Precise Mission Process Control Based on a Novel Dual-Code Group Network Plan Diagram
Source abstract
Abstract
Different from an ordinary project, a large group mission like the unmanned aerial vehicle (UAV) swarm cooperative strike mission is performed by multiple executors and needs to be strictly carried out according to the plan. Because of the complex cooperative relationships between the sub-missions that make up a large mission, a small disturbance may cause a delay in the entire plan. Therefore, the mission process must be precisely controlled in real time to resist disturbances and ensure that the mission proceeds as planned. To address the real-time process control problem of large group missions, we propose a novel dual-code group network plan diagram model that enables plan description and process tracking for complex group missions. Additionally, a mission process closed-loop feedback control system is designed that models the mission process control problem as a mapping from the mission state observation to plan adjustment. Furthermore, an analytic-based mission process control strategy is proposed and rigorously proven to converge and be effective, as well as demonstrate the maximum anti-disturbance capability. Finally, the control strategy is tested on a UAV swarm cooperative strike mission containing 56 sub-missions. The simulation results demonstrate that the proposed control strategy is capable of achieving high, fast, and accurate control for the mission process and enhancing the anti-disturbance capability of the plan by adjusting the mission plan in real time. This will provide a valuable reference for the management of large group missions.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Distributed Control Multi-Agent Systems · UAV Applications and Optimization · Security in Wireless Sensor Networks
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Air Traffic Control and Navigation School, Air Force Engineering University, Xi’an 710051, China
Equipment Management and Unmanned Aerial Vehicle Engineering School, Air Force Engineering University, Xi’an 710051, China
Funding
National Social Science Foundation of China
References (33)
Show source-provided references
1. Material requirements planning under demand uncertainty using stochastic optimization10.1111/poms.13277 ↗
2. Smart production planning and control in the Industry 4.0 context: A systematic literature review10.1016/j.cie.2020.106774 ↗
3. Machine learning for predictive scheduling and resource allocation in large scale manufacturing systems10.1016/j.compind.2020.103244 ↗
4. Models and algorithms for production planning, scheduling and sequencing problems: A holistic framework and a systematic review
5. Schedule control model for linear projects based on linear scheduling method and constraint programming10.1016/j.autcon.2013.09.008 ↗
6. Soini, M., Leskelä, I., and Seppänen, O. (2004, January 3–4). Implementation of line-of-balance based scheduling and project control system in a large construction company. Proceedings of the 12th Annual Conference of the International Group for Lean Construction, Elsinore, Denmark.
7. Li, X., Yang, J., and Fan, H. (2023). Dynamic Network Resource Autonomy Management and Task Scheduling Method. Mathematics, 11.10.3390/math11051232 ↗
8. Human-robot cooperation: Coordinating autonomous mobile robots and human order pickers10.1287/trsc.2023.1207 ↗
9. Mavri, A., Ioannou, A., and Loizides, F. (2023). A model for enhancing creativity, collaboration and pre-professional identities in technology-supported cross-organizational communities of practice. Educ. Inf. Technol., 1–42.10.1007/s10639-023-12295-2 ↗
10. Exploring the Gantt chart as a tool to highlight double report in case series published during the first wave of the COVID-19 pandemic10.1186/s13643-022-02024-0 ↗
11. Production Planning and Management Using Gantt Charts
12. Zhukovskiy, Y.L., Kovalchuk, M.S., Batueva, D.E., and Senchilo, N.D. (2021). Development of an algorithm for regulating the load schedule of educational institutions based on the forecast of electric consumption within the framework of application of the demand response. Sustainability, 13.10.3390/su132413801 ↗
13. Optimization of the modes of electric loads of power-consuming units operating in different production modes10.1063/5.0112391 ↗
14. Noorafza, M., Santos, B.F., Sharpanskykh, A., Zengerling, Z.L., Weder, C.M., Linke, F., and Grewe, V. (2023). Airline network planning considering climate impact: Assessing new operational improvements. Appl. Sci., 13.10.3390/app13116722 ↗
15. Construction project evaluation using CPM-Crashing, CPM-PERT and CCPM for minimize project delays10.1088/1742-6596/1933/1/012096 ↗
16. PERT and CPM in project management with practical examples
17. Haekal, J., and Masood, I. (2021, January 25–26). Simulation of ERP project scheduling using CPM and PERT method with promodel: A case studies in food and beverage companies in Jakarta Selatan, Indonesia. Proceedings of the AIP Conference Proceedings: 11th International Conference on Mechanical and Manufacturing Engineering 2021 (ICME’21), Parit Raja, Malaysia.
18. Aziz, A., Brohi, M.N., Soomro, T.R., Ghazal, T.M., Alzoubi, H.M., and Alshurideh, M. (2023). Aircraft Turnaround Manager (ATM): A Solution to Airport Operations. The Effect of Information Technology on Business and Marketing Intelligence Systems, Springer.10.1007/978-3-031-12382-5_36 ↗
19. A resilience assessment framework for complex engineered systems using graphical evaluation and review technique (GERT)10.1016/j.ress.2023.109298 ↗
20. Traffic scheduling and control in fully connected and automated networks10.1016/j.trc.2021.103011 ↗
21. Using schedule risk analysis with resource constraints for project control10.1016/j.ejor.2020.06.015 ↗
22. Qu, J., Wu, S., and Zhang, J. (2023). Flight delay propagation prediction based on deep learning. Mathematics, 11.10.3390/math11030494 ↗
23. Flight delay prediction based on deep learning and Levenberg-Marquart algorithm10.1186/s40537-020-00380-z ↗
24. Wei, X., Li, Y., Shang, R., Ruan, C., and Xing, J. (2023). Airport Cluster Delay Prediction Based on TS-BiLSTM-Attention. Aerospace, 10.10.3390/aerospace10070580 ↗
25. Day-ahead aircraft routing with data-driven primary delay predictions10.1016/j.ejor.2023.02.035 ↗
26. Maximizing robustness of aircraft routing with heterogeneous maintenance tasks10.1016/j.tre.2023.103237 ↗
27. Airline disruption management: A literature review and practical challenges10.1016/j.cor.2020.105137 ↗
28. Dynamic aircraft recovery problem-an operational decision support framework10.1016/j.cor.2020.104892 ↗
29. A distributionally robust optimization approach for airline integrated recovery under in-flight pandemic transmission risks10.1016/j.trc.2023.104188 ↗
30. Flight recovery method of regional multiairport based on risk control model10.1155/2020/7105381 ↗
31. Mission risk control via joint optimization of sampling and abort decisions10.1111/risa.14187 ↗
32. Optimal joint inspection and mission abort policy for a partially observable system10.1016/j.ress.2022.108870 ↗
33. Chen, K., Zhao, X., and Qiu, Q. (2022). Optimal task abort and maintenance policies considering time redundancy. Mathematics, 10.10.3390/math10091360 ↗