journal article·2021-03-19Open access

Multi-Criteria Optimization in Operations Scheduling Applying Selected Priority Rules

Zuzana Červeňanská, Pavel Važan, Martin Juhás, Bohuslava Juhásová

Applied Sciences· Volume 11· Issue 6

Abstract

The utilization of a specific priority rule in scheduling operations in flexible job shop systems strongly influences production goals. In a context of production control in real practice, production performance indicators are evaluated always en bloc. This paper addresses the multi-criteria evaluating five selected conflicting production objectives via scalar simulation-based optimization related to applied priority rule. It is connected to the discrete-event simulation model of a flexible job shop system with partially interchangeable workplaces, and it investigates the impact of three selected priority rules—FIFO (First In First Out), EDD (Earliest Due Date), and STR (Slack Time Remaining). In the definition of the multi-criteria objective function, two scalarization methods—Weighted Sum Method and Weighted Product Method—are employed in the optimization model. According to the observations, EDD and STR priority rules outperformed the FIFO rule regardless of the type of applied multi-criteria method for the investigated flexible job shop system. The results of the optimization experiments also indicate that the evaluation via applying multi-criteria optimization is relevant for identifying effective solutions in the design space when the specific priority rule is applied in the scheduling operations.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Scheduling and Optimization Algorithms · Advanced Manufacturing and Logistics Optimization · Assembly Line Balancing Optimization

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Institute of Applied Informatics, Automation and Mechatronics, Faculty of Material Science and Technology in Trnava, Slovak University of Technology in Bratislava, 91724 Trnava, Slovakia

Funding

Vedecká Grantová Agentúra MŠVVaŠ SR a SAV

References (48)

Show source-provided references
1. Pinedo, M.L. (2016). Scheduling—Theory, Algorithms, and Systems, Springer. [5th ed.].
2. Shahzad, A., and Mebarki, N. (2016). Learning dispatching rules for scheduling: A synergistic view comprising decision trees, Tabu search and simulation. Computers, 5.10.3390/computers5010003 ↗
3. Dynamic scheduling of manufacturing systems using machine learning: An updated review10.1017/S0890060413000516 ↗
4. Rescheduling Manufacturing Systems: A Framework of Strategies, Policies, and Methods10.1023/A:1022235519958 ↗
5. Efficient priority rules for dynamic sequencing with sequence-dependent setups
6. Deroussi, L., Gourgand, M., and Tchernev, N. (2006, January 25–27). Combining optimization methods and discrete event simulation: A case study in flexible manufacturing systems. Proceedings of the 2006 International Conference on Service Systems and Service Management, Troyes, France.10.1109/ICSSSM.2006.320512 ↗
7. Multi-objective optimization of production scheduling with evolutionary computation: A review
8. A state of the art review of intelligent scheduling10.1007/s10462-018-9667-6 ↗
9. Multi-objective scheduling of dynamic job shop using variable neighborhood search10.1016/j.eswa.2009.05.001 ↗
10. Comparison of dispatching rules in job-shop scheduling problem using simulation: A case study10.2507/IJSIMM11(3)2.201 ↗
11. Kück, M., Eike, B., and Freitag, M. (2017, January 3–6). Towards adaptive simulation-based optimization to select individual dispatching rules for production control. Proceedings of the 2017 Winter Simulation Conference (WSC), Las Vegas, NV, USA.10.1109/WSC.2017.8248096 ↗
12. Job shop scheduling techniques in semiconductor manufacturing10.1007/s00170-004-2296-z ↗
13. Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system10.1016/j.ijpe.2010.08.017 ↗
14. Solving multi-objective production scheduling problems using metaheuristics10.1016/j.ejor.2003.08.029 ↗
15. Rapid modeling and discovery of priority dispatching rules: An autonomous learning approach10.1007/s10951-006-5591-8 ↗
16. Zahmani, M.H., Atmani, B., Bekrar, A., and Aissani, N. (2015, January 25–27). Multiple priority dispatching rules for the job shop scheduling problem. Proceedings of the 2015 3rd International Conference on Control, Engineering & Information Technology (CEIT), Tlemcen, Algeria.10.1109/CEIT.2015.7232991 ↗
17. Evaluating the Robustness of Production Schedules using Discrete-Event Simulation10.1016/j.ifacol.2017.08.896 ↗
18. Automatic design of scheduling rules for complex manufacturing systems by multi-objective simulation-based optimization10.1016/j.cirp.2016.04.066 ↗
19. Dynamic integrated process planning, scheduling and due-date assignment using ant colony optimization10.1016/j.cie.2020.106799 ↗
20. Review on flexible job shop scheduling10.1049/iet-cim.2018.0009 ↗
21. Survey and state of the art. Evolutionary multiobjective optimization: Open research areas and some challenges lying ahead10.1007/s40747-019-0113-4 ↗
22. Multi-objective grey wolf optimizer: A novel algorithm for multi-criterion optimization10.1016/j.eswa.2015.10.039 ↗
23. Kemppainen, K. (2005). Priority Scheduling Revisited–Dominant Rules, Open Protocols, and Integrated Order Management, Helsinki School of Economics–HSE Print. [1st ed.].
24. Survey of Multi-Objective Optimization Methods for Engineering10.1007/s00158-003-0368-6 ↗
25. A new method for autonomous control of complex job shops–Integrating order release, sequencing and capacity control to meet due dates10.1016/j.jmsy.2016.10.006 ↗
26. An efficient search method for multi-objective flexible job shop scheduling problems10.1007/s10845-008-0216-z ↗
27. Baker, K.R., and Trietsch, D. (2009). Principles of Sequencing and Scheduling, John Wiley & Sons, Inc.10.1002/9780470451793 ↗
28. A review on swarm intelligence and evolutionary algorithms for solving flexible job shop scheduling problems
29. A simple and effective evolutionary algorithm for multiobjective flexible job shop scheduling10.1016/j.ijpe.2012.03.034 ↗
30. Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system10.1016/j.ejor.2019.11.016 ↗
31. A genetic algorithm for the Flexible Job-shop Scheduling Problem10.1016/j.cor.2007.02.014 ↗
32. A novel hybrid antlion optimization algorithm for multi-objective task scheduling problems in cloud computing environments
33. A two-stage hybrid memetic algorithm for multiobjective job shop scheduling10.1016/j.eswa.2011.02.142 ↗
34. Multi-objective permutation flow shop scheduling problem: Literature review, classification and current trends10.1016/j.omega.2013.07.004 ↗
35. New approaches to due date assignment in job shops10.1016/j.ejor.2007.02.020 ↗
36. Savasci, F., and Herrmann, F. (2018, January 8). Application of priority rules in production planning and control using the example of automotive logistics. Proceedings of the Applied Research Conference, Regensburg, Germany.
37. Performance guarantee of two simple priority rules for production scheduling10.1016/S0925-5273(00)00024-4 ↗
38. A preference-based evolutionary algorithm for multiobjective optimization: The weighting achievement scalarizing function genetic algorithm10.1007/s10898-014-0214-y ↗
39. T’Kindt, V., and Billaut, J.C. (2006). Multicriteria Scheduling–Theory, Models and Algorithms, Springer. [2nd ed.].
40. Multicriteria scheduling10.1016/j.ejor.2004.07.011 ↗
41. An effective ant colony optimization algorithm for multi-objective job-shop scheduling with equal-size lot-splitting10.1016/j.asoc.2017.04.062 ↗
42. Optimization of weighted aggregated sum product assessment10.5755/j01.eee.122.6.1810 ↗
43. Fitriasari, N.S., Fitriani, S.A., and Sukamto, R.A. (2017, January 25–26). Comparison of weighted product method and technique for order preference by similarity to ideal solution method: Complexity and accuracy. Proceedings of the 2017 3rd International Conference on Science in Information Technology (ICSITech), Bandung, Indonesia.10.1109/ICSITech.2017.8257155 ↗
44. A weighted product method for bidding strategies in multi-attribute auctions10.1007/s11424-010-9337-5 ↗
45. Mateo, J.R.S.C. (2012). Weighted Sum Method and Weighted Product Method. Multi Criteria Analysis in the Renewable Energy Industry, Springer. [1st ed.].10.1007/978-1-4471-2346-0_4 ↗
46. Vazan, P., Cervenanska, Z., Kotianova, J., and Krizanova, G. (2019, January 26–29). The impact of selected priority rules on production goals. Proceedings of the 2019 20th International Carpathian Control Conference (ICCC), Krakow-Wieliczka, Poland.10.1109/CarpathianCC.2019.8765924 ↗
47. Human lifting simulation using a multi-objective optimization approach10.1007/s11044-009-9186-y ↗
48. A comparison of priority rules for the job shop scheduling problem under different flow time- and tardiness-related objective functions