journal article·2023-10-23Open access

Performance Analysis of Interval Type-2 Fuzzy X¯ and R Control Charts

Túlio S. Almeida, Amanda dos Santos Mendes, Paloma M. S. Rocha Rizol, Marcela A. G. Machado

Applied Sciences· Volume 13· Issue 20

Abstract

Statistical process control (SPC) is one of the most powerful techniques for improving quality, as it is able to detect special causes of problems in processes, products and services with a remarkable degree of accuracy. Among SPC tools, X¯ and R control charts are widely employed in process monitoring. However, scenarios involving vague, imprecise and even subjective data require a type-2 fuzzy set approach. Thus, X¯ and R control charts should be coupled with interval type-2 triangular fuzzy numbers (IT2TFN) in order to add further information to traditional control charts. This paper proposes a performance analysis of IT2TFN and X¯ and R control charts by means of average run length (ARL), standard deviation of the run length (SDRL) and RL percentile. Computer simulations were carried out considering 10,000 runs to obtain ARL, SDRL and the 5th, 25th, 50th, 75th and 95th RL percentiles. Simulation results reveal that the proposed control charts increased fault detection capability (speed of response) and slightly reduced the number of false alarms in processes under control. Moreover, it was observed that, in addition to superior performance, IT2TFN X¯-R control charts proved to be more robust and flexible when compared to traditional control charts.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Advanced Statistical Process Monitoring · Fuzzy Systems and Optimization · Advanced Statistical Methods and Models

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Department of Production Engineering, São Paulo State University, Guaratinguetá 05508-070, SP, Brazil

Department of Electrical Engineering, São Paulo State University, Guaratinguetá 05508-070, SP, Brazil

Funding

São Paulo State University

References (34)

Show source-provided references
1. Oakland, J., and Oakland, R. (2019). Statistical Process Control, Routledge. [7th ed.].10.4324/9781315160511 ↗
2. Stapenhurst, T. (2005). Mastering Statistical Process Control, Elsevier Butterwoth-Heinemann. [1st ed.].10.1016/B978-075066529-2/50008-5 ↗
4. Development of fuzzy X¯-S control charts with unbalanced fuzzy data10.1007/s00500-020-05430-5 ↗
5. Fuzzy sets as a basis for a theory of possibility10.1016/0165-0114(78)90029-5 ↗
6. Mendel, J.M. (2001). Uncertain Rule-Based Fuzzy Logic Systems—Introduction and New Directions, Prentice Hall. [1st ed.].
7. JCGM (Joint Commettee for Guides in Metrology) (2008). Evaluation of Measurement Data—Guide to the Expression of Uncertainty in Measurement, BIPM (Bureau International des Poids et Mesures). [1st ed.].
8. Fuzzy control chart for monitoring mean and range of univariate processes10.1590/0101-7438.2019.039.02.0339 ↗
9. A study on average run length of fuzzy EWMA control chart10.1007/s00500-022-07310-6 ↗
10. Type-2 Fuzzy Sets Made Simple10.1109/91.995115 ↗
11. Design of variable control charts based on type-2 fuzzy sets with real case study10.1007/s00500-020-05172-4 ↗
12. Chen, C., and Shen, Q. (2017). Transformation-Based Fuzzy Rule Interpolation Using Interval Type-2 Fuzzy Sets. Algorithms, 10.10.3390/a10030091 ↗
13. Javanmard, M., and Nehi, H.M. (2017, January 7–9). Solving interval type-2 fuzzy linear programming problem with a new ranking function method. Proceedings of the Iranian Joint Congress on Fuzzy and Intelligent Systems (CFIS), Qazvin, Iran.10.1109/CFIS.2017.8003586 ↗
14. Different methods to fuzzy X¯-R control charts used in production: Interval type-2 fuzzy set example10.1108/JEIM-01-2018-0011 ↗
15. Karnik, N.N., and Mendel, J.M. (1998, January 4–9). Introduction to Type-2 Fuzzy Logic Systems. Proceedings of the IEEE FUZZ Conference, Anchorage, AK, USA.
16. Type-2 fuzzy logic systems10.1109/91.811231 ↗
17. Analytical Structure and Performance of Interval Type-2 Fuzzy Two-Term Controllers with Varying Footprint of Uncertainty10.1007/s44196-022-00162-w ↗
18. Analysis of the difference between footprints of uncertainty for interval type-2 fuzzy PI controllers10.1007/s00500-022-07386-0 ↗
19. A Synthetic Control Chart for Monitoring the Mean and Variance10.1108/13552510610654556 ↗
20. Montgomery, D.C. (2012). Introduction to Statistical Quality Control, John Wiley & Sons. [7th ed.].
21. An alternative approach to fuzzy control charts: Direct fuzzy approach10.1016/j.ins.2006.08.013 ↗
22. Development of fuzzy X¯-R and X¯-S control charts using α-cuts10.1016/j.ins.2008.09.022 ↗
23. Exponentially Weighted Moving Average Control Chart Based on Normal Fuzzy Random Variables10.1007/s40815-019-00610-4 ↗
24. Construction of fuzzy X¯-S control charts with an unbiased estimation of standard deviation for a triangular fuzzy random variables10.3233/IFS-151551 ↗
25. Castillo, O., and Melin, P. (2007, January 2–4). Type-2 Fuzzy Logic: Theory and Applications. Proceedings of the IEEE International Conference on Granular Computing (GRC), San Jose, CA, USA.10.1109/GrC.2007.118 ↗
26. Fuzzy Analytic Hierarchy Process with Interval Type-2 Fuzzy Sets10.1016/j.knosys.2014.02.001 ↗
27. Effects of parameter estimation on control chart properties: A literature review10.1080/00224065.2006.11918623 ↗
28. The Mean and Standard Deviation of the Run Length Distribution of Charts when Control Limits are Estimated
29. The Difficulty in Designing Shewhart X-bar and X Control Charts with Estimated Parameters10.1080/00224065.2015.11918120 ↗
30. Run Length Distribution and Percentiles: The Shewhart Chart with Unknown Parameters10.1080/08982110701276653 ↗
31. Performance measures for the Shewhart X¯ control chart10.1081/QEN-120038020 ↗
32. Design of EWMA Control Charts for Assuring Predetermined Production Process Quality
33. Monitoring the process mean and variance using synthetic control chart with two-stage testing10.1080/00207540802047098 ↗
34. Some omnibus exponentially weighted moving average statistical process monitoring schemes10.1080/00401706.1991.10484836 ↗