journal article·2017-10-11Open access

An Integrated Risk Index Model Based on Hierarchical Fuzzy Logic for Underground Risk Assessment

Muhammad Fayaz, Israr Ullah, Dong-Hwan Park, Kwangsoo Kim, DoHyeun Kim

Applied Sciences· Volume 7· Issue 10

Abstract

Available space in congested cities is getting scarce due to growing urbanization in the recent past. The utilization of underground space is considered as a solution to the limited space in smart cities. The numbers of underground facilities are growing day by day in the developing world. Typical underground facilities include the transit subway, parking lots, electric lines, water supply and sewer lines. The likelihood of the occurrence of accidents due to underground facilities is a random phenomenon. To avoid any accidental loss, a risk assessment method is required to conduct the continuous risk assessment and report any abnormality before it happens. In this paper, we have proposed a hierarchical fuzzy inference based model for under-ground risk assessment. The proposed hierarchical fuzzy inference architecture reduces the total number of rules from the rule base. Rule reduction is important because the curse of dimensionality damages the transparency and interpretation as it is very tough to understand and justify hundreds or thousands of fuzzy rules. The computation time also increases as rules increase. The proposed model takes 175 rules having eight input parameters to compute the risk index, and the conventional fuzzy logic requires 390,625 rules, having the same number of input parameters to compute risk index. Hence, the proposed model significantly reduces the curse of dimensionality. Rule design for fuzzy logic is also a tedious task. In this paper, we have also introduced new rule schemes, namely maximum rule-based and average rule-based; both schemes can be used interchangeably according to the logic needed for rule design. The experimental results show that the proposed method is a virtuous choice for risk index calculation where the numbers of variables are greater.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Underground infrastructure and sustainability · Infrastructure Maintenance and Monitoring · Geotechnical Engineering and Underground Structures

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Department of Computer Engineering, Jeju National University, Jeju 63243, Korea

ETRI, 218 Gajenong-ro Yuseung-Gu, Daejeon 34129, Korea

References (25)

Show source-provided references
1. Risk and decision analysis for large underground projects, as applied to the Stockholm ring road tunnels10.1016/0886-7798(96)00019-3 ↗
2. Environmental risk assessment for underground storage tanks through an interval parameter fuzzy relation analysis approach10.1080/00908319950014975 ↗
3. Paolucci, R., and Pitilakis, K. (2007, January 25–28). Seismic risk assessment of underground structures under transient ground deformations. Proceedings of the 4th International Conference on Earthquake Geotechnical Engineering-Invited Lectures, Thessaloniki, Greece.
4. An adaptive neuro-fuzzy inference system for bridge risk assessment10.1016/j.eswa.2007.06.026 ↗
5. Fuzzy logic-based risk assessment
6. Fuzzy logic for piping risk assessment (pfLOPA)10.1016/j.jlp.2009.06.011 ↗
7. Using fuzzy inference system for architectural space analysis10.1016/j.asoc.2009.10.011 ↗
8. Modeling of hierarchical fuzzy systems10.1016/S0165-0114(02)00517-1 ↗
9. Jelleli, T.M., and Alimi, A.M. (2010, January 18–23). Automatic design of a least complicated hierarchical fuzzy system. Proceedings of the International Conference on Fuzzy Systems, Barcelona, Spain.10.1109/FUZZY.2010.5584439 ↗
10. Zaidi, A., Rokbani, N., and Alimi, A. (arXiv, 2014). Implementation of a hierarchical fuzzy controller for a biped robot, arXiv.10.1109/ICBR.2013.6729270 ↗
11. Kleta, H., and Heyduk, A. (2014). Image processing and analysis as a diagnostic tool for an underground infrastructure technical condition monitoring. Underground Infrastructure of Urban Areas 3, Taylor & Francis Group.10.1201/b17539-6 ↗
12. Lej, K. (2014). The technical and economic conditions for the construction of the central section of metro line II in Warsaw. Underground Infrastructure of Urban Areas 3, Taylor & Francis Group.10.1201/b17539-11 ↗
13. Kuttisseril, J., and Kuang, K. (2015, January 11–13). Development of a low-cost image processing technique for crack detection for structural health monitoring. Proceedings of the 3rd ASEAN Australian Engineering Congress (AAEC 2015): Australian Engineering Congress on Innovative Technologies for Sustainable Development and Renewable Energy, Engineers, Singapore.
14. Sun, M.H., Zhao, Y.X., Jiang, W., and Feng, T.T. (2012). A scheme for excavation displacement monitoring based on image processing. Applied Mechanics and Materials, Trans Tech Publications.10.4028/www.scientific.net/AMM.226-228.1923 ↗
15. Adaptive vision-based crack detection using 3D scene reconstruction for condition assessment of structures10.1016/j.autcon.2011.11.018 ↗
16. Qi, D., Liu, Y., Wu, X., and Zhang, Z. (2014, January 27–29). An algorithm to detect the crack in the tunnel based on the image processing. Proceedings of the 2014 Tenth International Conference on Intelligent Information Hiding and Multimedia Signal Processing, Kitakyushu, Japan.10.1109/IIH-MSP.2014.217 ↗
17. Meng, Q., Wang, X., Qu, X., Yong, K., Lee, S., and Wong, S. (2009, January 20–21). Quantitative risk assessment models of road tunnels-state of the art and their implications for singapore’s road tunnels. Proceedings of the 2nd International Tunnel Safety Forum for Road and Rail, Lyon, France.
18. Event tree analysis for steam generator tube ruptures
19. Quantitative risk assessment modeling for nonhomogeneous urban road tunnels10.1111/j.1539-6924.2010.01503.x ↗
20. Predicting the likelihood of structural accidents
21. A risk assessment methodology for incorporating uncertainties using fuzzy concepts10.1016/S0951-8320(02)00158-8 ↗
22. Fujino, T. (1994). The Development of a Method for Investigating Construction Site Accidents Using Fuzzy Fault Tree Analysis. [Ph.D. Thesis, The Ohio State University].
23. Kim, K., Park, D.-H., Lee, J., and Jin, S.-I. (2015, January 28–30). Ugs middleware for monitoring state of underground utilities. Proceedings of the 2015 International Conference on Information and Communication Technology Convergence (ICTC), Jeju, Korea.10.1109/ICTC.2015.7354770 ↗
24. An experiment in linguistic synthesis with a fuzzy logic controller10.1016/S0020-7373(75)80002-2 ↗
25. Zhao, J., and Bose, B.K. (2002, January 5–8). Evaluation of membership functions for fuzzy logic controlled induction motor drive. Proceedings of the IEEE 2002 28th Annual Conference of the Industrial Electronics Society (IECON 02), Sevilla, Spain.