Current Practices in Log Yard Design and Operations in the Province of Quebec, Canada
Source abstract
Abstract
Abstract Log yards play an important role in the forest supply chain by connecting raw material supply to manufacturing processes. Log yard design and operations have not been thoroughly represented in the scientific literature, though research in other industrial sectors has demonstrated the strategic operational importance of warehouses. This article investigates the log yard design and operations in current industrial practices. An analysis of existing log yards was conducted in Quebec. Detailed information about throughput, equipment, personnel, inventory management, and design considerations was gathered by means of questionnaires, on-site visits, and meetings with yard managers. The survey of current practices (design, management, and operations) confirms that most existing yards have been designed without a systematic method. Crucial performance inhibitors included log yard shape, in-flow management, and poor surface material. Results point toward a potential gain in competitiveness by improving log yard practices, optimizing log yard shape and layout, better coordinating the forest–mill operations, and enhancing surface material.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Advanced Manufacturing and Logistics Optimization · Assembly Line Balancing Optimization · Optimization and Packing Problems
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
The authors are, respectively, PhD Student and Professor, FORAC Research Consortium and Dept. of Wood and Forest Sci. (marta.trzcianowska.1@ulaval.ca [corresponding author], Daniel.Beaudoin@sbf.ulaval.ca), and Professor, FORAC Research Consortium, Interuniversity Res. Centre on Enterprise Networks, Logistics, and Transportation, and Dept. of Wood and Forest Sci. (Luc.Lebel@sbf.ulaval.ca), Univ. Laval, Québec, Canada. This paper was received for publication in April 2019. Article no. 19-00018.
References (49)
Show source-provided references
1. Alam, M. B., C. Shahi, and R. Pulkki. 2014. Economic impact of enhanced forest inventory information and merchandizing yards in the forest product industry supply chain. Socio-Econ. Plann. Sci. 48(3):189–197.
2. Baker, P. 2008. The design and operation of distribution centres within agile supply chains. Int. J. Prod. Econ. 111(1):27–41.
3. Baker, P. and M. Canessa. 2009. Warehouse design: A structured approach. Eur. J. Oper. Res. 193(2):425–436.
4. Beaudoin, D., L. LeBel, and M.A. Soussi. 2012. Discrete event simulation to improve log yard operations. INFOR: Inf. Syst. Oper. Res. 50(4):175–185.
5. Christopher, M. and D. Towill. 2001. An integrated model for the design of agile supply chains. Int. J. Phys. Distrib. Logist. Manag. 31(4):235–246.
6. Cormier, G. and E. A. Gunn. 1992. A review of warehouse models. Eur. J. Oper. Res. 58(1):3–13.
7. DaCunha Reis, A., C. G. de Souza, N. N. Da Costa, G. H. C. Stender, P. S. Vieira, and N. D. Pizzolato. 2017. Warehouse design: A systematic literature review. Braz. J. Oper. Prod. Manag. 14(4):542–555.
8. D'Amours, S., M. Ouhimmou, J. F. Audy, and Y. Feng. 2016. Forest Value Chain Optimization and Sustainability. CRC Press, Boca Raton, Florida.
9. Davarzani, H. and A. Norrman. 2015. Toward a relevant agenda for warehousing research: Literature review and practitioners' input. Logist. Res. 8(1). DOI:10.1007/s12159‐014‐0120‐110.1007/s12159‐014‐0120‐1 ↗
10. Deckard, D. L., R. A. Newbold, and C. G. Vidrine. 2003. Benchmark roundwood delivery cycle-times and potential efficiency gains in the southern United States. Forest Prod. J. 53(7):61–69.
11. De Ketele, J. M. and X. Roegiers. 2009. Méthodologie du Recueil d'Informations: Fondements des Méthodes d'Observation, de Questionnaires, d'Interviews et d'Études de Documents [Methodology Of Information Collection: Foundations of Observation Methods, Questionnaires, Interviews and Document Studies]. 5th ed. De Boek Supérieur, Louvain-la-Neuve, Belgium. (In French.)
12. Del Degan, B. and A. Larouche. 2016. Étude comparative des coûts d'approvisionnement et de transformation Québec/Ontario [Comparative study of procurement and processing costs Quebec/Ontario]. Groupe DDM, Quebec, Canada. (In French.)
13. Dotoli, M., N. Epicoco, M. Falagario, N. Costantino, and B. Turchiano. 2015. An integrated approach for warehouse analysis and optimization: A case study. Comput. Ind. 70(1):56–69.
14. Dramm, J. R., R. Govett, T. Bilek, and G. L. Jackson. 2004. Log sort yard economics, planning, and feasibility. General Technical Report FPL-GTR-146. USDA Forest Service, Forest Products Laboratory, Madison, Wisconsin.
15. Dramm, J. R., G. L Jackson, and J. Wong. 2002. Review of log sort yards. General Technical Report FPL-GTR-146. USDA Forest Service, Forest Products Laboratory, Madison, Wisconsin.
16. Favreau, J. 2002. Opti-Stock: Un modèle pour déterminer l'impact du stockage des bois sur les coûts [Opti-Stock: A model to determine the impact of wood storage on the costs]. In:Seminar on Wood Storage: Problems and Solutions, March 26, 2002, Pointe-Claire, Quebec, Canada; Forest Engineering Research Institute of Canada (FERIC), Pointe-Claire, Quebec. pp. 1–11. (In French.)
17. Goh, M., O. Jihong, and T. Chung-Piaw. 2001. Warehouse sizing to minimize inventory and storage costs. Naval Res. Logist. 48(4):299–312.
18. Goulet, P. 2007. Utilisation de la simulation du flux d'une scierie pour déterminer les gains en productivité associés au triage des tiges par dimensions [Using the samill flow simulation to determine the productivity gains associated with sorting stems by dimensions]. Master's thesis. Université Laval, Quebec, Canada. (In French.)
19. Gu, J., M. Goetschalckx, and L. F. McGinnis. 2007. Research on warehouse operation: A comprehensive review. Eur. J. Oper. Res. 177(1):1–21.
20. Gu, J., M. Goetschalckx, and L. F. McGinnis. 2010. Research on warehouse design and performance evaluation: A comprehensive review. Eur. J. Oper. Res. 203(3):539–549.
21. Hampton, C. M. 1981. Dry Land Log Handling and Sorting: Planning, Construction, and Operation of Log Yards. Miller Freeman Publications, San Francisco.
22. Huka, M. A. and M. Gronalt. 2018. Log yard logistics. Silva Fennica52(4). DOI:10.14214/sf.776010.14214/sf.7760 ↗
23. Hultqvist, D. and L. Olsson. 2004. Demand based tactical planning of the roundwood supply chain with respect to stochastic disturbances. FSCN, Mitthögskolan, Sweden. 58pp.
24. Kons, K., D. Bergström, U. Eriksson, D. Athanassiadis, and T. Nordfjell. 2014. Characteristics of Swedish forest biomass terminals for energy. Int. J. Forest Eng. 25(3):238–246.
25. Kostrzewski, M. 2014. In search of unified warehouse designing method. Res. Logist. Prod. 4(3):257–266.
26. LeBel, L. and J. S. Carruth. 1997. Simulation of woodyard inventory variations using a stochastic model. Forest Prod. J. 47(3):52–57.
27. Lee, M. K. and E. A. Elsayed. 2005. Optimization of warehouse storage capacity under a dedicated storage policy. Int. J. Prod. Res. 43(9):1785–1805.
28. Lehoux, N., S. D'Amours, J. Beaulieu, P. Marier, and D. Ouellet. 2012. Le réseau de création de valeur de la fibre de bois canadienne [The value creation network of Canadian wood fiber]. Scientific Report CIRRELT-2012-33. Laurentian Forestry Centre, Quebec, Canada. (In French.)
29. Mackay, G. 2002. Stockage du bois: problèmes et solutions [Wood storage: Issues and solutions]. In:Seminar on Wood Storage: Problems and Solutions, March 26, 2002, Pointe-Claire, Quebec, Canada; Forest Engineering Research Institute of Canada (FERIC), Pointe-Claire, Quebec.(In French.)
30. Mendoza, G. A., R. J. Meimban, P. A. Araman, and W. G. Luppold. 1991. Combined log inventory and process simulation models for the planning and control of sawmill operations. Presented at the 23rd CIRP International Seminar on Manufacturing Systems, June 6–7, Nancy, France, 1991.
31. Moore, J. and D. Cown. 2015. Wood quality variability—What is it, what are the consequences and what we can do about it. N. Z. J. Forestry. 59:3–9.
32. Myers, J. and E. W. Richards. 2003. Supporting wood supply chain decisions with simulation for a mill in northwestern BC. INFOR: Inf. Syst. Oper. Res. 41(3):213–234.
33. Rathke, J., M. A. Huka, and M. Gronalt. 2013. The box assignment problem in log yards. Silva Fennica47(3):1–13.
34. Roodbergen, K. J., I. F.A. Vis, and G. D. Taylor. 2015. Simultaneous determination of warehouse layout and control policies. Int. J. Prod. Res. 53(11):3306–3326.
35. Rouwenhorst, B., B. Reuter, V. Stockrahm, G. J. van Houtum, R. J. Mantel, and W. H. M. Zijm. 2000. Warehouse design and control: Framework and literature review. Eur. J. Oper. Res. 122(3):515–533.
36. Sedney, D. G. 1992. Simulation of a log merchandising and sorting yard. Master's thesis. University of Idaho, Moscow.
37. Sinclair, A. W. J. and G. V. Wellburn. 1984. A Handbook for Designing, Building and Operating a Log Sortyard. Forest Engineering Research Institute of Canada, Vancouver.
38. Strack, G. and Y. Pochet. 2010. An integrated model for warehouse and inventory planning. Eur. J. Oper. Res. 204(1):35–50.
39. Thomas, J. J. and K. F. Wallis. 1971. Seasonal variation in regression analysis. J. R. Stat. Soc Series A (General)134(1):57.
40. Tompkins, J. A., J. A. White, Y. A. Bozer, and J. M. A. Tanchoco. 2010. Facilities Planning. 4th ed. John Wiley & Sons, New York.
41. Tran, E. 2009. Efficacité d'utilisation des chargeuses dans les parcs à bois: Quatre études de cas [Efficiency of loaders's utilization in the wood yards: Four case studies]. Advantage Report 10(9). Forest Engineering Research Institute of Canada (FERIC), Pointe-Claire, Quebec. 8pp. (In French.)
42. Tremblay, E., F. F. Boctor, and J. Renaud. 2012. Impacts de la configuration de l'entrepôt et de la localisation des produits sur l'efficacité des parcours de collecte: Un cas réel [Impacts of warehouse configuration and product localization on the efficiency of collection pathways: A real case]. Scientific Report CIRRELT-2012-54. Laurentian Forestry Centre, Quebec, Canada. (In French.)
43. Trzcianowska, M., L. LeBel, and D. Beaudoin. 2019. Performance analysis of log yards using data envelopment analysis. Int. J. Forest Eng. 30(2):144–154.
44. Vachon-Robichaud, S., D. Beaudoin, and L. LeBel. 2014. Log yard design using discrete-event simulation: First step towards a formalized approach. Presented at MOSIM 2014, 10ième Conférence Francophone de Modélisation, Optimisation et Simulation, November 5–7, 2014, Nancy, France.
45. Van den Berg, J. P. 2007. Integral Warehouse Management: The Next Generation in Transparency, Collaboration and Warehouse Management Systems. Management Outlook Publishing, Utrecht, the Netherlands.
46. Williston, E. M. 1976. Lumber Manufacturing. The Design and Operation of Sawmills and Planer Mills. Miller Freeman Publications, San Francisco.
47. Yammarino, F. J., S. J. Skinner, and T. L. Childers. 1991. Understanding mail survey response behavior: A meta-analysis. Publ. Opin. Q. 55(4):613–639.
48. Yu, J. and H. Cooper. 1983. A quantitative review of research design effects on response rates to questionnaires. J. Mark. Res. 20(1):36–44.
49. Yujie, Z. and W. Fang. 2009. Study on the general plane of log yards based on systematic layout planning. In:2009 International Conference on Information Management, Innovation Management and Industrial Engineering, December 26–27, 2009, Xi'an, China, Vol. 4; Institute of Electrical and Electronics Engineers (IEEE), New York.pp. 92–95.