREBENT STEEL VERY HIGH-PERFORMANCE CONCRETE BEAM BY MEANS OF AN ACTIVE STRESSMETER
Source abstract
Abstract
This research programme consisted in validating a design method for the prediction of stress redistribution due to concrete creep within the cross-section of an innovative prebent steel VHPC beam. The knowledge of the compression state in concrete due to the technique of prebending was provided by a direct method of stress measurement in concrete by means of an active stressmeter. The system is composed by an embedded ultra flat jack with an oil pressure control to counterbalance continuously the strain signal from gauges located in the area of jack influence with the signal of the reference gauges located in a cross-section submitted to the same stress state as the one where the jack is. The recorded strain signals are in good agreement with the computed values. The accuracy of the stress variation measurements is about 0.2 MPa. During the 4 months of data recording in the instrumented prebent steel VHPC beam, the difference between the absolute stress value measured by the two active stressmeters and the computed stress has kept lower than 1 MPa.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: Concrete Corrosion and Durability · Structural Load-Bearing Analysis · Fire effects on concrete materials
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (12)
Show source-provided references
1. “La poutre Preflex, la décompression du béton enrobant l’aile tendue, le problème du retrait et du fluage”
2. “Preflex Beams: A Method of Calculation of Creep and Shrinkage Effects,”10.1061/(ASCE)1084-0702(2006)11:1(48) ↗
3. Staquet · 2005
4. Le Roy · 1996
5. Staquet · 2007
6. 6. BPEL, “Règles BPEL 91 modifiées 99 (Règles techniques de conception et de calcul des ouvrages et constructions en béton précontraint suivant la méthode des états limites) fascicule n° 62 titre 1er section II du CCTG applicable aux marchés publics de travaux, JO du 16 février 1999” [in French] (1999).
7. “Suivi direct des contraintes dans les structures en béton: dispositifs pour ouvrages existants et en construction, Instrumentation”
8. “Mesure de contraintes sur ouvrages d’art par une méthode de libération miniaturisée, Bulletin de liaison des Laboratoires des Ponts et Chaussées”
9. “SCC casting prediction for the realization of prototype VHPC-precambered composite beams,”10.1617/s11527-006-9190-0 ↗
10. “Une nouvelle approche de la formulation des bétons”
11. “Two-function Method for the Prediction of Concrete creep under decreasing stress,”10.1007/BF02472948 ↗
12. fib-CEB-FIP · 1999