journal article·2022-02-12Open access

Order Releasing and Scheduling for a Multi-Item MTO Industry: An Efficient Heuristic Based on Drum Buffer Rope

Lei Yue, Guangyan Xu, Jabir Mumtaz, Yarong Chen, Tao Zou

Applied Sciences· Volume 12· Issue 4

Abstract

Increasing productivity and efficiency in factories with make-to-order (MTO) production systems have attracted growing interest of academia and industry. In MTO companies, efficient order release and schedule are essential for succeeding in today’s marketplace. However, dynamic demand of customers and constrained resources make it difficult to achieve, as well as limiting the profits. Thus, to overcome the problem of order releasing and multi-item scheduling considering the capacity constrained resources investigated, a heuristic approach is proposed based on the drum-buffer-rope (DBR) method. The proposed heuristic is tested on different types of problems based on due date tightness and demand of products. The performance of the proposed heuristic is compared with other famous heuristic methods in literature. End results indicate that the proposed heuristic based on the DBR method outperforms against the other competitors, and it gives more significant results when optimal buffer size is adopted.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Scheduling and Optimization Algorithms · Advanced Manufacturing and Logistics Optimization · Optimization and Packing Problems

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

School of Mechanical and Electrical Engineering, Guangzhou University, Guangzhou 510006, China

School of Mechanical Science and Engineering, Huazhong University of Science and Technology, Wuhan 430074, China

College of Mechanical and Electronic Engineering, Wenzhou University, Wenzhou 325035, China

Department of Mechanical Engineering, Capital University of Science and Technology, Islamabad 45750, Pakistan

Funding

National Natural Science Foundation of China

References (37)

Show source-provided references
1. Castro, R.F., Godinho-Filho, M., and Tavares-Neto, R.F. (2020). Dispatching method based on particle swarm optimization for make-to-availability. J. Intell. Manuf., 1–10.10.1007/s10845-020-01707-6 ↗
2. Learning and adaptation of a policy for dynamic order acceptance in make-to-order manufacturing10.1016/j.cie.2009.08.005 ↗
3. A robust customer order scheduling problem along with scenario-dependent component processing times and due dates10.1016/j.jmsy.2020.12.013 ↗
4. Order acceptance and scheduling decisions in make-to-order systems10.1016/j.ijpe.2010.02.002 ↗
5. Increasing the total net revenue for single machine order acceptance and scheduling problems using an artificial bee colony algorithm10.1057/jors.2012.47 ↗
6. Order review/release and lot splitting in drum buffer-rope10.1080/002075497195731 ↗
7. Abdel-Basset, M., Mohamed, R., Abouhawwash, M., Chakrabortty, R.K., and Ryan, M.J. (2021). A simple and effective approach for tackling the permutation flow shop scheduling problem. Mathematics, 9.10.3390/math9030270 ↗
8. Khalid, Q.S., Arshad, M., Maqsood, S., Jahanzaib, M., Babar, A.R., Khan, I., Mumtaz, J., and Kim, S. (2019). Hybrid particle swarm algorithm for products scheduling problem in cellular manufacturing system. Symmetry, 11.10.3390/sym11060729 ↗
9. Multi-level planning and scheduling for parallel PCB assembly lines using hybrid spider monkey optimization approach10.1109/ACCESS.2019.2895954 ↗
10. Xu, G., Guan, Z., Yue, L., Mumtaz, J., and Liang, J. (2021). Modeling and optimization for multi-objective nonidentical parallel machining line scheduling with a jumping process operation constraint. Symmetry, 13.10.3390/sym13081521 ↗
11. Hybrid spider monkey optimisation algorithm for multi-level planning and scheduling problems of assembly lines10.1080/00207543.2019.1675917 ↗
12. Yue, L., Chen, Y., Mumtaz, J., and Ullah, S. (2021). Dynamic mixed model lotsizing and scheduling for flexible machining lines using a constructive heuristic. Processes, 9.10.3390/pr9071255 ↗
13. A two-level advanced production planning and scheduling model for RFID-enabled ubiquitous manufacturing10.1016/j.aei.2015.01.002 ↗
14. Bottleneck-oriented order release with shifting bottlenecks: An assessment by simulation10.1016/j.ijpe.2018.01.010 ↗
15. Necessary but not sufficient: A theory of constraints business novel
16. Drum-buffer-rope in an engineering-to-order system: An analysis of an aerospace manufacturer using data envelopment analysis (DEA)10.1016/j.ijpe.2019.09.021 ↗
17. The effect of supply chain noise on the financial performance of kanban and drum-buffer-rope: An agent-based perspective10.1016/j.eswa.2018.11.009 ↗
18. Drum buffer rope-based heuristic for multi-level rolling horizon planning in multi item production10.1080/00207543.2019.1569272 ↗
19. Research on enhancement of TOC simplified drum-buffer-rope system using novel generic procedures10.1016/j.eswa.2009.11.049 ↗
20. On the beat of the drum: Improving the flow shop performance of the drum-buffer-rope scheduling mechanism10.1080/00207543.2017.1401245 ↗
21. Modified drum-buffer-rope scheduling mechanism for a non-identical parallel machine flow shop with processing time variation10.1080/00207540600584805 ↗
22. Implementation of S-DBR in four manufacturing SMEs: A research case study10.1080/09537287.2015.1015060 ↗
23. Improving a practical DBR buffering approach using workload control10.1080/0020754031000065485 ↗
24. Simulation and scheduling implementation study of TFT-LCD Cell plants using Drum–Buffer–Rope system10.1016/j.eswa.2010.05.075 ↗
25. Design and implementation of a drum-buffer-rope pull-system10.1080/09537287.2014.926409 ↗
26. Application of the theory of constraints to bottleneck operation in a manufacturing plant10.1108/17410380510583617 ↗
27. Improving labour relations performance using a simplfied drum buffer rope (S-DBR) technique10.1080/09537287.2015.1079744 ↗
28. De Eulate, U.A.P., and Aiastui, A.L. (2021). Application of the DBR approach to a multi-project manufacturing context. Project Management and Engineering Research, Springer.10.1007/978-3-030-54410-2_10 ↗
29. Dynamic drum-buffer-rope approach for production planning and control in capacitated flow-shop manufacturing systems10.1016/j.cie.2013.04.013 ↗
30. The four faces of mass customization
31. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem10.1016/0305-0483(83)90088-9 ↗
32. Schragenheim, E., and Dettmer, H.W. (2000). Manufacturing at Warp Speed, CRC Press.10.4324/9781482279214 ↗
33. On the NEH heuristic for minimizing the makespan in permutation flow shops10.1016/j.omega.2005.03.003 ↗
34. An artificial neural network based heuristic for flow shop scheduling problems10.1007/s10845-009-0287-5 ↗
35. Sequence-dependent group scheduling problem on unrelated-parallel machines10.1016/j.eswa.2012.02.032 ↗
36. An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flow shop with sequence-dependent setup times10.1007/s10845-009-0374-7 ↗
37. Ordered mesoporous materials in catalysis10.1016/j.micromeso.2004.06.030 ↗