A Dispatching-Fuzzy AHP-TOPSIS Model for Scheduling Flexible Job-Shop Systems in Industry 4.0 Context
Source abstract
Abstract
Scheduling flexible job-shop systems (FJSS) has become a major challenge for different smart factories due to the high complexity involved in NP-hard problems and the constant need to satisfy customers in real time. A key aspect to be addressed in this particular aim is the adoption of a multi-criteria approach incorporating the current dynamics of smart FJSS. Thus, this paper proposes an integrated and enhanced method of a dispatching algorithm based on fuzzy AHP (FAHP) and TOPSIS. Initially, the two first steps of the dispatching algorithm (identification of eligible operations and machine selection) were implemented. The FAHP and TOPSIS methods were then integrated to underpin the multi-criteria operation selection process. In particular, FAHP was used to calculate the criteria weights under uncertainty, and TOPSIS was later applied to rank the eligible operations. As the fourth step of dispatching the algorithm, the operation with the highest priority was scheduled together with its initial and final time. A case study from the smart apparel industry was employed to validate the effectiveness of the proposed approach. The results evidenced that our approach outperformed the current company’s scheduling method by a median lateness of 3.86 days while prioritizing high-throughput products for earlier delivery.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Scheduling and Optimization Algorithms · Advanced Manufacturing and Logistics Optimization · Digital Transformation in Industry
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Department of Industrial Management, Agroindustry and Operations, Universidad de la Costa CUC, Barranquilla 080003, Colombia
Department of Engineering, University of Napoli “Parthenope”, 80143 Naples, Italy
Department of Civil and Mechanical Engineering, University of Cassino and Southern Lazio, 03043 Cassino, Italy
Department of Industrial Engineering, Institución Universitaria ITSA, Barranquilla 080003, Colombia
References (58)
Show source-provided references
1. Distributed scheduling problems in intelligent manufacturing systems10.26599/TST.2021.9010009 ↗
2. Flowshop scheduling with sequence dependent setup times and batch delivery in supply chain10.1016/j.cie.2021.107378 ↗
3. Multi-level, multi-stage lot-sizing and scheduling in the flexible flow shop with demand information updating10.1111/itor.12645 ↗
4. Modified particle swarm algorithm for scheduling agricultural products
5. Process planning for reliable high-speed machining of moulds10.1080/00207540210140068 ↗
6. Machine scheduling with orientation selection and two-dimensional packing for additive manufacturing10.1016/j.cor.2021.105245 ↗
7. Cutting force integration at the CAM stage in the high-speed milling of complex surfaces10.1080/09511920500069309 ↗
8. Solving flexible job shop scheduling problem by a multi-swarm collaborative genetic algorithm10.23919/JSEE.2021.000023 ↗
9. Sangaiah, A.K., Suraki, M.Y., Sadeghilalimi, M., Hosseinabadi, A.A.R., and Wang, J. (2019). A new meta-heuristic algorithm for solving the flexible dynamic job-shop problem with parallel machines. Symmetry, 11.10.3390/sym11020165 ↗
10. Vargas, J., and Calvo, R. (2018). Joint optimization of process flow and scheduling in service-oriented manufacturing systems. Materials, 11.10.3390/ma11091559 ↗
11. Dynamic scheduling in flexible job shop systems by considering simultaneously efficiency and stability10.1016/j.cirpj.2009.10.001 ↗
12. Multiagent scheduling method with earliness and tardiness objectives in flexible job shops10.1109/TSMCB.2004.842412 ↗
13. Červeňanská, Z., Važan, P., Juhás, M., and Juhásová, B. (2021). Multi-criteria optimization in operations scheduling applying selected priority rules. Appl. Sci., 11.10.3390/app11062783 ↗
14. A hybrid cooperative coevolution algorithm for fuzzy flexible job shop scheduling10.1109/TFUZZ.2019.2895562 ↗
15. Multiobjective hybrid genetic algorithms for manufacturing scheduling: Part I models and algorithms10.1007/978-3-662-47241-5_1 ↗
16. Machine learning and optimization for production rescheduling in Industry 4.010.1007/s00170-020-05850-5 ↗
17. Real-time production scheduling in the Industry-4.0 context: Addressing uncertainties in job arrivals and machine breakdowns10.1016/j.cor.2020.105031 ↗
18. Mihoubi, B., Bouzouia, B., and Gaham, M. (2020). Reactive scheduling approach for solving a realistic flexible job shop scheduling problem. Int. J. Prod. Res., 1–19.10.1080/00207543.2020.1790686 ↗
19. Lim, C.H., Moon, S.K., and Okpoti, E.S. (2019, January 15–18). A Reusable Scheduling Problem Decomposition Framework for Smart Factories. Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, Macao, China.10.1109/IEEM44572.2019.8978579 ↗
20. Vazan, P., Cervenanska, Z., Kotianova, J., and Krizanova, G. (2019, January 26–29). The impact of selected priority rules on production goals. Proceedings of the 2019 20th International Carpathian Control Conference, Krakow-Wieliczka, Poland.10.1109/CarpathianCC.2019.8765924 ↗
21. Anarchic manufacturing10.1080/00207543.2018.1521534 ↗
22. Scheduling in production, supply chain and Industry 4.0 systems by optimal control: Fundamentals, state-of-the-art and applications10.1080/00207543.2018.1442948 ↗
23. Dynamic priority based dispatching of AGVs in flexible job shops10.1016/j.procir.2019.02.119 ↗
24. Murín, S., and Rudová, H. (2019). Scheduling of Mobile Robots Using Constraint Programming. Lect. Notes Comput. Sci., 456–471.10.1007/978-3-030-30048-7_27 ↗
25. Kim, J.W., and Kim, S.K. (2019). Interactive job sequencing system for small make-to-order manufacturers under smart manufacturing environment. Peer Peer Netw. Appl.10.1007/s12083-019-00808-1 ↗
26. A human centred hybrid MAS and meta-heuristics based system for simultaneously supporting scheduling and plant layout adjustment10.5937/fmet1904699A ↗
27. Design of Job Scheduling System and Software for Packaging Process with SPT. EDD. LPT. CDS and NEH algorithm at PT. ACP10.1088/1757-899X/528/1/012045 ↗
28. Lunardi, W.T., Voos, H., and Cherri, L.H. (2018, January 4–7). An Imperialist Competitive Algorithm for a Real-World Flexible Job Shop Scheduling Problem. Proceedings of the IEEE International Conference on Emerging Technologies and Factory Automation, ETFA, Turin, Italy.10.1109/ETFA.2018.8502596 ↗
29. Ortíz-Barrios, M., Neira-Rodado, D., Jiménez-Delgado, G., and Hernández-Palma, H. (2018). Using fahp-vikor for operation selection in the flexible job-shop scheduling problem: A case study in textile industry. Lect. Notes Comput. Sci.10.1007/978-3-319-93818-9_18 ↗
30. Wang, C., Jiang, P., and Lu, T. (2016, January 7–10). The production instruction system for smart job shop. Proceedings of the IEEE International Conference on Mechatronics and Automation, Harbin, China.10.1109/ICMA.2016.7558846 ↗
31. A distributed approach solving partially flexible job-shop scheduling problem with a Q-learning effect10.1016/j.ifacol.2017.08.2354 ↗
32. A Dynamic Approach to Multi-stage Job Shop Scheduling in an Industry 4.0-Based Flexible Assembly System
33. A simulation study on a flexible manufacturing systems for producing aircraft engine parts (WIP)
34. Yuan, G.C., Bao, J.S., Zhang, Q.W., and Li, Z.Q. (2017, January 11–13). An intelligent scheduling method for manufacturing system based on M2M. Proceedings of the International Conference on Computers and Industrial Engineering, CIE, Lisbon, Portugal.
35. Towards a 5G compliant and flexible connected manufacturing facility | [Hacia una infraestructura de fabricación flexible, conectada e integrable en redes 5G]10.6036/8831 ↗
36. The Internet of Things enabled manufacturing enterprise information system design and shop floor dynamic scheduling optimisation10.1080/17517575.2019.1609703 ↗
37. A hybrid particle swarm optimisation algorithm and fuzzy logic for process planning and production scheduling integration in holonic manufacturing systems10.1080/09511920903207472 ↗
38. Single-machine scheduling problem with flexible maintenance and non-resumable jobs to minimise makespan10.1049/iet-cim.2020.0014 ↗
39. The effects of a machine failure on the robustness of job shop systems-the predictive-reactive approach
40. Creating a road map for industry 4.0 by using an integrated fuzzy multicriteria decision-making methodology10.1007/s00500-020-05041-0 ↗
41. A multi-criteria approach for FMEA in product development in industry 4.0
42. Performance evaluation of SMEs towards Industry 4.0 using fuzzy group decision making methods10.1007/s42452-020-2085-9 ↗
43. A dispatching algorithm for flexible job-shop scheduling with transfer batches: An industrial application10.1080/09537287.2013.782846 ↗
44. AHP and TOPSIS Integration for Green Supplier Selection: A Case Study in Indonesia10.1088/1742-6596/1845/1/012015 ↗
45. Evaluation of hospital disaster preparedness by a multi-criteria decision making approach: The case of Turkish hospitals10.1016/j.ijdrr.2020.101748 ↗
46. Strategic renewable energy resources selection for Pakistan: Based on SWOT-Fuzzy AHP approach10.1016/j.scs.2019.101861 ↗
47. User needs elicitation via analytic hierarchy process (AHP). A case study on a Computed Tomography (CT) scanner10.1186/1472-6947-13-2 ↗
48. A review of fuzzy AHP methods for decision-making with subjective judgements10.1016/j.eswa.2020.113738 ↗
49. Hwang, C.L., and Yoon, K.P. (1981). Multiple Attributes Decision Making Methods and Applications, Springer.10.1007/978-3-642-48318-9_3 ↗
50. A-TOPSIS—An approach based on TOPSIS for ranking evolutionary algorithms10.1016/j.procs.2015.07.054 ↗
51. Optimization of fuzzy programming with TOPSIS algorithm10.1016/j.procs.2020.05.144 ↗
52. Dispatching algorithm for production programming of flexible job-shop systems in the smart factory industry10.1007/s10479-017-2678-x ↗
53. Improving risk evaluation in FMEA with cloud model and hierarchical TOPSIS method10.1109/TFUZZ.2018.2861719 ↗
54. Jiménez-Delgado, G., Santos, G., Félix, M.J., Teixeira, P., and Sá, J.C. (2020). A combined ahp-topsis approach for evaluating the process of innovation and integration of management systems in the logistic sector. HCI International 2020–Late Breaking Papers: Interaction, Knowledge and Social Media, Springer.10.1007/978-3-030-60152-2_40 ↗
55. Bid, S., and Siddique, G. (2019). Human risk assessment of panchet dam in India using TOPSIS and WASPAS multi-criteria decision-making (MCDM) methods. Heliyon, 5.10.1016/j.heliyon.2019.e01956 ↗
56. Zhang, F., Mei, Y., Nguyen, S., and Zhang, M. (2021). Collaborative multifidelity-based surrogate models for genetic programming in dynamic flexible job shop scheduling. IEEE Trans. Cybern.10.1109/CEC55065.2022.9870243 ↗
57. Ortíz, M. (2013). Theory of constraints and LP modeling as strategic decision tools for productivity increasing in the towel line of a textile-confection sector company. Prospectiva.
58. Ortiz, M., Neira, D., Jiménez, G., and Hernández, H. (2016, January 14–20). Solving flexible job-shop scheduling problem with transfer batches, setup times and multiple resources in apparel industry. Proceedings of the International Conference on Swarm Intelligence, Belgrade, Serbia.10.1007/978-3-319-41009-8_6 ↗