This paper presents a comprehensive study of the Xiangsizhou Bridge, a double-tower double-cable steel–concrete composite girder cable-stayed bridge located in Pingnan, Guangxi, China. A finite element model of the full-bridge spatial truss system was established using a dual main beam simulation of the steel–concrete composite girder. To obtain the initial reasonable bridge state, the minimum bending energy method was employed, followed by optimization of the state using the unknown load coefficient method to attain the final reasonable completion state. This paper proposes an innovative construction scheme for the erection of the main girders, which is designed to address the issue of excessive tensile stresses in the bridge deck slabs that can arise in conventional construction schemes. This scheme can save about 4 months of construction time and shorten the construction cycle of main beam erection by 60%. Furthermore, the study derived and verified a formula for the intermediate cable force during the construction process, which demonstrated its effectiveness. This study provides practical value for the design and construction of similar bridges.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Structural Engineering and Vibration Analysis · Structural Load-Bearing Analysis · Mechanical stress and fatigue analysis
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
School of Civil Engineering, Changsha University of Science & Technology, Changsha 410114, China
References (25)
Show source-provided references
1. Dynamic characteristics of a curved steel-concrete composite cable-stayed bridge and effects of different design choices10.1016/j.istruc.2021.10.060 ↗
2. Structural Performance and Strength Prediction of Steel-to-Concrete Box Girder Deck Transition Zone of Hybrid Steel-Concrete Cable-Stayed Bridges10.1061/(ASCE)BE.1943-5592.0000958 ↗
3. Finite-Element Model for Collapse and Long-Term Analysis of Steel–Concrete Composite Beams10.1061/(ASCE)0733-9445(2004)130:3(489) ↗
4. Load distribution for composite steel-concrete horizontally curved box girder bridge10.1016/j.jcsr.2015.08.042 ↗
5. Zhou, G.P., Li, A.Q., Li, J.H., Duan, M.J., Xia, Z.Y., and Zhu, L. (2019). Determination and Implementation of Reasonable Completion State for the Self-Anchored Suspension Bridge with Extra-Wide Concrete Girder. Appl. Sci., 9.10.3390/app9122576 ↗
6. Factors affecting slip and stress distribution of concrete slabs in composite beams10.1016/j.engstruct.2021.112880 ↗
7. Optimal prestress design of composite cable-stayed bridges10.1016/j.compstruct.2016.09.008 ↗
8. Yan, D.H. (2001). Rational Design State Determination and Construction Control of Cable-Stayed Bridge. [Ph.D. Thesis, Hunan University].
9. A Good Practice for the Proof Testing of Cable-Stayed Bridges10.3390/app12073547 ↗
10. Optimization of cable preloading on cable-stayed bridges
11. Determination of initial cable forces in prestressed concrete cable-stayed bridges for given design deck profiles using the force equilibrium method10.1016/S0045-7949(98)00315-0 ↗
12. Determination of optimum post-tensioning cable forces of cable-stayed bridges10.1016/j.engstruct.2012.06.009 ↗
13. The effect of post-tensioning force and different cable arrangements on the behavior of cable-stayed bridge10.1016/j.istruc.2022.08.105 ↗
14. Experimental study on long-term performance of steel-concrete composite bridge with an assembled concrete deck10.1016/j.conbuildmat.2019.04.167 ↗
15. Research on working procedure of lag pouring of wet-joint in bridge deck concrete slab on composite girder of cable-stayed bridge
16. Research on multi-segment cyclic construction technology of main girder of cable-stayed bridge with composite girder
17. The determination of the problem of the cable-stayed bridge reasonable superpositioning optimization under the constant load state, basing on the unknown load coefficient method of Midas/Civil10.4028/www.scientific.net/AMM.178-181.2081 ↗
18. Wang, L.F., Xiao, Z.W., Li, M., and Fu, N. (2023). Cable Force Optimization of Cable-Stayed Bridge Based on Multiobjective Particle Swarm Optimization Algorithm with Mutation Operation and the Influence Matrix. Appl. Sci., 13.10.3390/app13042611 ↗
19. Practical method of optimization of cable tensions for cable-stayed bridges
20. Wu, Z.R. (2014). Determining of Reasonable Completion State and Simulation Analysis of Construction Controlling of Cable-Stayed Bridges. [Master’s Thesis, Chongqing University].
21. A new probabilistic frequency-domain approach for influence line extraction from static transmissibility measurements under unknown moving loads10.1016/j.engstruct.2020.110625 ↗
22. Forward-iteration method for determining rational construction state of cable-stayed bridges
23. Dynamic Performance Analysis of a Curved Cable-Stayed Bridge Based on the Direct Method and the Sensitivity-Based Iterative Method10.1155/2022/7071760 ↗
24. Seismic reliability analysis of reinforced concrete bridge pier using efficient response surface method-based simulation10.1177/1369433218773422 ↗
25. Control method of stress-free status for erection of cable-stayed bridge