Bogie Stability Control and Management Using Data Driven Analysis Techniques for High-Speed Trains
Source abstract
Abstract
The bogie is a critical component of a train set. Any failure in the bogies’ structure/mechanism transmission will result in a derailment in the revenue operation. In order to prevent derailment due to bogie failures, the Bogie Instability Detection System (BIDS) is installed on high-speed trains, which provides alarms when abnormality is detected so that appropriate action can be taken. Taking the Taiwan High Speed Rail Corporation (THSRC) as an example, there have been ongoing reports of BIDS alarms since its launch. In almost every case, intermittent warnings are generated when wheel/rail interface faults occur, but no hard fault is found in the bogie’s structure or mechanism. While these reports do not constitute hard faults, corresponding operation actions and inspections are necessary nonetheless. As a result, delays and additional maintenance costs are incurred. In order to save maintenance costs and reduce delays, a decision tree algorithmic approach is proposed to study the potential factors of wheel/rail interface concerns, discover relationships between potential factors, and set up rules for BIDS alarms. In this case study, we found that temperature is the main factor for BIDS alarms; train speed, accumulated mileage, and location are subordinate factors. The proposed decision tree approach can lead to some improvements in preventive maintenance. It also suggests embedding such an intelligent algorithm into BIDS control units for drivers to avoid BIDS alarms.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Railway Engineering and Dynamics · Railway Systems and Energy Efficiency
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Department of Logistics Management, National Kaohsiung University of Science and Technology, Kaohsiung City 80778, Taiwan
References (34)
Show source-provided references
1. How Bogies Work
2. On the environmental performance of a high-speed train10.1080/23248378.2013.878296 ↗
3. European high-speed bogie technology review10.1504/IJVD.2019.101520 ↗
4. A new strategy for hunting alarm and stability evaluation for railway vehicles based on nonlinear dynamics analysis10.1177/0954409719830177 ↗
5. Suspension parameters optimum of high-speed train bogie for hunting stability robustness10.1080/23248378.2019.1625824 ↗
6. Data-driven condition-based monitoring of high-speed railway bogies10.1080/23248378.2013.790137 ↗
7. Actuator optimal placement studies of high-speed power bogie for active hunting stability10.1080/00423114.2019.1566556 ↗
8. Road Test Data Procedures for Evaluating the Hunting Instability Threshold of a Railway Vehicle from On Board Measurements10.1080/00423114.1999.12063079 ↗
9. Bleakley, S.S. (2006). Time Frequency Analysis of Railway Wagon Body Accelerations for a Low-Power Autonomous Device. [Master’s Thesis, Central Queensland University].
10. Sensitivity analysis of the critical speed in a railway bogie system with uncertain parameters10.1080/00423114.2019.1674345 ↗
11. High Speed Train Bogie Fault Signal Analysis Based on Wavelet Entropy Feature10.4028/www.scientific.net/AMR.753-755.2286 ↗
12. Fault Diagnosis of High-speed Train Bogie Based on Deep Neural Network10.1016/j.ifacol.2019.12.395 ↗
13. An experimental study on the ride comfort of the Korean high-speed train10.1111/j.1747-1567.2008.00419.x ↗
14. Mapping technological development using patent citation trees: An analysis of bogie technology10.1080/09537325.2018.1493190 ↗
15. Bogie fault diagnosis under variable operating conditions based on fast kurtogram and deep residual learning towards imbalanced data10.1016/j.measurement.2020.108191 ↗
16. Anechoic wind tunnel tests on high-speed train bogie aerodynamic noise10.1080/23248378.2016.1274685 ↗
17. Li, Y., Wang, Y., and Zhao, W. (2009, January 20–24). Bogie Failure Mode Analysis for Railway Freight Car based on FMECA. Proceedings of the 2009 8th International Conference on Reliability, Maintainability and Safety, Chengdu, China.10.1109/ICRMS.2009.5270253 ↗
18. Robustness analysis of bogie suspension components Pareto optimised values10.1080/00423114.2017.1305115 ↗
19. Numerical study on comparison of detailed flow field and aerodynamic performance of bogies of sta-tionary train and moving train10.1080/00423114.2020.1794015 ↗
20. Experimental investigation for wheel polygonisation of high-speed trains10.1080/00423114.2020.1772984 ↗
21. Bounds-based structure reliability analysis of bogie frame under variable load cases10.1016/j.engfailanal.2020.104541 ↗
22. Investigation of the effects of sleeper-passing impacts on the high-speed train10.1080/00423114.2015.1091085 ↗
23. Research on Bogie Frame Lateral Instability of High-Speed Railway Vehicle
24. Stability enhancement of a high-speed train bogie using active mass inertial actuators10.1080/00423114.2018.1469776 ↗
25. Effect of bogie fairings on the flow behaviours and aerodynamic performance of a high-speed train10.1080/00423114.2019.1607400 ↗
26. Fatigue life assessment methods for railway vehicle bogie frames10.1016/j.engfailanal.2020.104725 ↗
27. Maintenance of bogie components through vibration inspection with intelligent wireless sensors: A case study on axle-boxes and wheel-sets using the empirical mode decomposition technique10.1177/0954409714560798 ↗
28. Dynamic performance of high-speed train passing windbreak breach under unsteady crosswind10.1080/00423114.2018.1469777 ↗
29. Evaluation of Human Error Probability of Disc Brake Unit Assembly and Wheel Set Mainte-nance of Railway Bogie10.1016/j.promfg.2015.07.849 ↗
30. Dataset for The effect of a moving ground on the flow and aerodynamic noise behaviour of a simplified high-speed train bogie10.1080/23248378.2016.1212677 ↗
31. Han, J., and Kamber, M. (2006). Data Mining: Concepts and Techniques, Morgan Kaufmann Publishers.
32. Navada, A., Ansari, A.N., Patil, S., and Sonkamble, B.A. (2011, January 27–28). Overview of Use of Decision Tree Algorithms in Machine Learning. Proceedings of the 2011 IEEE Control and System Graduate Research Colloquium, Shah Alam, Malaysia.10.1109/ICSGRC.2011.5991826 ↗
33. A semi-automatic planning BOM generator based on VMI forecasting
34. Parisot, O., Ghoniem, M., and Otjacques, B. (2014, January 29–31). Decision Trees and Data Preprocessing to Help Clustering Interpretation. Proceedings of the 3rd International Conference on Data Management Technologies and Applications—DATA, Vienna, Austria.10.5220/0005001300480055 ↗