journal article·2018-09-03Open access

A Dynamic Scheduling Method for Carrier Aircraft Support Operation under Uncertain Conditions Based on Rolling Horizon Strategy

Peilong Yuan, Wei Han, Xichao Su, Jie Liu, Jingyu Song

Applied Sciences· Volume 8· Issue 9

Abstract

The efficient scheduling of carrier aircraft support operations in the flight deck is important for battle performances. The supporting operations and maintenance processes involve multiple support resources, complex scheduling process, and multiple constraints; the efficient coordination of these processes can be considered a multi-resource constrained multi-project scheduling problem (MRCMPSP), which is a complex non-deterministic polynomial-time hard (NP-hard) problem. The renewable resources include the operational crews, resource stations, and operational spaces, and the non-renewable resources include oil, gas, weapons, and electric power. An integer programming mathematical model is established to solve this problem. A periodic and event-driven rolling horizon (RH) scheduling strategy inspired by the RH optimization method from predictive control technology is presented for the dynamic scheduling environment. The periodic horizon scheduling strategy can track the changes of the carrier aircraft supporting system, and the improved event-driven mechanism can avoid unnecessary scheduling with effective resource allocation under uncertain conditions. The dual population genetic algorithm (DPGA) is designed to solve the large-scale scheduling problem. The activity list encoding method is proposed, and a new adaptive crossover and mutation strategy is designed to improve the global exploration ability. The double schedule for leftward and rightward populations is integrated into the genetic process of alternating iterations to improve the convergence speed and decrease the computation amount. The computational results show that our approach is effective at solving the scheduling problem in the dynamic environment, as well as making better decisions regarding disruption on a real-time basis.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Resource-Constrained Project Scheduling · Scheduling and Optimization Algorithms · Scheduling and Timetabling Solutions

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Department of Airborne Vehicle Engineering, Naval Aviation University, Yantai 264001, China

Department of Astronautical Science and Engineering, National University of Defense Technology, Changsha 410073, China

System Engineering Research Institute, China State Shipbuilding Corporation, Beijing 10094, China

Funding

National Natural Science Foundation of China

References (43)

Show source-provided references
1. John, F., and Gerald, L.T. (1963). The critical path method, resource planningand scheduling. Industrial Scheduling, Prentice Hall.
2. A survey of variants and extensions of the resource-constrained project scheduling problem10.1016/j.ejor.2009.11.005 ↗
3. Scheduling subject to resource constraints: Classification and complexity10.1016/0166-218X(83)90012-4 ↗
4. branch-and-cut procedure for the multimode resource-constrained project-scheduling problem10.1287/ijoc.1040.0121 ↗
5. Project scheduling under uncertainty: Survey and research potentials10.1016/j.ejor.2004.04.002 ↗
6. The multimode resource constrained multiproject scheduling problem: Alternative formulations10.1002/aic.11522 ↗
7. Milp formulations for single-and multi-mode resource-constrained project scheduling problems10.1016/j.compchemeng.2011.06.007 ↗
8. A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations10.1007/s10951-015-0423-3 ↗
9. A knowledge-based evolutionary multiobjective approach for stochastic extended resource investment project scheduling problems10.1109/TEVC.2013.2283916 ↗
10. Multi-objective optimization model for multi-project scheduling on critical chain10.1016/j.advengsoft.2013.11.004 ↗
11. Johnston, J.S. (2009). A Feasibility Study of a Persistent Monitoring System for the Flight Deck of U.S. Navy Aircraft Carrier. [Master’s Thesis, Air Force Institute of Technology-Graduate School of Engineering & Management].10.2514/6.2009-5647 ↗
12. Feasibility study of global-positioning-system-based aircraft-carrier flight-deck persistent monitoring system10.2514/1.C000220 ↗
13. Ryan, J.C., Cummings, M., Roy, N., Banerjee, A., and Schulte, A. (2011, January 29–31). Designing an interactive local and global decision support system for aircraft carrier deck scheduling. Proceedings of the Infotech@Aerospace Conferences and Exhibit 2011 (AIAA), St. Louis, MO, USA.10.2514/6.2011-1516 ↗
14. Comparing the performance of expert user heuristics and an integer linear program in aircraft carrier deck operations10.1109/TCYB.2013.2271694 ↗
15. Development of an agent-based model for aircraft carrier flight deck operations
16. Michini, B., and How, J.P. (2011, January 29–31). A human-interactive course of action planner for aircraft carrier deck operations. Proceedings of the Infotech@Aerospace Conferences and Exhibit 2011 (AIAA), St. Louis, MO, USA.10.2514/6.2011-1515 ↗
17. Dastidar, R.G., and Frazzoli, E. (2011, January 29–31). A queueing network based approach to distributed aircraft carrier deck scheduling. Proceedings of the Infotech@Aerospace Conferences and Exhibit 2011 (AIAA), St. Louis, MO, USA.
18. Zhang, Z., Lin, S., Dong, R., and Zhu, Q. (2015, January 5–9). Designing a human-computer cooperation decision planning system for aircraft carrier deck scheduling. Proceedings of the Infotech@Aerospace Conferences and Exhibit 2015 (AIAA), Kissimmee, FL, USA.10.2514/6.2015-1111 ↗
19. A multi-agent based intelligent configuration method for aircraft fleet maintenance personnel10.1016/j.cja.2014.02.016 ↗
20. Yu, L., Zhu, C., Shi, J., and Zhang, W. (2017). An extended flexible job shop scheduling model for flight deck scheduling with priority, parallel operations, and sequence flexibility. Sci. Program., 2017.10.1155/2017/2463252 ↗
21. Integrated maintenance support scheduling method of multi carrier aircrafts
22. Pit-stop support scheduling on deck of carrier plane based on memetic algorithm
23. Jiang, T., Su, X., and Han, W. (2017, January 17–19). Optimization of support scheduling on deck of carrier aircraft based on improved differential evolution algorithm. Proceedings of the 2017 3rd IEEE International Conference on Control Science and Systems Engineering (ICCSSE), Beijing, China.10.1109/CCSSE.2017.8087910 ↗
24. Dynamic scheduling of aircraft landings10.1016/j.ejor.2016.08.015 ↗
25. Moser, I., and Hendtlass, T. (2007, January 1–5). Solving dynamic single-runway aircraft landing problems with extremal optimisation. Proceedings of the 2007 IEEE Symposium on Computational Intelligence in Scheduling, Honolulu, HI, USA.10.1109/SCIS.2007.367691 ↗
26. The self-designing high-reliability organization: Aircraft carrier flight operations at sea
27. Reactive scheduling in the multi-mode rcpsp10.1016/j.cor.2010.01.001 ↗
28. Robust and reactive project scheduling: A review and classification of procedures10.1080/00207540310001638055 ↗
29. Robust execution strategies for project scheduling with unreliable resources and stochastic durations10.1007/s10951-015-0425-1 ↗
30. Dynamic aircraft carrier flight deck task planning based on HTN10.1016/j.ifacol.2016.07.810 ↗
31. Gürkan, H. (2014). An Integrated Approach for Robust Airline Scheduling, Aircraft Fleeting and Routing with Cruise Speed Control. [Master’s Thesis, Bilkent University].
32. Kuster, J., and Jannach, D. (2006, January 27–30). Handling airport ground processes based on resource-constrained project scheduling. Proceedings of the International Conference on Industrial, Engineering and Other Applications of Applied Intelligent Systems, Annecy, France.10.1007/11779568_20 ↗
33. Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm10.1016/S0377-2217(97)00348-2 ↗
34. New continuous-time and discrete-time mathematical formulations for resource-constrained project scheduling problems10.1016/j.compchemeng.2014.05.009 ↗
35. Project scheduling with multiple modes: A comparison of exact algorithms10.1002/(SICI)1097-0037(199812)32:4<283::AID-NET5>3.0.CO;2-I ↗
36. A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem10.1016/j.ejor.2009.03.034 ↗
37. A genetic algorithm approach to a general category project scheduling problem10.1109/5326.740669 ↗
38. Differential evolution for solving multi-mode resource-constrained project scheduling problems10.1016/j.cor.2008.11.010 ↗
39. A rolling horizon job shop rescheduling strategy in the dynamic environment10.1007/BF01305874 ↗
40. Dishan, Q., Chuan, H., Jin, L., and Manhao, M. (2013). A dynamic scheduling method of earth-observing satellites by employing rolling horizon strategy. Sci. World J., 2013.10.1155/2013/304047 ↗
41. Developing a dynamic rolling-horizon decision strategy for yard crane scheduling10.1016/j.aei.2011.02.003 ↗
42. Dynamic rolling strategy for multi-vessel quay crane scheduling10.1016/j.aei.2017.09.001 ↗
43. A dual-population genetic algorithm for adaptive diversity control10.1109/TEVC.2010.2043362 ↗