Hard roof top-cutting and gob-side roadway retention is an effective way to improve the panel recovery ratio and reduce ground pressure. Based on the condition of Pingmei No.2 Mine, this paper establishes a stability mechanics model for the roof in a trapezoidal top-cutting roadway with inclined coal seam, in order to analyze the factors influencing the stability of the roof. This paper studies the deformation characteristics and control mechanism of the surrounding rock in a trapezoidal top-cutting roadway, and proposes targeted stability control technologies for the surrounding rock. The results showed that: (1) in a trapezoidal top-cutting roadway in the hard roof with inclined coal seam, the tensile stress of the uncut roof was inversely proportional to the coal seam dip angle, roof thickness and top-cutting height, while it was proportional to the top-cutting angle. According to actual engineering conditions, the top-cutting angle and height of the roof of the 21,100-panel were determined to be 10° and 5.0 m, respectively; (2) the special structure of the trapezoidal roadway led to asymmetric stress distribution in the surrounding rock, especially in the roof and rib. Using top-cutting, the pressure relief reduced the roof stress from 6.73 MPa to 2.04 MPa, the high stress zone moved to the inside of the solid coal, and the roof slid and deformed along the top line, showing characteristics of a “large deformation on the top side”; and (3) high-strength long anchor cables were used to reinforce the roof on the cut top side. Telescopic U-shaped steel and windshield cloth were used to block gangue and prevent wind leakage in the roadway. The on-site industrial test measured the maximum subsidence of the roof at 120 mm, and the maximum layer separation was 29 mm. Relative to non-top-cutting methods, the roof and sides showed significantly reduced deformation throughout the mining operations, which verified the reliability of the control technology.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Geomechanics and Mining Engineering · Rock Mechanics and Modeling · Geoscience and Mining Technology

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

School of Mines, China University of Mining & Technology, Xuzhou 221116, China

No.2 Coal Mine, Pingdingshan Tian’an Coal Mining Co., Ltd., Pingdingshan 467000, China

School of Resources and Safety Engineering, Central South University, Changsha 410083, China

Funding

National Natural Science Foundation of China · Graduate Research and Innovation Projects in Jiangsu Province

References (25)

Show source-provided references
1. Floor heave mechanism for gob-side entry retaining with concrete blocks and control method: A case study10.1016/j.undsp.2023.09.002 ↗
2. Experimental and numerical investigations of goaf roof failure and bulking characteristics based on gob-side entry retaining by roof cutting10.1016/j.engfailanal.2024.108000 ↗
3. Study of a no-pillar mining technique with automatically formed gob-side entry retaining for longwall mining in coal mines10.1016/j.ijrmms.2018.07.005 ↗
4. Parameter determination and effect evaluation of gob-side entry retaining by directional roof cutting and pressure releasing10.1016/j.engfailanal.2023.107847 ↗
5. Zhang, K., Liu, C., Zhang, H., Yue, X., and Liu, H. (2022). Research on Roof Cutting Pressure Relief of the Gob-Side Entry Retaining With Roadside Backfilling. Front. Earth Sci., 10.10.3389/feart.2022.835497 ↗
6. Study and Application of Roof Cutting Pressure Releasing Technology in Retracement Channel Roof of Halagou 12201 Working Face
7. Stability analysis and control countermeasures of surrounding rock of gob-side entry formed by roof-cutting in inclined coal seams10.1177/01445987241227574 ↗
8. Fracture evolution of the main roof in gob-side entry retaining by roof cutting of an inclined coal seam10.1177/01445987231171409 ↗
9. Wu, H., Li, Q., Zhu, C., and He, L. (2023). Study on the failure law of surrounding rock in inclined coal seam with gob side entry. Sci. Rep., 13.10.1038/s41598-023-28238-3 ↗
10. Study of Gob-Side Entry Retaining Technology with Roof Cutting under Upper Roadway Condition10.1155/2021/7624166 ↗
11. Analysis of Strata Behavior Process Characteristics of Gob-Side Entry Retaining with Roof Cutting and Pressure Releasing Based on Composite Roof Structure10.1155/2019/2380342 ↗
12. Research on roof deformation mechanism and control strategies of self-made tunnel without coal pillars through roof cutting and pressure relief
13. Wang, Y., Gao, Y., Wang, E., He, M., and Yang, J. (2018). Roof Deformation Characteristics and Preventive Techniques Using a Novel Non-Pillar Mining Method of Gob-Side Entry Retaining by Roof Cutting. Energies, 11.10.3390/en11030627 ↗
14. Optimization of key parameters for soft and hard composite roof cutting and pressure relief in medium-thick coal seams
15. Investigation on Hydraulic Fracturing and Cutting Roof Pressure Relief Technology for Underground Mines: A Case Study10.2113/2021/4277645 ↗
16. Research on the application of hydraulic fracturing capping and pressure relief technology in roadway retention at large mining heights
17. Roof cutting and pressure relief with dense drilling for roadway protection in Songxinzhuang Coal Mine
18. Research on coal-pillar-free mining technology by cutting along the gob in the protective layer of Baijiao Mine to form a tunnel
19. Effect of mining-induced abutment pressure on gateroad and grouting-based bolting technology: A case study10.1016/j.engfailanal.2023.107421 ↗
20. Research on high-strength anchor injection control technology for deep roof cutting and gob-side lane retention
21. Thick and hard basic jacking and pressure relief tunneling and surrounding rock control technology
22. Skrzypkowski, K., Zagorski, K., Zagorska, A., Apel, D.B., Wang, J., Xu, H., and Guo, L. (2022). Choice of the Arch Yielding Support for the Preparatory Roadway Located near the Fault. Energies, 15.10.3390/en15103774 ↗
23. Movement pattern of “cantilever beam” structure in key layers of large mining height stopes and its impact on mine pressure
24. Mechanical structure and seepage stability of confined floor response to longwall mining of inclined coal seam10.1007/s11771-023-5429-y ↗
25. Study on the influence of roof cutting parameters on the stability of surrounding rock for gob-side tunnel retention