Risk Assessment Model for Railway Track Maintenance Operations Based on Combined Weights and Nonlinear FCE
Source abstract
Abstract
Current risk assessment in railway track maintenance operations faces challenges (low spatiotemporal accuracy, limited adaptability to various scenarios, and tendency of linear fuzzy comprehensive evaluation (FCE) methods to underestimate high-risk factors). To address these, this study proposes a novel risk assessment model that integrates subjective–objective weighting techniques with a nonlinear FCE approach. By incorporating spatiotemporal information, the model enables precise localization of risk occurrence in individual maintenance operations. A comprehensive risk index system is constructed across four dimensions: human, equipment, environment, and management. The game theory combined weighting method, integrating the G1 method and entropy weight method, is employed; it balances expert judgment with data-driven analysis. A cloud model is introduced to generate risk membership matrices, accounting for the fuzziness and randomness of risk data. The nonlinear FCE framework enhances the influence of high-risk factors. Risk levels are determined using the combined weights, membership matrices, and the maximum membership principle. A case study on the Lanzhou–Xinjiang Railway demonstrates that the proposed model achieves higher consistency with actual risk conditions than conventional methods, improving assessment accuracy and reliability. This model offers a practical and effective tool for risk prevention and control in railway maintenance operations.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Evaluation and Optimization Models · Risk and Safety Analysis · Evaluation Methods in Various Fields
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
State Key Lab of Advanced Rail Autonomous Operation, Beijing Jiaotong University, Beijing 100044, China
School of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044, China
Funding
Natural Science Horizontal Project
References (38)
Show source-provided references
1. Xiu, Z.L. (2019). The Design and Implementation of a Safety Supervision System for Railway Lines in Operation. [Master’s Thesis, Beijing Jiaotong University].
2. Prevention and restraining control for the construction safety accident of railway business lines
3. Li, Y. (2023). Application Research of BIM 4D Technology in Turnout Replacement Construction of Existing Lines. [Master’s Thesis, Lanzhou Jiaotong University].
4. Jiang, C. (2022). Research on Construction Safety Risk Management by the Machinery Section of Bureau A. [Master’s Thesis, Southwest Jiaotong University].
5. Zhang, Y.R. (2021). Research on Safety Risk Management of Construction and Signal Cooperation with Operation in Ordinary Speed Railway. [Master’s Thesis, Lanzhou Jiaotong University].
6. Song, Z.Q. (2023). Research on Safety Risk Assessment and Preventive Measures of Track Maintenance Operation in Large-Scale Railway Marshalling Station Construction Project. [Master’s Thesis, East China Jiaotong University].
7. Han, M. (2023). Research on Safety Management Evaluation of Large-Scale Railway Road Maintenance Machinery. [Master’s Thesis, Beijing Jiaotong University].
8. Evaluating operational risk for train control system using a revised risk matrix and FD-FAHP-Cloud model: A case in China10.1016/j.engfailanal.2022.106268 ↗
9. Liang, H.B., Xie, X.G., Chen, X.X., Li, Q., He, W., Yang, Z., and Ren, M. (2025). Study on risk assessment of tunnel construction across mined-out region based on combined weight-two-dimensional cloud model. Sci. Rep., 15.10.1038/s41598-025-90837-z ↗
10. Urban flooding risk assessment based on GIS- game theory combination weight: A case study of Zhengzhou City10.1016/j.ijdrr.2022.103080 ↗
11. Sun, N., Li, C.L., Guo, B.Y., Sun, X., Yao, Y., and Wang, Y. (2023). Urban Flood Risk Assessment Based on FAHP-EWM Combination Weighting: A Case Study in Beijing. Geomat. Nat. Hazards Risk, 14.10.1080/19475705.2023.2240943 ↗
12. The Improved Risk Assessment Method Is Based on a Comprehensive Weighting Algorithm for Railway Signalling Safety Analysis10.1016/j.ssci.2020.104768 ↗
13. Risk Assessment Model for TBM Construction Based on Nonlinear Fuzzy Analytic Hierarchy Process
14. Risk Assessment of Shield Construction Adjacent to the Existing Shield Tunnels Based on Improved Nonlinear FAHP10.1016/j.tust.2024.106154 ↗
15. Weighted Clustering-Based Risk Assessment of Urban Rainstorms and Flood Disasters10.1016/j.uclim.2021.100974 ↗
16. Guo, F., Lv, X.N., Gu, J.L., and Wu, Y.L. (2024). Use of Weighted Euclidean Distance to Assist in the Selection of Safety Risk Prevention and Control Strategies for Major Railway Projects. Buildings, 14.10.3390/buildings14051270 ↗
17. Risk of Face Stability in Slurry Shield Tunnelling Based on the Hybrid Cloud-BN Model
18. A Fuzzy Comprehensive Evaluation Model for Flood Risk Was Based on the Combined Weights of Game Theory10.1007/s11069-015-1645-6 ↗
19. New Cognitive Model: Cloud Model10.1002/int.20340 ↗
20. Assessing the Spatiotemporal Variability of Lake Water Quality Using a Novel Multidimensional Shape–Position Similarity Cloud Model10.1016/j.jhydrol.2021.126379 ↗
21. Li, D.Y., and Du, Y. (2014). Artificial Intelligence with Uncertainty, National Defense Industry Press. [2nd ed.].
22. Evaluation Model for the Reflection of Dominant Influencing Factors
23. Cement Pavement Performance Evaluation Based on Nonlinear Fuzzy Method
24. (2022). Classification and Code for Hazardous and Harmful Factors in Process (Standard No. GB/T 13861-2022).
25. Safety Supervision Department of Ministry of Railways (2012). Implementation Guidelines for Safety Risk Management in Railway Engineering Systems: Document No. Yun-Gong-Gao-Xian [2012] 124, China Railway Publishing House.
26. Construction Safety Risk Analysis of Business Lines Based on Improved FP-Growth Algorithm and Bayesian Method
27. Liu, X. (2016). Study the Relevance of Drivers’ Experiences and Traffic Accidents. [Master’s Thesis, Chang’an University].
28. China State Railway Group Co., Ltd. (2014). Technical Management Regulations for Railways: General-Speed Railway Section, China Railway Publishing House.
29. Heijer, T., Hale, A.R., and Koornneef, F. (2003, January 15–18). Systematic Derivation of Safety Rules for Railway Operations. Proceedings of the 14th European Safety and Reliability Conference (ESREL 2003), Maastricht, The Netherlands.
30. Climate Change Affects Assessment of Railway Infrastructure in Urban Environments10.1016/j.scs.2023.105084 ↗
31. Development of a Deep Neural Network-Based Life Accident Evaluation Model for Weather-Related Railway Accidents10.1007/s12205-024-0042-7 ↗
32. Quantitative Evaluation of the Traffic Environment Complexity for Unmanned Vehicles in Urban Roads10.1109/ACCESS.2021.3054882 ↗
33. Risk Assessment of Bridge Construction Safety Considering Multi-information Fusion
34. A Novel Learning Cloud Bayesian Network for Risk Measurement10.1016/j.asoc.2019.105947 ↗
35. Saldan, O., Nichoha, V., Storozh, V., and Stefanyshyn, I. (2016, January 23–26). Experimental Research of Signals of Defects Such as the Transverse Cracks on the Rail Imitator. Proceedings of the 13th International Conference on Modern Problems of Radio Engineering, Telecommunications and Computer Science (TCSET), Lviv, Ukraine.10.1109/TCSET.2016.7452019 ↗
36. Fry, G.T. (1995). Fatigue Model of Thermite Rail Welds. [Ph.D. Thesis, University of Illinois].
37. YOLO-VSI: An Improved YOLOv8 Model for Detecting Railway Turnout Defects in Complex Environments
38. Semi-Conv-DETR: Railway Ballast Bed Defect Detection Model Integrating Convolutional Augmentation and Semi-supervised DETR10.1016/j.trgeo.2024.101334 ↗