journal article·2025-09-19Open access

Optimization Study on Key Parameters for Mechanical Excavation of Deep-Buried Large-Section Metro Station

Chenyang Zhu, Xin Huang, Fei Wang, Meng Huang, Chanlong He, Jiaqi Guo

Applied Sciences· Volume 15· Issue 18

Abstract

When mechanically excavating deep-buried large-section metro stations, stringent deformation control requirements for the surrounding rock must be adhered to. Calculations indicate that horizontal convergence in certain areas of the station exceeds acceptable limits, necessitating adjustments to construction parameters to comply with these requirements. This study, based on a project for the Chongqing Metro Line 18, establishes a three-dimensional numerical analysis model for an underground excavation station by utilizing the characteristics of the stratum-structure model. A comprehensive 3D numerical simulation was conducted to evaluate the deformation characteristics of the stratum and surrounding rock resulting from excavation, and to determine optimal excavation parameters based on deformation control. The key findings are as follows: (1) Under the original excavation design parameters, the horizontal convergence displacement at the arch foot met specification requirements and was smaller than that at the sidewall. However, the horizontal convergence displacement at the sidewall exceeded the 20 mm limit specified by the relevant codes, failing to satisfy deformation control standards. (2) The deformation of the surrounding rock increased with factors such as the distance between the excavation face and the initial support, as well as the length of the excavation step. While the spacing between adjacent pilot tunnels had a relatively minor impact on overall station deformation, the number of pilot tunnels, in conjunction with other parameters, proved beneficial for controlling surrounding rock deformation. (3) Among the parameters examined, the distance between the excavation face and the initial support, along with the excavation step length, exerted the greatest influence on deformation. Based on deformation control criteria, the optimal excavation parameters were determined as follows: the distance between the excavation face and the initial support should not exceed 6 m; the excavation step length is set to 1.5 m; the number of pilot tunnels is established at 11; and the spacing between adjacent pilot tunnels is set at 10.5 m. (4) Field monitoring data closely corresponded with the effects observed from implementing the optimized parameters, thus validating the reliability of the optimization scheme. The results of this study provide a valuable reference for the excavation of metro stations under similar conditions in the future.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Geotechnical Engineering and Analysis · Civil and Geotechnical Engineering Research · Grouting, Rheology, and Soil Mechanics

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

School of Civil Engineering, Henan Polytechnic University, Jiaozuo 454003, China

Key Laboratory of Intelligent Construction and Safety Operation and Maintenance of Underground Engineering in Henan Province, Jiaozuo 454003, China

CCCC-SHB Fourth Engineering Co., Ltd., Luoyang 471013, China

Funding

University Science and Technology Innovation Team of Henan · Cultivation project of “Double first-class” creation of safety discipline · Enterprise Commissioned Project · Distinguished Young Scientists of Henan Polytechnic University

References (35)

Show source-provided references
1. Investigating the impact of blasting operations on dynamic disturbances in existing tunnels during additional tunnel construction
2. Study on mechanical behaviors and spatiotemporal effects in mechanized large-section tunnelling
3. Mechanical characteristics of special-shaped structure during construction process of cut-and-cover four-line tunnel
4. Study on construction control scheme of new open-cut tunnel over existing metro tunnel
5. Three-lane super large section rectangular pipe-jacking tunnel underpassing Nanhu Avenue in Jiaxing, China
6. Review and prospect of the mining construction methods for subway stations in China
7. Discussion on the design of deep-buried metro stations in loess strata
8. Key technology of local underground and enlarged excavation construction of subway open-cut station underpassing existing buildings
9. Key technologies for shallow-buried metro station construction using the NATM method in sandy-gravel strata
10. Spatio-temporal prediction of deep excavation-induced ground settlement: A hybrid graphical network approach considering causality10.1016/j.tust.2024.105605 ↗
11. Deep excavation–induced stability evaluation of a triple tunnel using discrete and continuum numerical modeling10.1061/IJGNAI.GMENG-9963 ↗
12. Ground settlement caused by perpendicularly crossing twin tunnels: A parametric study10.1016/j.tust.2024.105657 ↗
13. Estimation of the excavation damage zone in TBM tunnel using large deformation FE analysis
14. Mechanical response of horseshoe-shaped tunnel lining to undercrossing construction of a new subway station10.1016/j.tust.2022.104652 ↗
15. A simplified combined analytical method for evaluating the effect of deep surface excavations on the shield metro tunnels
16. Numerical simulation of deep excavation considering strain-dependent behavior of soil: A case study of Tangluo Street Station of Nanjing Metro10.1007/s40999-022-00755-8 ↗
17. Corner and partition wall effects on the settlement of a historical building near a supported subway excavation in soft soil10.1016/j.compgeo.2020.103805 ↗
18. Effect of soil models on the prediction of tunnelling-induced deformations of structures10.1680/jgeen.18.00127 ↗
19. Xu, L., Xu, Y., Wang, C., and Feng, K. (2019). Data-driven deformation reliability of retaining structures in deep excavations considering measurement error. Appl. Sci., 9.10.3390/app9245466 ↗
20. A theoretical study on ground surface settlement induced by a braced deep excavation10.1080/19648189.2020.1739563 ↗
21. Effect of pipe characteristics in umbrella arch method on controlling tunnelling-induced settlements in soft grounds10.1016/j.jrmge.2020.05.001 ↗
22. Derivation of model parameters for numerical analysis of the Ivens shaft excavation10.1016/j.enggeo.2016.12.005 ↗
23. Monitoring and displacements at Heathrow Express Terminal 4 station tunnels10.1680/geot.2006.56.5.323 ↗
24. Prediction and performance of deep excavations for Courthouse Station, Boston10.1061/(ASCE)GT.1943-5606.0001246 ↗
25. Wang, X., and Wang, C. (2025). Exploration and practice of a new NATM construction method for large-span metro stations in urban areas. Urban Rail Transit Res., 28.
26. Study on construction methods and mechanical characteristics of large metro stations in expansive soil strata in Chengdu
27. Analysis of deformation patterns during excavation using the top-down method for deep foundation pits of metro stations in sandy soil areas
28. Application of observational method at Crossrail Tottenham Court Road station, UK10.1680/geng.13.00035 ↗
29. Construction dewatering in a metro station incorporating buttress retaining wall to limit ground settlement: Insights from experimental modelling10.1016/j.tust.2021.104124 ↗
30. Simulation-hybrid approach to protecting aging bridges against nearby tunnel excavation10.1061/(ASCE)CF.1943-5509.0001197 ↗
31. Ground behavior due to dewatering inside a foundation pit considering the barrier effect of preexisting building piles on aquifer flow10.1061/JGGEFK.GTENG-11978 ↗
32. Investigation of the first quasi-rectangular metro tunnel constructed by the 0-θ method10.1007/s11709-023-0991-9 ↗
33. Study on the stability of surrounding rock and initial support structure of plane crossing tunnel
34. Yari, M., Armaghani, D.J., Maraveas, C., Ejlali, A.N., Mohamad, E.T., and Asteris, P.G. (2023). Several tree-based solutions for predicting flyrock distance due to mine blasting. Appl. Sci., 13.10.3390/app13031345 ↗
35. Application of bio and nature-inspired algorithms in agricultural engineering10.1007/s11831-022-09857-x ↗