A Study of the Effects of Geological Conditions on Korean Tunnel Construction Time Using the Updated NTNU Drill and Blast Prediction Model
Source abstract
Abstract
This paper analyses the construction time and advance rate of a 3 km long drill and blast tunnel under various geological conditions using an upgraded NTNU drill and blast prediction model. The analysis was carried out for the five types of Korean tunnel supports according to the rock mass quality (from Type 1, meaning a very good rock mass quality; to Type 5, meaning a very poor rock mass quality). Four kinds of rock properties, as well as the rock mass quality, for each tunnel support type were applied to simulate different geological conditions based on previous studies and the NTNU model. The construction time was classified into five categories: basic, standard, gross, tunnel and total, according to the operation characteristics to more effectively analyse the time. In addition, to consider the actual geological conditions in tunnelling, the construction times for the three mixed geological cases were analysed. It was found that total construction time of a tunnel covering all the operations and site preparations with a very poor rock mass quality was more than twice that of a tunnel with a very good rock mass quality for the same tunnel length. It is thought that this study can be a useful approach to estimating the construction time and advance rate in the planning or design stage of a drill and blast tunnel.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Tunneling and Rock Mechanics · Rock Mechanics and Modeling · Drilling and Well Engineering
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Department of Earth Resources and Environmental Engineering, Hanyang University, Seoul 04763, Korea
Funding
Korea Agency for Infrastructure Technology Advancement
References (39)
Show source-provided references
1. Big tunnel in bad rock10.1061/(ASCE)1090-0241(2001)127:9(726) ↗
2. Daller, J. (2017, January 23). Selection of Construction Methods in Rock Tunneling. Proceedings of the 11th International Tunnelling and Underground Structures Conference, Ljubljana, Slovenian.
3. Hard Rock Tunnel Boring: Prognosis and Costs10.1016/0886-7798(88)90029-6 ↗
4. Nelson, P., O’Rourke, T.D., and Kulhawy, F.H. (1983, January 20–23). Factors Affecting TBM Penetration Rates in Sedimentary Rocks. Proceedings of the 24th US Symposium on Rock Mechanics, College Station, TX, USA.
5. Bamford, W.F. (1984, January 22–24). Rock Test Indices Are Being Successfully Correlated with Tunnel Boring Machine Performance. Proceedings of the 5th Australian Tunneling Conference, Melbourne, Australia.
6. The relative cuttability of coal-measures stone10.1016/S0167-9031(86)90250-1 ↗
7. Howarth, D.F. (1986). Hard rock continuous mining machine: Mobile Miner MM-120. Rock Excavation Engineering Seminar, Department of Mining and Metallurgical Engineering, University of Queensland.
8. Innaurato, N., Mancini, R., Rondena, E., and Zaninetti, A. (1991, January 16). Forecasting and effective TBM performances in a rapid excavation of a tunnel in Italy. Proceedings of the Seventh International Congress ISRM, Aachen, Germany.
9. Nelson, P., and Laubach, S.E. (1994). A boreability model for TBM’s. Rock Mechanics Models and Measurements Challenges from Industry. Proceedings of the 1st North American Rock Mechanics Symposium, Balkema.
10. Rostami, J. (1993). Design Optimization, Performance Prediction and Economic Analysis of Tunnel Boring Machine for the Construction of the Proposed Yucca Mountain Nuclear Waste Repository. [Master’s Thesis, Colorado School of Mines].
11. Bruland, A. (1998). Hard Rock Tunnel Boring. [Ph.D. Thesis, Norwegian University of Science and Technology].
12. TBM performance in rock using QTBM
13. Drill and blast tunneling practices10.1061/(ASCE)1084-0680(2002)7:3(125) ↗
14. European Commission (2018). Annex 13 of Assessment of Unit Costs (Standard Prices) of Rail Projects (CAPital EXpenditure), European Commission.
15. (2021, July 31). Putzmeister. Available online: http://bestsupportunderground.com/tbm-drill-and-blast/?lang=en.
16. Decision Aids for Tunneling10.3141/1656-02 ↗
17. The decision aids for tunnelling(dat)—A brief review
18. Probabilistic assessment of tunnel construction performance based on data10.1016/j.tust.2013.02.006 ↗
19. Analysis of NATM tunneling method using CYCLONE modeling and simulation tools10.1088/1757-899X/933/1/012002 ↗
20. Construction time analysis for different steps in drill-and-blast method of hydro power tunnel excavation
21. An analysis of excavation cycle time for Korean tunnels and the comparison with the Standard of Construction Estimate
22. NTNU (2007). Report 2A-05 Drill and Blast Tunnelling-Blast Design, NTNU, Department of Civil and Transport Engineering.
23. NTNU (2007). Report 2B-05 Drill and Blast Tunneling-Advance Rate, NTNU, Department of Civil and Transport Engineering.
24. NTNU (2007). Report 2C-05 Drill and Blast Tunneling-Cost, NTNU, Department of Civil and Transport Engineering.
25. Norwegian Tunnelling Society (2004). Norwegian Tunnelling, Norwegian Tunnelling Society. Publication No. 14.
26. Zare, S. (2007). Prediction Model and Simulation Tool for Time and Costs of Drill and Blast Tunnelling. [Ph.D. Thesis, Norwegian University of Science and Technology].
27. Evaluating D&B and TBM tunnelling using NTNU prediction models10.1016/j.tust.2016.06.012 ↗
28. Zare, S., and Bruland, A. (2007). Progress of Drill and Blast Tunneling Efficiency with Relation to Excavation Time and Costs, ITA World Tunnel Congress.10.1201/NOE0415408073.ch133 ↗
29. Effect of rock mass quality on construction time in a road tunnel10.1016/j.tust.2009.02.004 ↗
30. Kim, Y. (2009). Tunnel Contour Quality Index in a Drill & Blast Tunnel. [Ph.D. Thesis, Norwegian University of Science and Technology].
31. NTNU (1996). Report 2E-95 Tunelling Road Tunnels-Completion and Installations, NTNU, Department of Building and Transport Engineering. (In Norwegian).
32. NTNU (2000). Report 2F-99 Tunnelling Unit Time System for Excavation, Rock Support and Installations, NTNU, Department of Civil and Transport Engineering. (In Norwegian).
33. Bruland, A. (1998). Report 13A-98 Drillability Test Methods, NTNU, Department of Civil and Transport Engineering.
34. Analysis of the potential of some Nigerian rocks to wear drill bit
35. MOLIT (Ministry of Land, Infrastructure and Transport of Korea) (2021). Practical Design Tips for the Construction of National Roadway.
36. Bieniawski, Z.T. (1984). Rock Mechanics Design in mining and Tunneling, Balkema.
37. Macias, F.J., and Bruland, A. (2014, January 27–29). D&B versus TBM: Review of the Parameters for a Right Choice of the Excavation Method. Proceedings of the ISRM Regional Symposium-EUROCK, Vigo, Spain.10.1201/b16955-141 ↗
38. Dynamic reduction of time and cost uncertainties in tunneling projects10.1016/j.tust.2020.103774 ↗
39. NGI (2015). Using the Q-system: Handbook, NGI.