Methodology for Searching Representative Elements
Source abstract
Abstract
Companies have to assure their share on the global market, meet customer demands and produce customer-tailored products. With time and production line updates, the layout becomes non-optimal and product diversity only increases this problem. To stay competitive, they need to increase their productivity and eliminate waste. Due to a variety of products consisting of similar components and variants thereof, a huge number of various elements are encountered in a production process, the material flow of which is hardly manageable. Although the elements differ from each other, their representative elements can be defined. This paper will illustrate a methodology for searching representative elements (MIRE), which is a combination of the known Pareto’s analysis (also known as ABC analysis or 20/80 rule) and a calculation of a loading function, that can be based on any element feature. Results of using the MIRE methodology in a case from an industrial environment have shown that the analysis can be carried out within a very short time and this provides for permanent analysis, optimisation and, consequently, permanent improvement in the material flow through a production process. The methodology is most suitable for smaller companies as it enables rapid analysis, especially in cases when there is no pre-recorded material flow.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Advanced Manufacturing and Logistics Optimization · Manufacturing Process and Optimization · Flexible and Reconfigurable Manufacturing Systems
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Faculty of Mechanical Engineering, University of Ljubljana, 1000 Ljubljana, Slovenia
References (18)
Show source-provided references
1. Embedding Innovation: Design Thinking for Small Enterprises10.1108/02756660910942490 ↗
2. Wiendahl, H.P., Reichardt, J., and Nyhuis, P. (2015). Handbool Factory Planning and Design, Springer.10.1007/978-3-662-46391-8 ↗
3. Hybrid Algorithm Based on Priority Rules for Simulation of Workshop Production10.2507/IJSIMM15(1)3.319 ↗
4. Optimisation of the Material Flow in a Manufacturing Plant by Use of Artificial Bee Colony Algorithm10.1016/j.eswa.2013.02.029 ↗
5. Mayers, F.E., and Stewart, J.R. (2001). Motion and Time Study for Lean Manufacturing, Prentice Hall. [3rd ed.].
6. Francis, R.L., McGinnis, L.F., and White, J.A. (1992). Facility Layout and Layout: An Analytical Approach, Prentice Hall.
7. A Review of Different Approaches to the Facility Layout Problems10.1007/s00170-005-0087-9 ↗
8. Do Organisational Innovations Have Impact on Launching New Products on the Market?10.5545/sv-jme.2016.3470 ↗
9. Material Flow Optimisation of Flexible Manufacturing System Using Real Coded Genetic Algorithm (RCGA)10.1016/j.matpr.2017.11.381 ↗
10. Integration of Simulation and Lean Tools in Effective Production Systems—Case Study10.5545/sv-jme.2012.387 ↗
11. Customizing Products through Application of Group Technology10.5545/sv-jme.2012.708 ↗
12. A New Model for Multi-Criteria ABC Inventory Classification: PROAFTN Method10.1016/j.procs.2016.08.233 ↗
13. A Classification Approach Based on the Outranking Model for Multiple Criteria ABC Analysis10.1016/j.omega.2015.07.004 ↗
14. Cell Formation in Group Technology: Review, Evaluation and Directions for Future Research10.1016/S0360-8352(97)00147-2 ↗
15. Production Flow Analysis10.1049/tpe.1971.0022 ↗
16. Extended Production Flow Analysis10.1016/0736-5845(88)90060-9 ↗
17. Metaheuristic Techniques on Cell Formation in Cellular Manufacturing System10.12720/joace.1.1.49-54 ↗
18. Extended ABC analysis