journal article·2021-03-02Open access

Smart Manufacturing Scheduling Approaches—Systematic Review and Future Directions

Duarte Alemão, André Dionisio Rocha, José Barata

Applied Sciences· Volume 11· Issue 5

Abstract

The recent advances in technology and the demand for highly customized products have been forcing manufacturing companies to adapt and develop new solutions in order to become more dynamic and flexible to face the changing markets. Manufacturing scheduling plays a core role in this adaptation since it is crucial to ensure that all operations and processes are running on time in the factory. However, to develop robust scheduling solutions it is necessary to consider different requirements from the shopfloor, but it is not clear which constraints should be analyzed and most research studies end up considering very few of them. In this review article, several papers published in recent years were analyzed to understand how many and which requirements they consider when developing scheduling solutions for manufacturing systems. It is possible to understand that the majority of them are not able to be adapted to real systems since some core constraints are not even considered. Consequently, it is important to consider how manufacturing scheduling solutions can be structured to be adapted effortlessly for different manufacturing scenarios.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Scheduling and Optimization Algorithms · Digital Transformation in Industry · Flexible and Reconfigurable Manufacturing Systems

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

UNINOVA—Centre of Technology and Systems, FCT Campus, Monte de Caparica, 2829-516 Caparica, Portugal

Department of Electrical and Computer Engineering, Faculty of Sciences and Technology, NOVA University of Lisbon, 1099-085 Lisbon, Portugal

Funding

FCT/MCTES

References (100+)

Show source-provided references
1. Kagermann, H., Wahlster, W., and Helbig, J. (2013). Recommendations for Implementing the Strategic Initiative INDUSTRIE 4.0—Securing the Future of German Manufacturing Industry. Final Report of the Industrie 4.0 Working Group, Acatech—National Academy of Science and Engineering.10.3390/sci4030026 ↗
2. Smart manufacturing standardization: Architectures, reference models and standards framework10.1016/j.compind.2018.06.005 ↗
3. Machine learning in manufacturing: Advantages, challenges, and applications
4. Dionisio Rocha, A., Peres, R., and Barata, J. (2015, January 22–24). An agent based monitoring architecture for plug and produce based manufacturing systems. Proceedings of the 2015 IEEE 13th International Conference on Industrial Informatics (INDIN), Cambridge, UK.10.1109/INDIN.2015.7281926 ↗
5. Review of job shop scheduling research and its new perspectives under Industry 4.010.1007/s10845-017-1350-2 ↗
6. Opportunities of Sustainable Manufacturing in Industry 4.010.1016/j.procir.2016.01.129 ↗
7. Industry 4.0: Smart Scheduling10.1080/00207543.2018.1504248 ↗
8. Two-objective stochastic flow-shop scheduling with deteriorating and learning effect in Industry 4.0-based manufacturing system10.1016/j.asoc.2017.12.009 ↗
9. A dynamic model and an algorithm for short-term supply chain scheduling in the smart factory industry 4.010.1080/00207543.2014.999958 ↗
10. A cloud-based cyber-physical system for adaptive shop-floor scheduling and condition-based maintenance10.1016/j.jmsy.2018.05.008 ↗
11. Scheduling research contributions to Smart manufacturing10.1016/j.mfglet.2017.12.005 ↗
12. Shiue, Y.-R., Lee, K.-C., and Su, C.-T. (2018). Real-time scheduling for a smart factory using a reinforcement learning approach. Comput. Ind. Eng.10.1016/j.cie.2018.03.039 ↗
13. The ‘Internet of Things’ enabled real-time scheduling for remanufacturing of automobile engines10.1016/j.jclepro.2018.02.061 ↗
14. RFID-enabled real-time manufacturing execution system for mass-customization production10.1016/j.rcim.2012.08.001 ↗
15. Lu, C., Gao, L., Li, X., Pan, Q., and Wang, Q. (2017). Energy-efficient permutation flow shop scheduling problem using a hybrid multi-objective backtracking search algorithm. J. Clean. Prod.10.1016/j.jclepro.2017.01.011 ↗
16. Wang, J., Tang, J., Xue, G., and Yang, D. (2016). Towards Energy-efficient Task Scheduling on Smartphones in Mobile Crowd Sensing Systems. Comput. Netw.10.1016/j.comnet.2016.11.020 ↗
17. Carosi, S., Frangioni, A., Galli, L., Girardi, L., and Vallese, G. (2019). A Tool for Practical Integrated Time-Table Design and Vehicle Scheduling in Public Transport Systems. A View of Operations Research Applications in Italy, Springer.10.1007/978-3-030-25842-9_16 ↗
18. Staff scheduling and rostering: A review of applications, methods and models10.1016/S0377-2217(03)00095-X ↗
19. Non-identical parallel machine scheduling using genetic algorithm10.1016/j.eswa.2010.12.064 ↗
20. An effective hybrid genetic algorithm and tabu search for flexible job shop scheduling problem10.1016/j.ijpe.2016.01.016 ↗
21. Scheduling in cloud manufacturing: State-of-the-art and research challenges
22. Genetic programming for production scheduling: A survey with a unified framework10.1007/s40747-017-0036-x ↗
23. A research survey: Review of AI solution strategies of job shop scheduling problem10.1007/s10845-013-0837-8 ↗
24. Energy-efficient scheduling in manufacturing companies: A review and research framework10.1016/j.ejor.2015.07.017 ↗
25. Parallel machine scheduling with maintenance activities10.1016/j.cie.2016.09.020 ↗
26. A hybrid genetic algorithm with two-stage dispatching heuristic for a machine scheduling problem with step-deteriorating jobs and rate-modifying activities10.1016/j.cie.2016.05.028 ↗
27. Framinan, J.M., Leisten, R., and Ruiz García, R. (2014). Manufacturing Scheduling Systems, Springer.10.1007/978-1-4471-6272-8 ↗
28. Pinedo, M.L. (2016). Scheduling Theory, Algorithms, and Systems, Springer International Publishing.
29. Mattfeld, D.C. (1996). Evolutionary search and the job shop: Investigations on genetic algorithms for production scheduling. Production and Logistic, Springer.
30. Genetic algorithms for shop scheduling problems: A survey
31. Scheduling flexible job-shops with transportation times: Mathematical models and a hybrid imperialist competitive algorithm10.1016/j.apm.2016.09.022 ↗
32. Workload balancing in identical parallel machine scheduling using a mathematical programming method10.1080/18756891.2013.853932 ↗
33. Ouazene, Y., Hnaien, F., Yalaoui, F., and Amodeo, L. (2011). The Joint Load Balancing and Parallel Machine Scheduling Problem. Operations Research Proceedings, Springer.10.1007/978-3-642-20009-0_79 ↗
34. Network modeling and evolutionary optimization for scheduling in manufacturing10.1007/s10845-011-0569-6 ↗
35. Towards a Methodology for Developing Evidence-Informed Management Knowledge by Means of Systematic Review
36. Iwamura, K., and Sugimura, N. (2010, January 10–13). A study on real-time scheduling for autonomous distributed manufacturing systems. Proceedings of the IEEE International Conference on Systems, Man and Cybernetics, Istanbul, Turkey.10.1109/ICSMC.2010.5642451 ↗
37. Tran, L.V., Huynh, B.H., and Akhtar, H. (2019). Ant Colony Optimization Algorithm for Maintenance, Repair and Overhaul Scheduling Optimization in the Context of Industrie 4.0. Appl. Sci., 9.10.3390/app9224815 ↗
38. Evolutionary Optimization in Uncertain Environments—A Survey10.1109/TEVC.2005.846356 ↗
39. Hybrid heuristic search approach for deadlock-free scheduling of flexible manufacturing systems using Petri nets
40. A genetic algorithm embedded with a concise chromosome representation for distributed and flexible job-shop scheduling problems10.1007/s10845-015-1083-z ↗
41. JIT-scheduling in unrelated parallel-machine environment with aging effect and multi-maintenance activities
42. Klement, N., Abdeljaouad, M.A., Porto, L., and Silva, C. (2021). Lot-Sizing and Scheduling for the Plastic Injection Molding Industry—A Hybrid Optimization Approach. Appl. Sci., 11.10.3390/app11031202 ↗
43. Rivera-Gómez, H., Montaño-Arango, O., Corona-Armenta, J., Garnica-González, J., Ortega-Reyes, A., and Anaya-Fuentes, G. (2019). JIT Production Strategy and Maintenance for Quality Deteriorating Systems. Appl. Sci., 9.10.3390/app9061180 ↗
44. Multi-agent based approach for single machine scheduling with sequence-dependent setup times and machine maintenance10.1016/j.asoc.2014.06.020 ↗
45. Single-machine-based joint optimization of predictive maintenance planning and production scheduling10.1016/j.rcim.2018.01.002 ↗
46. Exploring the impacts and contributions of maintenance function for sustainable manufacturing10.1080/00207543.2020.1808257 ↗
47. A simulation-based study of dispatching rules in a dynamic job shop scheduling problem with batch release and extended technical precedence constraints10.1016/j.ejor.2016.07.030 ↗
48. A study on local search neighborhoods for the job shop scheduling problem with total weighted tardiness objective10.1016/j.cor.2015.07.011 ↗
49. Optimizing the sum of maximum earliness and tardiness of the job shop scheduling problem10.1016/j.cie.2017.02.019 ↗
50. Homayouni, S.M., and Fontes, D.B.M.M. (2021). Production and transport scheduling in flexible job shop manufacturing systems. J. Glob. Optim.10.1007/s10898-021-00992-6 ↗
51. Optimisation of distributed manufacturing flexible job shop scheduling by using hybrid genetic algorithms10.1007/s10845-015-1084-y ↗
52. Economic and Energetic Performance Evaluation of Unreliable Production Lines: An Integrated Analytical Approach10.1109/ACCESS.2020.3029761 ↗
53. Key performance indicators for assessing inherent energy performance of machine tools in industries10.1080/00207543.2018.1508904 ↗
54. Helu, M., Libes, D., Lubell, J., Lyons, K., and Morris, K.C. (2016, January 21–24). Enabling Smart Manufacturing Technologies for Decision-Making Support. Proceedings of the ASME 2016 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference, Charlotte, NC, USA.10.1115/DETC2016-59721 ↗
55. Rescheduling in job-shop problems for sustainable manufacturing systems10.1016/j.jclepro.2016.11.002 ↗
56. A branch-and-bound algorithm for minimizing the total weighted completion time on parallel identical machines with two competing agents10.1016/j.knosys.2016.05.012 ↗
57. A bio-inspired mobile agent-based integrated system for flexible autonomic job shop scheduling10.1016/j.jmsy.2013.01.005 ↗
58. The job shop scheduling problem with convex costs10.1016/j.ejor.2018.01.027 ↗
59. Solving the flexible job shop scheduling problem with sequence-dependent setup times10.1016/j.ejor.2017.08.021 ↗
60. A reinforcement learning approach to parameter estimation in dynamic job shop scheduling10.1016/j.cie.2017.05.026 ↗
61. Multi-object optimization of flexible flow shop scheduling with batch process—Consideration total electricity consumption and material wastage10.1016/j.jclepro.2018.02.224 ↗
62. An effective L-MONG algorithm for solving multi-objective flow-shop inverse scheduling problems10.1007/s10845-015-1129-2 ↗
63. Dynamic Agent-based Bi-objective Robustness for Tardiness and Energy in a Dynamic Flexible Job Shop10.1016/j.procir.2016.11.126 ↗
64. A hybrid genetic algorithm and tabu search for a multi-objective dynamic job shop scheduling problem10.1080/00207543.2012.751509 ↗
65. Heuristic approaches for scheduling jobs in large-scale flexible job shops10.1016/j.cor.2015.11.004 ↗
66. IPro-GA: An integrated prognostic based GA for scheduling jobs and predictive maintenance in a single multifunctional machine10.1016/j.ifacol.2016.07.847 ↗
67. Multi-agent-based scheduling in cloud manufacturing with dynamic task arrivals10.1016/j.procir.2018.03.138 ↗
68. Dynamic scheduling of shared human-robot manufacturing operations10.1016/j.procir.2018.04.007 ↗
69. Optimized Adaptive Scheduling of a Manufacturing Process System with Multi-skill Workforce and Multiple Machine Types: An Ontology-based, Multi-agent Reinforcement Learning Approach10.1016/j.procir.2016.11.011 ↗
70. Automatic design of scheduling rules for complex manufacturing systems by multi-objective simulation-based optimization10.1016/j.cirp.2016.04.066 ↗
71. A GEP-based reactive scheduling policies constructing approach for dynamic flexible job shop scheduling problem with job release dates10.1007/s10845-012-0626-9 ↗
72. An energy-efficient multi-objective optimization for flexible job-shop scheduling problem10.1016/j.compchemeng.2017.05.004 ↗
73. Silva, C., Klement, N., and Gibaru, O. (2018). A Generic Decision Support Tool for Lot-Sizing and Scheduling Problems with Setup and Due Dates. Closing the Gap Between Practice and Research in Industrial Engineering, Springer.10.1007/978-3-319-58409-6_15 ↗
74. Automatic design of scheduling policies for dynamic multi-objective job shop scheduling via cooperative coevolution genetic programming10.1109/TEVC.2013.2248159 ↗
75. Design of an efficient genetic algorithm for resource-constrained unrelated parallel machine scheduling problem with machine eligibility restrictions10.1007/s10845-015-1117-6 ↗
76. A local search genetic algorithm for the job shop scheduling problem with intelligent agents10.1016/j.cie.2015.04.006 ↗
77. An efficient chaotic based PSO for earliness/tardiness optimization in a batch processing flow shop scheduling problem10.1007/s10845-015-1158-x ↗
78. A Petri net-based particle swarm optimization approach for scheduling deadlock-prone flexible manufacturing systems10.1007/s10845-015-1161-2 ↗
79. A novel teaching-learning-based optimization algorithm for energy-efficient scheduling in hybrid flow shop10.1109/TEM.2017.2774281 ↗
80. Scheduling in aerospace composite manufacturing systems: A two-stage hybrid flow shop problem10.1007/s00170-017-1429-0 ↗
81. Discrete harmony search algorithm for flexible job shop scheduling problem with multiple objectives10.1007/s10845-014-0869-8 ↗
82. Robust job shop scheduling problem: Mathematical models, exact and heuristic algorithms10.1016/j.eswa.2016.01.054 ↗
83. A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms10.1016/j.cor.2016.03.009 ↗
84. Flexible Job-Shop Rescheduling for New Job Insertion by Using Discrete Jaya Algorithm10.1109/TCYB.2018.2817240 ↗
85. Multi Agent model based on Chemical Reaction Optimization with Greedy algorithm for Flexible Job shop Scheduling Problem10.1016/j.procs.2017.08.174 ↗
86. Exact and heuristic algorithms for the just-in-time scheduling problem in a batch processing system10.1016/j.cor.2016.12.001 ↗
87. Energy-efficient dynamic scheduling for a flexible flow shop using an improved particle swarm optimization10.1016/j.compind.2015.10.001 ↗
88. Artificial bee colony algorithm for scheduling and rescheduling fuzzy flexible job shop problem with new job insertion10.1016/j.knosys.2016.06.014 ↗
89. An improved particle swarm optimization with decline disturbance index (DDPSO) for multi-objective job-shop scheduling problem10.1016/j.cor.2013.11.019 ↗
90. Minimizing the total completion time on a parallel machine system with tool changes10.1016/j.cie.2015.11.015 ↗
91. Integration of process planning and scheduling using chaotic particle swarm optimization algorithm10.1016/j.eswa.2016.08.019 ↗
92. Hybrid genetic algorithms for minimizing makespan in dynamic job shop scheduling problem10.1016/j.cie.2016.03.011 ↗
93. Two-stage assembly scheduling problem for processing products with dynamic component-sizes and a setup time10.1016/j.cie.2016.12.030 ↗
94. An improved artificial bee colony algorithm for flexible job-shop scheduling problem with fuzzy processing time10.1016/j.eswa.2016.07.046 ↗
95. Wang, L., Cai, J., Li, M., and Liu, Z. (2017). Flexible Job Shop Scheduling Problem Using an Improved Ant Colony Optimization. Sci. Program., 2017.10.1155/2017/9016303 ↗
96. A new immune multi-agent system for the flexible job shop scheduling problem10.1007/s10845-015-1137-2 ↗
97. Cloud manufacturing—Scheduling as a service for sheet metal manufacturing
98. Energy-efficient multi-objective flexible manufacturing scheduling10.1016/j.jclepro.2020.124610 ↗
99. A Pareto-based genetic algorithm for multi-objective scheduling of automated manufacturing systems10.1177/1687814019885294 ↗
100. An integrated production scheduling and delivery route planning with multi-purpose machines: A case study from a furniture manufacturing company10.1016/j.ijpe.2019.05.017 ↗